Sewage system and WWTP, Stage 1 (Q60352): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project addresses the construction of a gravitational sewerage system of 4 393.52 m in the central part of the municipality of Řepště. The sewerage system will be driven by local communications, along the II/477 road, the free terrain and the sewerage system to the WWTP, along the Datyňová river. There are around 139 family homes, primary schools, nurseries, municipal offices, TJ and centres. The construction of the wastewater treatment pl...)
(‎Created claim: summary (P836): The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social...)
Property / summary
 
The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English)
Property / summary: The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English) / rank
 
Normal rank
Property / summary: The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:14, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Sewage system and WWTP, Stage 1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    31,144,879.45 Czech koruna
    0 references
    1,245,795.18 Euro
    10 January 2020
    0 references
    48,854,712.86 Czech koruna
    0 references
    1,954,188.51 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    3 September 2018
    0 references
    31 December 2020
    0 references
    Obec Řepiště
    0 references
    0 references
    0 references

    49°45'31.14"N, 18°19'30.25"E
    0 references
    73932
    0 references
    Projekt řeší vybudování gravitační splaškové kanalizace v délce 4393.52 m v centrální části obce Řepiště. Kanalizace bude vedena místními komunikacemi, podél silnice II/477, volným terénem a před napojením kanalizace na ČOV je kanalizace vedena podél řeky Datyňka. Jedná se o odkanalizování cca 139 rodinných domů, základní školy, školky, obecního úřadu, budovy TJ Řepiště a společenského centra. Výstavba ČOV bude realizována na parcele číslo: 1531/3. Bude vybudováno 713.37 m gravitačních přípojek. (Czech)
    0 references
    The project solves the construction of gravitational sewage sewage in the length of 4393.52 m in the central part of the village Řepiště. The sewerage will be guided by local roads, along road II/477, free terrain and before the sewerage system is connected to the WWTP, the sewerage system is led along the river Datyňka. It is a drainage of about 139 family houses, primary schools, kindergartens, municipal office, TJ Řepiště building and social centre. The construction of the WWTP will be carried out on parcel number: IT’S 1531/3. 713,37 metres of gravity connections will be built. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004724
    0 references