Modernisation of Szt Karviná and Havířov (Q19004): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of management systems and other heat supply technologies in Karviná and Havířov. The aim of the project is to increase the reliability of the operation, by implementing the proposed measures on the SZT networks. The risks. a., remove_old_english_translation) |
(Created claim: summary (P836): Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of control systems and other technologies for heat supply to the cities of Karviná and Havířov. The aim of the project is to increase the reliability of operation through the implementation of the proposed measures on networks. There are no risks. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of control systems and other technologies for heat supply to the cities of Karviná and Havířov. The aim of the project is to increase the reliability of operation through the implementation of the proposed measures on networks. There are no risks. a. (English) | |||||||||||||||
Property / summary: Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of control systems and other technologies for heat supply to the cities of Karviná and Havířov. The aim of the project is to increase the reliability of operation through the implementation of the proposed measures on networks. There are no risks. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of control systems and other technologies for heat supply to the cities of Karviná and Havířov. The aim of the project is to increase the reliability of operation through the implementation of the proposed measures on networks. There are no risks. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 17:10, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of Szt Karviná and Havířov |
Project in Czech Republic financed by DG Regio |
Statements
32,966,846.4 Czech koruna
0 references
109,889,488.0 Czech koruna
0 references
30 percent
0 references
26 January 2017
0 references
27 September 2018
0 references
25 January 2019
0 references
Veolia Energie ČR, a.s.
0 references
70200
0 references
Rekonstrukce a modernizace zejména primárních a sekundárních sítí, výměníkových stanic, výměna řídících systémů a ostatních technologií pro dodávky tepla do měst Karviná a Havířov. Cílem projektu je zvýšení spolehlivosti provozu, prostřednictvím realizace navržených opatření na sítích SZT. Rizika nejsou. a. (Czech)
0 references
Reconstruction and modernisation of mainly primary and secondary networks, exchange stations, exchange of control systems and other technologies for heat supply to the cities of Karviná and Havířov. The aim of the project is to increase the reliability of operation through the implementation of the proposed measures on networks. There are no risks. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.15/0.0/0.0/15_025/0006986
0 references