Reduction of energy intensity of drying by using waste heat – Borovany (Q15512): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at reducing the energy performance of ceramic tiles and tiles. The measures proposed in the processed EA will be implemented. The existing combustion system for drying grains to produce chips will be used to make it possible to use the oven heat energy to replace part of the drying air. The installation of the fluorine filter shall also be installed at the end of the flue gas purge. a., remove_old_english_translation)
(‎Created claim: summary (P836): The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean th...)
Property / summary
 
The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean the flue gas furnaces. a. (English)
Property / summary: The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean the flue gas furnaces. a. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean the flue gas furnaces. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:02, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy intensity of drying by using waste heat – Borovany
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    5,607,900.0 Czech koruna
    0 references
    224,316.0 Euro
    10 January 2020
    0 references
    18,693,000.0 Czech koruna
    0 references
    747,720.0 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    31 March 2017
    0 references
    2 May 2018
    0 references
    29 June 2018
    0 references
    LASSELSBERGER, s.r.o.
    0 references
    0 references

    49°43'47.24"N, 13°22'10.49"E
    0 references
    30100
    0 references
    Cílem projektu je snížení energetické náročnosti výroby keramických obkladaček a dlaždic. Bude realizováno opatření navržené ve zpracovávaném EA. Bude proveden upgrade stávajícího spalovacího systému rozprachové sušárny na výrobu granulátu , který umožní využít tepelnou energii spalin pecí jako náhradu části sušícího vzduchu. Zároveň proběhne instalace fluor filtru na vyčištění spalin pecí. a. (Czech)
    0 references
    The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean the flue gas furnaces. a. (English)
    22 October 2020
    0 references