Remediation of the former EXATHERM factory, Železný Brod (Q62356): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Remediation of the former EXATHERM factory, Železný Brod

Revision as of 11:52, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Remediation of the former EXATHERM factory, Železný Brod
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,515,500.3 Czech koruna
    0 references
    300,620.01 Euro
    10 January 2020
    0 references
    8,841,765.06 Czech koruna
    0 references
    353,670.60 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    1 December 2016
    0 references
    21 January 2019
    0 references
    27 January 2019
    0 references
    Město Železný Brod
    0 references
    0 references
    0 references

    50°38'55.21"N, 15°14'19.79"E
    0 references
    46822
    0 references
    Stav areálu, který se nachází v širším středu města, a související kontaminace Hg (jak ve stěnách a podlaze, tak v ovzduší) zcela vylučuje jakýkoli způsob jeho využívání v budoucnosti. Sanace představuje odstranění budov a kontaminovaných zemin, včetně kanalizace s odsazovací nádrží za areálem. Součástí projektu je zejména podrobně zpracovaný návrh způsobu sanačně-demoličních prací včetně řešení nakládání s odpady, řešení problematiky BOZP, řízení akce, monitoring a průkaz dosažení cílů sanace. (Czech)
    0 references
    The state of the complex, located in the wider centre of the city, and associated Hg contamination (both in walls and floors and in the atmosphere) completely excludes any way of using it in the future. The remediation represents the removal of buildings and contaminated soils, including sewerage with a deposition tank behind the premises. Part of the project is in particular a detailed design of the method of remediation and demolition work including waste management, solution of OSH issues, action management, monitoring and proof of achievement of the objectives of remediation. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.3.24/0.0/0.0/16_036/0002493
    0 references