CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN (Q16627): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a., translated_summary)
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
description / endescription / en
Project in Czech Republic financed by DG Regio
Project Q16627 in Czech Republic
description / csdescription / cs
Projekt v České republice financovaný DG Regio
Projekt Q16627 v Czechia

Revision as of 17:07, 28 October 2020

Project Q16627 in Czech Republic
Language Label Description Also known as
English
CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN
Project Q16627 in Czech Republic

    Statements

    0 references
    713,294.82 Czech koruna
    0 references
    28,531.79 Euro
    10 January 2020
    0 references
    1,018,992.6 Czech koruna
    0 references
    40,759.70 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    31 December 2019
    0 references
    LACHMAN INTERIER DESIGN, s.r.o.
    0 references
    0 references

    49°28'13.51"N, 17°6'36.79"E
    0 references
    79601
    0 references
    Realizace předkládaného projektu spočívá v instalaci FVE o instalovaném výkonu 41,18kWp, umístěné na střeše řešeného objektu. a. (Czech)
    0 references
    Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011606
    0 references