Continuation of the walkway in ul. Vysočina (Q62484): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The objective of the project is the creation of a missing pedestrian communication, which will ensure the accessibility of the industrial zone and of the local parts of Dvorko and Nořín. This objective will be achieved by building a corridor (continuation of the walkway) in ul. The Vysočina region of the associated transport area of the road traffic passage area II/357, which will be separated from the traffic area by a green belt. The length...)
(‎Created claim: summary (P836): The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330...)
Property / summary
 
The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English)
Property / summary: The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:04, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Continuation of the walkway in ul. Vysočina
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,175,992.73 Czech koruna
    0 references
    47,039.71 Euro
    1 October 2020
    0 references
    1,237,887.09 Czech koruna
    0 references
    49,515.48 Euro
    1 October 2020
    0 references
    95.0 percent
    0 references
    1 October 2017
    0 references
    30 June 2019
    0 references
    30 June 2019
    0 references
    Město Choceň
    0 references
    0 references

    50°0'15.8"N, 16°13'9.8"E
    0 references
    56501
    0 references
    Cílem projektu je vytvoření chybějící komunikace pro pěší, která zajistí pěší dostupnost průmyslové zóny a místních částí Dvořisko a Nořín. Tohoto cíle bude dosaženo výstavbou chodníku (pokračováním chodníku) v ul. Vysokomýtská v přidruženém dopravním prostoru průjezdního úseku silnice II/357, který bude od hlavního dopravního prostoru oddělen zeleným pásem. Délka navrhovaného chodníku je 330,62m, Šířka chodníku je v celé délce navržena v minimální hodnotě 1,75m. (Czech)
    0 references
    The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0007174
    0 references