Polešovice – walkways of Školní Street, II. Stage (Q63008): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: translated_label)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Czech Republic financed by DG Regio
Project Q63008 in Czech Republic
description / csdescription / cs
Projekt v České republice financovaný DG Regio
Projekt Q63008 v Czechia

Revision as of 00:59, 29 October 2020

Project Q63008 in Czech Republic
Language Label Description Also known as
English
Polešovice – walkways of Školní Street, II. Stage
Project Q63008 in Czech Republic

    Statements

    0 references
    1,424,310.3 Czech koruna
    0 references
    56,972.41 Euro
    1 October 2020
    0 references
    1,499,274.0 Czech koruna
    0 references
    59,970.96 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    1 January 2018
    0 references
    31 October 2018
    0 references
    31 October 2018
    0 references
    Městys Polešovice
    0 references
    0 references

    49°1'53.8"N, 17°19'45.5"E
    0 references
    68737
    0 references
    Předmětem projektu je rekonstrukce stávajících chodníků a jimi vyvolané stavební úpravy místní komunikace. V rámci stavby je navržena šířková úprava chodníku na minimální hodnotu 1,50 m a nový povrch z betonové zámkové dlažby. Celkem budou rekonstruovány chodníky v délce 320,2 m a ploše 480,3 m2. Prioritou stavby je zajistit bezpečné propojení komunikačních tras pro pěší na přístupové cestě k základní škole. (Czech)
    0 references
    The object of the project is the reconstruction of existing sidewalks and the construction works of the local road. Within the construction, the width of the pavement is designed to a minimum value of 1.50 m and a new surface made of concrete lock paving. In total, sidewalks in length of 320.2 m and an area of 480.3 m² will be reconstructed. The priority of the construction is to ensure secure connection of communication routes for pedestrians on the access road to the primary school. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0008494