Innovative solution of the technological process of final operations of production of ferrite cores (Q9983): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project is aimed at optimising the final processes of production, reducing costs and material. production demands and redesign technologyologist. procedure for new EP of ferrite core (so-called EP5i) in order to better address customer needs and increase the competitiveness of the applicant.The aim is also to completely eliminate the risks of mechanical damage to kernels during handling; introduction of 100 % visual inspection using a camera...) |
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
||
description / en | description / en | ||
Project in Czech Republic | Project Q9983 in Czech Republic | ||
description / cs | description / cs | ||
Projekt v | Projekt Q9983 v Czechia |
Revision as of 15:24, 28 October 2020
Project Q9983 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Innovative solution of the technological process of final operations of production of ferrite cores |
Project Q9983 in Czech Republic |
Statements
4,081,250.0 Czech koruna
0 references
16,325,000.0 Czech koruna
0 references
25 percent
0 references
12 January 2016
0 references
16 November 2018
0 references
25 November 2018
0 references
TDK Electronics s.r.o.
0 references
78701
0 references
Projekt je zaměřen na celk. optimalizaci finálních procesů výroby, snížení nákladů a materiál. náročnosti výroby a redesign technolog. postupu pro novou variantu EP feritového jádra (tzv. EP5i) za účelem lepšího adresování potřeb zákazníka a zvýšení konkurenceschopnosti žadatele.Cílem je rovněž zcela eliminovat rizika mechanického poškození jader při manipulaci; zavedení 100% vzhledové kontroly pomocí kamery a zavedení finálního balení, které umožní zákazníkovi zpracování na automatické lince. a. (Czech)
0 references
The project is aimed at optimising the final processes of production, reducing costs and material. production demands and redesign technologyologist. procedure for new EP of ferrite core (so-called EP5i) in order to better address customer needs and increase the competitiveness of the applicant.The aim is also to completely eliminate the risks of mechanical damage to kernels during handling; introduction of 100 % visual inspection using a camera and the introduction of the final packaging to enable the customer to be processed on an automatic line. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.1.02/0.0/0.0/15_014/0005827
0 references