NKP rad Velheartica — Shining jewelry (Q64634): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project named Hrad Veharticis — Šumava Zjetuk is primarily addressing the regeneration of the external sheath of the castle’s castle and the preservation of the Guyotic and Renaissance eyes. On the ground floor and in the cellars, the Humert wing creates a new route of viewing the end of hussian wars and the entry of Jiří z Poděbrad to the royal thrins. The project addresses an unsuitable building stock technical status of national cultura...) |
(Created claim: summary (P836): The project called Velhartice Castle – Šumavská Jewelry deals primarily with the reconstruction of the outer shell of Huert’s wing of the castle and the preservation of Gothic and Renaissance plaster. On the ground floor, virtually in the cellars, Huert’s wing will create a new tour dedicated to the period of the end of the Hussite wars and the rise of George of Poděbrady to the royal throne. The project solves the unsuitable technical state of...) |
||||||||||||||
Property / summary | |||||||||||||||
The project called Velhartice Castle – Šumavská Jewelry deals primarily with the reconstruction of the outer shell of Huert’s wing of the castle and the preservation of Gothic and Renaissance plaster. On the ground floor, virtually in the cellars, Huert’s wing will create a new tour dedicated to the period of the end of the Hussite wars and the rise of George of Poděbrady to the royal throne. The project solves the unsuitable technical state of the National Cultural Monument and makes the castle inaccessible. (English) | |||||||||||||||
Property / summary: The project called Velhartice Castle – Šumavská Jewelry deals primarily with the reconstruction of the outer shell of Huert’s wing of the castle and the preservation of Gothic and Renaissance plaster. On the ground floor, virtually in the cellars, Huert’s wing will create a new tour dedicated to the period of the end of the Hussite wars and the rise of George of Poděbrady to the royal throne. The project solves the unsuitable technical state of the National Cultural Monument and makes the castle inaccessible. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project called Velhartice Castle – Šumavská Jewelry deals primarily with the reconstruction of the outer shell of Huert’s wing of the castle and the preservation of Gothic and Renaissance plaster. On the ground floor, virtually in the cellars, Huert’s wing will create a new tour dedicated to the period of the end of the Hussite wars and the rise of George of Poděbrady to the royal throne. The project solves the unsuitable technical state of the National Cultural Monument and makes the castle inaccessible. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 13:35, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | NKP rad Velheartica — Shining jewelry |
Project in Czech Republic financed by DG Regio |
Statements
2,835,749.05 Czech koruna
0 references
2,984,999.0 Czech koruna
0 references
95 percent
0 references
31 December 2019
0 references
Národní památkový ústav
0 references
11800
0 references
Projekt nazvaný Hrad Velhartice - Šumavská klenotnice řeší primárně obnovu vnějšího pláště Huertova křídla hradu a konzervaci gotických a renesančních omítek. V přízemí, resp. ve sklepích, Huertova křídla vznikne nová prohlídková trasa věnovaná období konce husitských válek a nástupu Jiřího z Poděbrad na královský trůn. Projekt řeší nevhodný stavebně technický stav národní kulturní památky a zpřístupňuje dosud nepřístupné prostory hradu. (Czech)
0 references
The project called Velhartice Castle – Šumavská Jewelry deals primarily with the reconstruction of the outer shell of Huert’s wing of the castle and the preservation of Gothic and Renaissance plaster. On the ground floor, virtually in the cellars, Huert’s wing will create a new tour dedicated to the period of the end of the Hussite wars and the rise of George of Poděbrady to the royal throne. The project solves the unsuitable technical state of the National Cultural Monument and makes the castle inaccessible. (English)
23 October 2020
0 references
Identifiers
CZ.06.4.59/0.0/0.0/16_073/0006491
0 references