The creation of lapianos and the professional background of the Sipberg Castle (Q59916): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at revitalising buildings within the framework of the NKP Šilbert, which is not only technically but also hygienically in the emergency situation. A further objective is the release of inaccessible areas for visitors to the premises of the NKP Shipberk, a toy water body. This is a unique monument that is not yet accessible as a result of its technical solutions and construction status. As a result of building interventions, th...) |
(Created claim: summary (P836): The aim of the project is to revitalise the buildings within the Špilberk NKP, which are in a state of emergency not only from a technical but also hygienic point of view – the northern annex. Another goal is to make available for visitors not yet accessible areas of the NKP Špilberk, castle water towers. It is a unique monument, which is still inaccessible due to its technical design and construction. As a result of construction interventions,...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to revitalise the buildings within the Špilberk NKP, which are in a state of emergency not only from a technical but also hygienic point of view – the northern annex. Another goal is to make available for visitors not yet accessible areas of the NKP Špilberk, castle water towers. It is a unique monument, which is still inaccessible due to its technical design and construction. As a result of construction interventions, the possibility of creating a new, unique exhibition located in the authentic premises of the castle will be created. (English) | |||||||||||||||
Property / summary: The aim of the project is to revitalise the buildings within the Špilberk NKP, which are in a state of emergency not only from a technical but also hygienic point of view – the northern annex. Another goal is to make available for visitors not yet accessible areas of the NKP Špilberk, castle water towers. It is a unique monument, which is still inaccessible due to its technical design and construction. As a result of construction interventions, the possibility of creating a new, unique exhibition located in the authentic premises of the castle will be created. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to revitalise the buildings within the Špilberk NKP, which are in a state of emergency not only from a technical but also hygienic point of view – the northern annex. Another goal is to make available for visitors not yet accessible areas of the NKP Špilberk, castle water towers. It is a unique monument, which is still inaccessible due to its technical design and construction. As a result of construction interventions, the possibility of creating a new, unique exhibition located in the authentic premises of the castle will be created. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:21, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The creation of lapianos and the professional background of the Sipberg Castle |
Project in Czech Republic financed by DG Regio |
Statements
95,990,817.17 Czech koruna
0 references
112,930,373.15 Czech koruna
0 references
85.0 percent
0 references
31 May 2020
0 references
Statutární město Brno
0 references
60200
0 references
Cílem projektu je revitalizace budov v rámci NKP Špilberk, který jsou v havarijním stavu nejen z technického, ale i hygienického hlediska - severní přístavek. Dalším cílem je zpřístupnění dosud pro návštěvníky nedostupných prostor NKP Špilberk, hradních vodojemů. Jedná se o unikátní památku, která je v důsledku svého technického řešení a konstrukčního stavu zatím nepřístupná. V důsledku stavebních zásahů vznikne možnost vytvoření nové, jedinečné expozice umístěné v autentických prostorách hradu. (Czech)
0 references
The aim of the project is to revitalise the buildings within the Špilberk NKP, which are in a state of emergency not only from a technical but also hygienic point of view – the northern annex. Another goal is to make available for visitors not yet accessible areas of the NKP Špilberk, castle water towers. It is a unique monument, which is still inaccessible due to its technical design and construction. As a result of construction interventions, the possibility of creating a new, unique exhibition located in the authentic premises of the castle will be created. (English)
23 October 2020
0 references
Identifiers
CZ.06.3.33/0.0/0.0/15_015/0000294
0 references