Modernisation of Szt Karviná and Havířov – II. part (Q19051): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Modernisation of Szt Karviná and Havířov – II. part |
Revision as of 09:21, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of Szt Karviná and Havířov – II. part |
Project in Czech Republic financed by DG Regio |
Statements
22,350,634.4 Czech koruna
0 references
55,876,586.0 Czech koruna
0 references
40 percent
0 references
15 February 2018
0 references
25 October 2020
0 references
Veolia Energie ČR, a.s.
0 references
70200
0 references
Rekonstrukce potrubního rozvodu a modernizace elektro a strojní části předávacích stanic. Cílem projektu je snížení tepelných ztrát a vlastní spotřeby elektřiny a zvýšení spolehlivosti provozu, prostřednictvím realizace navržených opatření na sítích SZT. a. (Czech)
0 references
The reconstruction of the pipelines and the modernisation of the electrical and machinery parts of the transmission stations. The aim of the project is to reduce heat loss and self-consumption and to increase the reliability of the operation, by implementing the proposed measures on the SZT networks. (English)
0 references
Identifiers
CZ.01.3.15/0.0/0.0/16_064/0011868
0 references