(‎Removed claim: summary (P836): The project will make investments in energy-saving measures in the chocolate plant in Holešove. On the basis of the technical and economic analyses carried out and the recommendation of the energy audit, the renovation of the administrative building and the social building with the canteen and the exchange of the cooling compressor will be carried out, including the optimisation of the cooling system for cooling in order to reduce the energy i...)
(‎Created claim: summary (P836): As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operatio...)
Property / summary
 
As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operation will be carried out. (English)
Property / summary: As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operation will be carried out. (English) / rank
 
Normal rank
Property / summary: As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operation will be carried out. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:36, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings in Nestlé – establishment Holešov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    3,167,427.6 Czech koruna
    0 references
    126,697.10 Euro
    10 January 2020
    0 references
    10,558,092.0 Czech koruna
    0 references
    422,323.68 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    5 June 2016
    0 references
    1 December 2016
    0 references
    31 January 2017
    0 references
    Nestlé Česko s.r.o.
    0 references

    49°59'56.22"N, 14°25'3.50"E
    0 references
    14300
    0 references
    V rámci projektu budou realizovány investice do energeticky úsporných opatření v závodě čokoládoven v Holešově. Na základě zpracovaných technicko-ekonomických rozborů a doporučení energetického auditu bude realizována rekonstrukce administrativní budovy a sociální budovy s jídelnou a výměna kompresoru chlazení včetně optimalizace systému řízení kondenzátorů chlazení za účelem snížení energetické náročnosti provozu. a. (Czech)
    0 references
    As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operation will be carried out. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0000029