(Removed claim: summary (P836): The purpose of the project is the construction of road transport I/15 of the main route 2.715 km in category S 9,5/70, which is treated as the south-east bypass of the municipality of Kravara. Implementation of the project will lead to the payment of transit traffic away from the built-up area of the municipality in order to reduce the burden of the population by noise and exile. There will also be an increase in traffic flows on the I/15 road...) |
(Created claim: summary (P836): The object of the project is the construction of the relocation of road I/15 in the total length of the main route 2.715 km in category S 9,5/70, which is designed as the southeast bypass of Kravaře. The implementation of the project will lead to the transfer of transit transport outside the municipality and thus reduce the burden of the population by noise and exhalations. There will also be an increase in traffic flow on the I/15 road, shorten...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of the relocation of road I/15 in the total length of the main route 2.715 km in category S 9,5/70, which is designed as the southeast bypass of Kravaře. The implementation of the project will lead to the transfer of transit transport outside the municipality and thus reduce the burden of the population by noise and exhalations. There will also be an increase in traffic flow on the I/15 road, shortened driving time and increased road safety in Kravaře, including pedestrian safety. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of the relocation of road I/15 in the total length of the main route 2.715 km in category S 9,5/70, which is designed as the southeast bypass of Kravaře. The implementation of the project will lead to the transfer of transit transport outside the municipality and thus reduce the burden of the population by noise and exhalations. There will also be an increase in traffic flow on the I/15 road, shortened driving time and increased road safety in Kravaře, including pedestrian safety. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of the relocation of road I/15 in the total length of the main route 2.715 km in category S 9,5/70, which is designed as the southeast bypass of Kravaře. The implementation of the project will lead to the transfer of transit transport outside the municipality and thus reduce the burden of the population by noise and exhalations. There will also be an increase in traffic flow on the I/15 road, shortened driving time and increased road safety in Kravaře, including pedestrian safety. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:40, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | I/15 Kravaara, bypass |
Project in Czech Republic financed by DG Regio |
Statements
201,390,918.2 Czech koruna
0 references
236,930,492.0 Czech koruna
0 references
85 percent
0 references
16 October 2017
0 references
30 April 2020
0 references
Ředitelství silnic a dálnic ČR
0 references
14000
0 references
Předmětem projektu je výstavba přeložky silnice I/15 v celkové délce hlavní trasy 2,715 km v kategorii S 9,5/70, která je řešena jako jihovýchodní obchvat obce Kravaře. Realizací projektu dojde k odvedení tranzitní dopravy mimo zástavbu obce a sníží se tak zátěž obyvatelstva hlukem a exhalacemi. Dojde rovněž ke zvýšení plynulosti dopravy na silnici I/15, zkrácení jízdní doby a zvýšení bezpečnosti silničního provozu v obci Kravaře včetně bezpečnosti chodců. (Czech)
0 references
The object of the project is the construction of the relocation of road I/15 in the total length of the main route 2.715 km in category S 9,5/70, which is designed as the southeast bypass of Kravaře. The implementation of the project will lead to the transfer of transit transport outside the municipality and thus reduce the burden of the population by noise and exhalations. There will also be an increase in traffic flow on the I/15 road, shortened driving time and increased road safety in Kravaře, including pedestrian safety. (English)
23 October 2020
0 references
Identifiers
CZ.04.3.42/0.0/0.0/15_004/0000152
0 references