(Removed claim: summary (P836): The purpose of a building is to avoid scalding and to ensure the stability of the rock mass between the rebuilding of the Chelčicko-Lhenicko area and the Vrhatic in Údog’s land division (cadastral district) No 526/3 (cadastral district). Úpice). At present, there are sometimes spontaneous loss of stones and rocks from the rock mass. The drop in energy released by the bedrock jeopardises traffic in the aftermath of the Chelčicko-Lhenicko area....) |
(Created claim: summary (P836): The purpose of the construction is to prevent rocky plumbing and to ensure stability of the rock massif between the street Chelčický and Vrchlický in Úpici on the land p.p. no. 526/3 (k.ú. It’s an assassin. At present, there is sometimes a spontaneous loss of stones and blocks from rock massifs. The fall energy of the loose rock parts threatens traffic along the road between Chelčický and Vrchlický Street. The total ground plan area of the stati...) |
||||||||||||||
Property / summary | |||||||||||||||
The purpose of the construction is to prevent rocky plumbing and to ensure stability of the rock massif between the street Chelčický and Vrchlický in Úpici on the land p.p. no. 526/3 (k.ú. It’s an assassin. At present, there is sometimes a spontaneous loss of stones and blocks from rock massifs. The fall energy of the loose rock parts threatens traffic along the road between Chelčický and Vrchlický Street. The total ground plan area of the static locking is 232 m². (English) | |||||||||||||||
Property / summary: The purpose of the construction is to prevent rocky plumbing and to ensure stability of the rock massif between the street Chelčický and Vrchlický in Úpici on the land p.p. no. 526/3 (k.ú. It’s an assassin. At present, there is sometimes a spontaneous loss of stones and blocks from rock massifs. The fall energy of the loose rock parts threatens traffic along the road between Chelčický and Vrchlický Street. The total ground plan area of the static locking is 232 m². (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The purpose of the construction is to prevent rocky plumbing and to ensure stability of the rock massif between the street Chelčický and Vrchlický in Úpici on the land p.p. no. 526/3 (k.ú. It’s an assassin. At present, there is sometimes a spontaneous loss of stones and blocks from rock massifs. The fall energy of the loose rock parts threatens traffic along the road between Chelčický and Vrchlický Street. The total ground plan area of the static locking is 232 m². (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:41, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Sky-keeping supplies between CHLOV and Vrovicky in Úpke — Stage A |
Project in Czech Republic financed by DG Regio |
Statements
1,118,782.79 Czech koruna
0 references
1,316,215.05 Czech koruna
0 references
85.0 percent
0 references
1 September 2020
0 references
MĚSTO ÚPICE
0 references
54232
0 references
Účelem stavby je zamezit skalnímu řícení a zajistit stabilitu skalního masivu mezi ulicí Chelčického a Vrchlického v Úpici na pozemku p.p.č. 526/3 (k.ú. Úpice). V současné době občas dochází k samovolnému vypadávání kamenů a bloků ze skalního masivu. Pádová energie uvolněných skalních částí ohrožuje provoz po komunikaci mezi ulicí Chelčického a Vrchlického. Celková půdorysná plocha statického zajištění je 232 m2. (Czech)
0 references
The purpose of the construction is to prevent rocky plumbing and to ensure stability of the rock massif between the street Chelčický and Vrchlický in Úpici on the land p.p. no. 526/3 (k.ú. It’s an assassin. At present, there is sometimes a spontaneous loss of stones and blocks from rock massifs. The fall energy of the loose rock parts threatens traffic along the road between Chelčický and Vrchlický Street. The total ground plan area of the static locking is 232 m². (English)
23 October 2020