Reconstruction of the production building REPON spol. s.r.o. (Q16022): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of this project is a set of energy adjustments that will significantly improve the thermal parameters of the object of the production hall of REPON. This is a free-standing production house in the New City nad Metering industrial zone. The insulation of the peripheral walls and the roof of the building, the replacement of some of the selector fillings, the reconstruction of the lighting of the areas of the galvanisation and the ins...)
(‎Created claim: summary (P836): The object of this project is a set of energy treatments that will significantly improve the thermal parameters of the REPON production hall building. It is a separate production building in the industrial zone in Nové Město nad Metují. The perimeter walls and roof of the building will be insulated, some opening fillings are replaced, illumination of the galvanisation room and the installation of an air-conditioning unit with recuperation. a., t...)
Property / summary
 
The object of this project is a set of energy treatments that will significantly improve the thermal parameters of the REPON production hall building. It is a separate production building in the industrial zone in Nové Město nad Metují. The perimeter walls and roof of the building will be insulated, some opening fillings are replaced, illumination of the galvanisation room and the installation of an air-conditioning unit with recuperation. a. (English)
Property / summary: The object of this project is a set of energy treatments that will significantly improve the thermal parameters of the REPON production hall building. It is a separate production building in the industrial zone in Nové Město nad Metují. The perimeter walls and roof of the building will be insulated, some opening fillings are replaced, illumination of the galvanisation room and the installation of an air-conditioning unit with recuperation. a. (English) / rank
 
Normal rank
Property / summary: The object of this project is a set of energy treatments that will significantly improve the thermal parameters of the REPON production hall building. It is a separate production building in the industrial zone in Nové Město nad Metují. The perimeter walls and roof of the building will be insulated, some opening fillings are replaced, illumination of the galvanisation room and the installation of an air-conditioning unit with recuperation. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:20, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the production building REPON spol. s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    4,328,176.74 Czech koruna
    0 references
    173,127.07 Euro
    10 January 2020
    0 references
    10,820,441.85 Czech koruna
    0 references
    432,817.67 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    20 April 2018
    0 references
    12 November 2018
    0 references
    30 November 2018
    0 references
    R E P O N spol. s r.o.
    0 references
    0 references

    49°59'0.49"N, 14°30'9.11"E
    0 references
    25250
    0 references
    Předmětem tohoto projektu je soubor energetických úprav, které významně zlepší tepelné parametry objektu výrobní haly společnosti REPON. Jedná se o samostatně stojící výrobní budovu v průmyslové zóně v Novém Městě nad Metují. Dojde k zateplení obvodových stěn a střechy objektu, výměně některých otvorových výplní, rekonstrukci osvětlení prostor galvanizovny a instalaci přívodní vzduchotechnické jednotky s rekuperací. a. (Czech)
    0 references
    The object of this project is a set of energy treatments that will significantly improve the thermal parameters of the REPON production hall building. It is a separate production building in the industrial zone in Nové Město nad Metují. The perimeter walls and roof of the building will be insulated, some opening fillings are replaced, illumination of the galvanisation room and the installation of an air-conditioning unit with recuperation. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011877
    0 references