Energy savings OPATISK (Q15428): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the energy saving of the house of OPATISK s.r.o. The purpose of the initial study is the option of installing a new energy storage device with recuperative waste heat. This will reduce the consumption of energy and the efficient use of waste heat for further processing. There is currently no use of waste heat produced by machinery. Owing to the ventilation of the windows, air tunnels are produced which have a nega...)
(‎Created claim: summary (P836): The object of the project is energy saving in the production hall of OPATISK s.r.o. According to the introductory study, the best version of the installation of new air conditioning with waste heat recovery is published. This will reduce energy consumption and efficient use of waste heat for further processing purposes. There is currently no recovery of waste heat produced by machines. Due to window ventilation, air tunnels are created which hav...)
Property / summary
 
The object of the project is energy saving in the production hall of OPATISK s.r.o. According to the introductory study, the best version of the installation of new air conditioning with waste heat recovery is published. This will reduce energy consumption and efficient use of waste heat for further processing purposes. There is currently no recovery of waste heat produced by machines. Due to window ventilation, air tunnels are created which have negative impacts on the quality of the working environment, or the whole production. (English)
Property / summary: The object of the project is energy saving in the production hall of OPATISK s.r.o. According to the introductory study, the best version of the installation of new air conditioning with waste heat recovery is published. This will reduce energy consumption and efficient use of waste heat for further processing purposes. There is currently no recovery of waste heat produced by machines. Due to window ventilation, air tunnels are created which have negative impacts on the quality of the working environment, or the whole production. (English) / rank
 
Normal rank
Property / summary: The object of the project is energy saving in the production hall of OPATISK s.r.o. According to the introductory study, the best version of the installation of new air conditioning with waste heat recovery is published. This will reduce energy consumption and efficient use of waste heat for further processing purposes. There is currently no recovery of waste heat produced by machines. Due to window ventilation, air tunnels are created which have negative impacts on the quality of the working environment, or the whole production. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:01, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings OPATISK
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,550,000.0 Czech koruna
    0 references
    142,000.0 Euro
    10 January 2020
    0 references
    7,100,000.0 Czech koruna
    0 references
    284,000.0 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    1 July 2015
    0 references
    8 November 2016
    0 references
    31 December 2016
    0 references
    OPATISK s.r.o.
    0 references
    0 references

    49°54'31.28"N, 17°55'45.55"E
    0 references
    74706
    0 references
    Předmětem projektu je úspora energií ve výr. hale společnosti OPATISK s.r.o. Dle úvodní studie vychází nejlépe varianta instalace nové vzduchotechniky s rekuperací odpadního tepla. Dojde tak k snižování spotř. energie a efektivního využití odpadního tepla pro další účely zpracování. V současné době nedochází k žádnému využití odpadního tepla, jež produkují stroje. Z důvodu větrání okny se vytváří vzduchové tunely, které mají negativní dopady na kvalitu pracovního prostředí, potažmo celé výroby. a. (Czech)
    0 references
    The object of the project is energy saving in the production hall of OPATISK s.r.o. According to the introductory study, the best version of the installation of new air conditioning with waste heat recovery is published. This will reduce energy consumption and efficient use of waste heat for further processing purposes. There is currently no recovery of waste heat produced by machines. Due to window ventilation, air tunnels are created which have negative impacts on the quality of the working environment, or the whole production. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0000777
    0 references