Extension of the pavement ul. JihChinese, Příbor (Q63684): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The subject of the project is the construction of a pavement at Jihago Street in the section following the junction of ul. Round of the existing pedestrian body, ul. South China before RD 549, including pedestrian crossings and lighting. The walkway will be customised to persons with reduced mobility and the side of the project is the building of elements leading to safer pedestrian safety — safety lighting of the transition with LED lamps, op...) |
(Created claim: summary (P836): The object of the project is the construction of a pavement on Jičínská Street in the section from the connection to ul. Circular along the existing pavement body on ul. Jičín before RD No. 549, including the pedestrian crossing and its illumination. The pavement will be adapted to people with reduced mobility.The project also includes the building of elements leading to increased pedestrian traffic safety – safety lighting of the transition wit...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of a pavement on Jičínská Street in the section from the connection to ul. Circular along the existing pavement body on ul. Jičín before RD No. 549, including the pedestrian crossing and its illumination. The pavement will be adapted to people with reduced mobility.The project also includes the building of elements leading to increased pedestrian traffic safety – safety lighting of the transition with LED lights, optical psychological brakes, radar speed indicator. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of a pavement on Jičínská Street in the section from the connection to ul. Circular along the existing pavement body on ul. Jičín before RD No. 549, including the pedestrian crossing and its illumination. The pavement will be adapted to people with reduced mobility.The project also includes the building of elements leading to increased pedestrian traffic safety – safety lighting of the transition with LED lights, optical psychological brakes, radar speed indicator. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of a pavement on Jičínská Street in the section from the connection to ul. Circular along the existing pavement body on ul. Jičín before RD No. 549, including the pedestrian crossing and its illumination. The pavement will be adapted to people with reduced mobility.The project also includes the building of elements leading to increased pedestrian traffic safety – safety lighting of the transition with LED lights, optical psychological brakes, radar speed indicator. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 13:50, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the pavement ul. JihChinese, Příbor |
Project in Czech Republic financed by DG Regio |
Statements
758,039.31 Czech koruna
0 references
797,936.12 Czech koruna
0 references
95.0 percent
0 references
31 July 2020
0 references
Město Příbor
0 references
74258
0 references
Předmětem projektu je výstavba chodníku na ulici Jičínská v úseku od napojení ul. Okružní po stávající chodníkové těleso na ul. Jičínské před RD č.p. 549, včetně přechodu pro chodce a jeho nasvětlení. Chodník bude přizpůsobený osobám s omezenou schopností pohybu a orientace.Součástí projektu je také budování prvků vedoucích k zvyšování bezpečnosti pěší dopravy - bezpečnostní osvětlení přechodu s LED svítidly, optické psychologické brzdy, radarový ukazatel rychlosti. (Czech)
0 references
The object of the project is the construction of a pavement on Jičínská Street in the section from the connection to ul. Circular along the existing pavement body on ul. Jičín before RD No. 549, including the pedestrian crossing and its illumination. The pavement will be adapted to people with reduced mobility.The project also includes the building of elements leading to increased pedestrian traffic safety – safety lighting of the transition with LED lights, optical psychological brakes, radar speed indicator. (English)
23 October 2020
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_038/0010998
0 references