Production preparation workshop (Q12907): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the retrofitting of a preparation workshop, which has not yet been used (in our company), a mechanical installation, a drilling pad, a milling machine, a paired sawing machine for metal and a screwdriver compressor. With the new plant, there will be preparations in our society, which will make the next production more efficient, more flexible and faster. a., remove_old_english_translation)
(‎Created claim: summary (P836): The subject of the project is the retrofitting of the workshop with new, previously unused (in our company) machinery? a column drill, a cutter drill, a metal band saw and a screw compressor. With the new equipment, our company will create a preparation workshop that will make the following production more efficient, flexible and faster. a., translated_summary)
Property / summary
 
The subject of the project is the retrofitting of the workshop with new, previously unused (in our company) machinery? a column drill, a cutter drill, a metal band saw and a screw compressor. With the new equipment, our company will create a preparation workshop that will make the following production more efficient, flexible and faster. a. (English)
Property / summary: The subject of the project is the retrofitting of the workshop with new, previously unused (in our company) machinery? a column drill, a cutter drill, a metal band saw and a screw compressor. With the new equipment, our company will create a preparation workshop that will make the following production more efficient, flexible and faster. a. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the retrofitting of the workshop with new, previously unused (in our company) machinery? a column drill, a cutter drill, a metal band saw and a screw compressor. With the new equipment, our company will create a preparation workshop that will make the following production more efficient, flexible and faster. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:07, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Production preparation workshop
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    224,705.25 Czech koruna
    0 references
    8,988.21 Euro
    10 January 2020
    0 references
    499,345.0 Czech koruna
    0 references
    19,973.8 Euro
    10 January 2020
    0 references
    45 percent
    0 references
    1 October 2015
    0 references
    23 May 2016
    0 references
    31 May 2016
    0 references
    CADYVA tools & fixtures s.r.o.
    0 references
    0 references

    49°54'54.76"N, 17°58'11.10"E
    0 references
    74770
    0 references
    Předmětem projektu je dovybavení dílny přípravy novým, dosud nevyužívaným (v naší společnosti) strojním zařízením ? sloupovou vrtačkou, vrtačko frézou, pásovou pilou na kov a šroubovým kompresorem. S novým zařízením vznikne v naší společnosti dílna přípravy, která bude následující výrobu činit efektivnější, pružnější a rychlejší. a. (Czech)
    0 references
    The subject of the project is the retrofitting of the workshop with new, previously unused (in our company) machinery? a column drill, a cutter drill, a metal band saw and a screw compressor. With the new equipment, our company will create a preparation workshop that will make the following production more efficient, flexible and faster. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.2.06/0.0/0.0/15_001/0004344
    0 references