HEDGE OF UNSTABLE ROCK WALL IN A LARGE TURN SITE — JUNCTION TO SWIMMING SPOT IN MOCRÉ-HORÁKOVION (Q59160): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project addresses the unstable rock wall at the MoH site — the junction to bathing sites in the cadastral district of the cadastral district. Morec-Horakov, p.p. 681/1,682,683/1,683/2,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1,784/2,784/6,788/8,788/26,786/19,@@ Horákov, No. 295/8,295/16. The main objective of the project is to prevent and, as the case may be, capture of rock blocks and rocks and consequent danger to traffi...)
(‎Created claim: summary (P836): The project solves securing an unstable rock wall in the location of the Great Turn – the intersection to the swimming pool, on the grounds in k.ú. Wet-Horákov, p. no. 681/1,682,683/1.683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1/1,784,1/784,784,2/784,2/st. Horákov p. no. 295/8,295/16. The main objective of the project is to prevent or capture falls of rock blocks and pieces of rocks and subsequent threats to traffic espe...)
Property / summary
 
The project solves securing an unstable rock wall in the location of the Great Turn – the intersection to the swimming pool, on the grounds in k.ú. Wet-Horákov, p. no. 681/1,682,683/1.683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1/1,784,1/784,784,2/784,2/st. Horákov p. no. 295/8,295/16. The main objective of the project is to prevent or capture falls of rock blocks and pieces of rocks and subsequent threats to traffic especially on communication. The goal is to protect the property and the health of people. (English)
Property / summary: The project solves securing an unstable rock wall in the location of the Great Turn – the intersection to the swimming pool, on the grounds in k.ú. Wet-Horákov, p. no. 681/1,682,683/1.683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1/1,784,1/784,784,2/784,2/st. Horákov p. no. 295/8,295/16. The main objective of the project is to prevent or capture falls of rock blocks and pieces of rocks and subsequent threats to traffic especially on communication. The goal is to protect the property and the health of people. (English) / rank
 
Normal rank
Property / summary: The project solves securing an unstable rock wall in the location of the Great Turn – the intersection to the swimming pool, on the grounds in k.ú. Wet-Horákov, p. no. 681/1,682,683/1.683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1/1,784,1/784,784,2/784,2/st. Horákov p. no. 295/8,295/16. The main objective of the project is to prevent or capture falls of rock blocks and pieces of rocks and subsequent threats to traffic especially on communication. The goal is to protect the property and the health of people. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:17, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
HEDGE OF UNSTABLE ROCK WALL IN A LARGE TURN SITE — JUNCTION TO SWIMMING SPOT IN MOCRÉ-HORÁKOVION
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,621,234.8 Czech koruna
    0 references
    184,849.39 Euro
    10 January 2020
    0 references
    5,436,746.83 Czech koruna
    0 references
    217,469.87 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    30 September 2020
    0 references
    Obec Mokrá - Horákov
    0 references
    0 references
    0 references

    49°13'33.78"N, 16°45'13.00"E
    0 references
    66404
    0 references
    Projekt řeší zajištění nestabilní skalní stěny v lokalitě Velké zatáčky - křižovatka ke koupališti, a to na pozemcích v k.ú. Mokrá-Horákov, p.č. 681/1,682,683/1,683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1,784/2,784/6,788/8,788/26,786/19, a na pozemcích v k.ú. Horákov p.č. 295/8,295/16. Hlavním cílem projektu je zabránění, případně zachycení opadů skalních bloků a kusů hornin a následného ohrožení provozu zejména na komunikaci. Cílem je ochrana majetku a zdraví lidí. (Czech)
    0 references
    The project solves securing an unstable rock wall in the location of the Great Turn – the intersection to the swimming pool, on the grounds in k.ú. Wet-Horákov, p. no. 681/1,682,683/1.683/2,684,685/3,685/2,686/1,686/2,687/1,687/2,688/1,688/2,689/1,784/1/1,784,1/784,784,2/784,2/st. Horákov p. no. 295/8,295/16. The main objective of the project is to prevent or capture falls of rock blocks and pieces of rocks and subsequent threats to traffic especially on communication. The goal is to protect the property and the health of people. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/17_074/0007005
    0 references