Týnec flood warning system (Q58265): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The present project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and the subsequent digitalisation of the flood protection plan. Its objective is to help the correct assessment of flood hazard, the protection of citizens’ health and property in the field of interest and the improvement of the existing flood protection system., remove_old_english_translation)
(‎Created claim: summary (P836): The project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and subsequent digitisation of the flood plan. Its aim is to help to properly assess flood hazards, protect the health and property of citizens in the interest area and improve the current flood protection system., translated_summary)
Property / summary
 
The project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and subsequent digitisation of the flood plan. Its aim is to help to properly assess flood hazards, protect the health and property of citizens in the interest area and improve the current flood protection system. (English)
Property / summary: The project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and subsequent digitisation of the flood plan. Its aim is to help to properly assess flood hazards, protect the health and property of citizens in the interest area and improve the current flood protection system. (English) / rank
 
Normal rank
Property / summary: The project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and subsequent digitisation of the flood plan. Its aim is to help to properly assess flood hazards, protect the health and property of citizens in the interest area and improve the current flood protection system. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:05, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Týnec flood warning system
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,354,966.2 Czech koruna
    0 references
    54,198.65 Euro
    10 January 2020
    0 references
    1,935,666.0 Czech koruna
    0 references
    77,426.64 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    15 September 2016
    0 references
    6 December 2018
    0 references
    31 December 2018
    0 references
    Obec Týnec
    0 references
    0 references
    0 references

    48°46'43.46"N, 17°0'43.52"E
    0 references
    69154
    0 references
    Předkládaný projekt je zaměřen na preventivní protipovodňová opatření spočívající v instalaci lokálního výstražného a varovného systému a následnou digitalizaci povodňového plánu. Jeho cílem je napomoci správnému posouzení povodňového nebezpečí, ochraně zdraví a majetku občanů v zájmové oblasti a zlepšení stávajícího systému povodňové ochrany. (Czech)
    0 references
    The project is aimed at preventive flood prevention measures consisting of the installation of a local warning and warning system and subsequent digitisation of the flood plan. Its aim is to help to properly assess flood hazards, protect the health and property of citizens in the interest area and improve the current flood protection system. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_035/0002184
    0 references