(‎Removed claim: summary (P836): Company Project Petr ŠEDINA focuses on the implementation of selected measures, resulting in a reduction of the energy performance of the property itself. The project will be carried out: — insulation of the building structure, — insulation of the roof of the building — replacement of the replacement of the building, — installation of a heat pump — installation of LED lights, secondarily to the ventilation of the building, in view of its purpo...)
(‎Created claim: summary (P836): Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be th...)
Property / summary
 
Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be the ventilation of the building due to its purpose, mechanically with recuperation. a. (English)
Property / summary: Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be the ventilation of the building due to its purpose, mechanically with recuperation. a. (English) / rank
 
Normal rank
Property / summary: Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be the ventilation of the building due to its purpose, mechanically with recuperation. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:39, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction modifications for production st. 134/1, Veletov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,718,762.0 Czech koruna
    0 references
    108,750.48 Euro
    10 January 2020
    0 references
    5,437,524.0 Czech koruna
    0 references
    217,500.96 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    31 December 2019
    0 references
    Mgr. Petr Šedina
    0 references
    0 references

    50°1'58.19"N, 15°11'23.86"E
    0 references
    28002
    0 references
    Projekt společnosti Mgr. Petr Šedina je zaměřen na realizaci vybraných opatření, jejichž výstupem bude snížení energetické náročnosti vlastní nemovitosti. V rámci projektu bude provedeno:- zateplení obvodových konstrukcí budovy,- zateplení střechy objektu, - výměna otvorových výplní budovy, - instalace tepelného čerpadla, - montáž LED svítidel,- sekundárně bude řešeno větrání budovy vzhledem k jejímu účelu, a to mechanicky s rekuperací. a. (Czech)
    0 references
    Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be the ventilation of the building due to its purpose, mechanically with recuperation. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0012619
    0 references