TŘEBOŇ, OLD GUARD — SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANT (Q59912): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the construction of ČOV and the sewage system (with one service station) in Staré guarded, the local area of Třebose. 243 permanent living population will be linked to the new sewerage system. The wastewater treatment plant is designed with a capacity of 304 EO., remove_old_english_translation) |
(Created claim: summary (P836): The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English) | |||||||||||||||
Property / summary: The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:21, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | TŘEBOŇ, OLD GUARD — SEWERAGE SYSTEM AND WASTEWATER TREATMENT PLANT |
Project in Czech Republic financed by DG Regio |
Statements
12,998,436.93 Czech koruna
0 references
20,389,705.0 Czech koruna
0 references
63.75 percent
0 references
1 October 2016
0 references
31 March 2019
0 references
Město Třeboň
0 references
37901
0 references
Obsahem projektu je výstavba ČOV a splaškové kanalizace (s jednou čerpací stanicí) ve Staré Hlíně - místní části města Třeboně. Na novou kanalizaci bude napojeno 243 trvale žijících obyvatel. ČOV je navržena o kapacitě 304 EO. (Czech)
0 references
The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.30/0.0/0.0/15_021/0001266
0 references