Hot water connection CZT objects Apex, Harantova and N. 2595 Sand (Q19058): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a., translated_summary) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Czech Republic | Project Q19058 in Czech Republic | ||
description / cs | description / cs | ||
Projekt v | Projekt Q19058 v Czechia |
Revision as of 19:17, 28 October 2020
Project Q19058 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Hot water connection CZT objects Apex, Harantova and N. 2595 Sand |
Project Q19058 in Czech Republic |
Statements
1,044,491.25 Czech koruna
0 references
2,611,228.0 Czech koruna
0 references
40 percent
0 references
29 March 2018
0 references
31 October 2018
0 references
30 November 2018
0 references
Teplárna Písek, a.s.
0 references
39701
0 references
V rámci plánovaného přechodu z páry na horkou vodu v oblasti Horkovodu Východ a technického stavu původního parního a kondenzátního rozvodu k odběratelům čp. 2595, VS Ha-rantova a Apex je plánováno nahradit stávající parovody horkovodními rozvody z předizolovaného potrubí. Rekonstruováno bude 242 m původní trasy. a. (Czech)
0 references
Within the planned transition from steam to hot water in the area of the East hot water and the technical condition of the original steam and condensate distribution to customers np. 2595, VS Harantova and Apex are planned to replace existing steam pipelines with hot water distributions from pre-insulated pipelines. 242 m of the original route will be reconstructed. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.15/0.0/0.0/16_064/0011889
0 references