(Removed claim: summary (P836): The energy saving project will be carried out at a site that is technically and energy obsolete. The project will be implemented by: — insulation of circuit walls and roof structures in external wipers for replacement of non-conforming windows and doors — Exchange of existing lights in the gut — Exchange and modernisation of a heat source for heating and modification of a heating system — Removal of central warm air heating and substitution of...) |
(Created claim: summary (P836): The energy saving project will be implemented on the premises, which is technically and energetically outdated. Within the project will be done:- Insulated perimeter walls and roof construction with replacement of unsuitable windows and doors in the outer wall- Exchange of existing skylights in the roof- Exchange and modernisation of heat source for heating and modification of heating system- Cancellation of central hot air heating and replaceme...) |
||||||||||||||
Property / summary | |||||||||||||||
The energy saving project will be implemented on the premises, which is technically and energetically outdated. Within the project will be done:- Insulated perimeter walls and roof construction with replacement of unsuitable windows and doors in the outer wall- Exchange of existing skylights in the roof- Exchange and modernisation of heat source for heating and modification of heating system- Cancellation of central hot air heating and replacement by local condensation gas- Exchange of lighting with LED lighting including wiring and. (English) | |||||||||||||||
Property / summary: The energy saving project will be implemented on the premises, which is technically and energetically outdated. Within the project will be done:- Insulated perimeter walls and roof construction with replacement of unsuitable windows and doors in the outer wall- Exchange of existing skylights in the roof- Exchange and modernisation of heat source for heating and modification of heating system- Cancellation of central hot air heating and replacement by local condensation gas- Exchange of lighting with LED lighting including wiring and. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The energy saving project will be implemented on the premises, which is technically and energetically outdated. Within the project will be done:- Insulated perimeter walls and roof construction with replacement of unsuitable windows and doors in the outer wall- Exchange of existing skylights in the roof- Exchange and modernisation of heat source for heating and modification of heating system- Cancellation of central hot air heating and replacement by local condensation gas- Exchange of lighting with LED lighting including wiring and. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:15, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings in the company Bítešské dopravní společnost spol. s r.o. |
Project in Czech Republic financed by DG Regio |
Statements
2,926,000.0 Czech koruna
0 references
7,315,000.0 Czech koruna
0 references
40 percent
0 references
1 April 2017
0 references
12 October 2018
0 references
31 October 2018
0 references
BÍTEŠSKÁ DOPRAVNÍ SPOLEČNOST, spol. s r.o.
0 references
59501
0 references
Projekt úspory energií bude realizován v areálu, který je technicky a energeticky zastaralý. V rámci projektu bude provedeno:- Zateplení obvodových stěn a střešní konstrukce s výměnou nevyhovujících oken a dveří ve vnější stěně- Výměna stávajících světlíků ve střeše- Výměna a modernizace zdroje tepla pro vytápění a úprava topného systému- Zrušení centrálního teplovzdušného vytápění a nahrazení lokálním kondenzačním plynovým- Výměna osvětlení za LED osvětlení včetně elektroinstalace a. (Czech)
0 references
The energy saving project will be implemented on the premises, which is technically and energetically outdated. Within the project will be done:- Insulated perimeter walls and roof construction with replacement of unsuitable windows and doors in the outer wall- Exchange of existing skylights in the roof- Exchange and modernisation of heat source for heating and modification of heating system- Cancellation of central hot air heating and replacement by local condensation gas- Exchange of lighting with LED lighting including wiring and. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0002168