(Removed claim: summary (P836): The aim of the project is the construction of a photovoltaic power plant on the roofs of a production site in Hoříž, including the installation of an energy storage system and charging points for electric charging., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The aim of the project is the construction of a photovoltaic power plant on the roofs of a production site in Hoříž, including the installation of an energy storage system and charging points for electric charging. (English) / rank | |||
Revision as of 17:06, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Generation of electricity from FVE including its accumulation |
Project in Czech Republic financed by DG Regio |
Statements
6,916,052.0 Czech koruna
0 references
8,645,065.0 Czech koruna
0 references
80 percent
0 references
31 August 2019
0 references
LUNA PLAST,a.s.
0 references
27601
0 references
Předmětem projektu je výstavba fotovoltaické elektrárny na střechách výrobního areálu v Hoříně včetně instalace bateriového systému pro akumulaci energie a dobíjecí stanice pro dobíjení elektromobilů. a. (Czech)
0 references
Identifiers
CZ.01.3.14/0.0/0.0/16_132/0010873