Rampa-kultura — creating multifunctional space in the city centre of Goleniów and giving it new socio-cultural functions by revitalising degraded railway infrastructure (Q139069): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to revive the social economy. M. Goleniów and osat. at risk of exclusion, by the revitalisation of the degraded Rampe building and the surrounding environment (24 m. parking), in the area of regeneration (LPR, project run) and the new functions being made available to him. The project will address the problems identified. Neglected facilities, lack of use, lack of space for social housing, including revitalisation of...)
(‎Created claim: summary (P836): The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of resi...)
Property / summary
 
The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of residents of the revitalisation area. It is not adapted to the needs of people with disabilities and older people. The investment will eliminate this problem (entry, toilets, 2 m.parking) and will introduce new services. Revitalisation will create a cultural object dedicated to theatre, cafe, meetings of organisations. groups, will enable the organisation of cultural events. Modernised rooms will improve accessibility and increase the security. Pr. will have a beneficial impact on the environment-connection to the city’s central heating and water-channel network, energy-saving lighting, thermal insulation, acoustic insulation, p-humid, land management, small archit. Investment for rewital. object-survey. 1014,16 m², including the creation in a two-part building: spectacle and training room for performances, locker room, office space, guest house and techn.; cafes, magazines. Works-masonry, renovation and insulating work, replacement of carpentry, modernisation of roof and installation (sanitary, heat, electrical), delivery and adaptation of wagons. The project does not provide for the use of the area for the activities of gospods. Stages of the project: lawsuit for construction, documentation (realised), tender procedure, construction and delivery procedure, wagon adaptation, promotion, supervision inspector (to be carried out). It’s okay. 500os/m-c will take part in events organised in the Ramp, wed.3 events/m-c, 1 area will be revitalised and adapted to the needs of the disabled. Target – residents of the city, including revitalisation area, tourists. Implementation period 30.12.18-31.12.19. The project will be implemented by Gm. Goleniów. (English)
Property / summary: The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of residents of the revitalisation area. It is not adapted to the needs of people with disabilities and older people. The investment will eliminate this problem (entry, toilets, 2 m.parking) and will introduce new services. Revitalisation will create a cultural object dedicated to theatre, cafe, meetings of organisations. groups, will enable the organisation of cultural events. Modernised rooms will improve accessibility and increase the security. Pr. will have a beneficial impact on the environment-connection to the city’s central heating and water-channel network, energy-saving lighting, thermal insulation, acoustic insulation, p-humid, land management, small archit. Investment for rewital. object-survey. 1014,16 m², including the creation in a two-part building: spectacle and training room for performances, locker room, office space, guest house and techn.; cafes, magazines. Works-masonry, renovation and insulating work, replacement of carpentry, modernisation of roof and installation (sanitary, heat, electrical), delivery and adaptation of wagons. The project does not provide for the use of the area for the activities of gospods. Stages of the project: lawsuit for construction, documentation (realised), tender procedure, construction and delivery procedure, wagon adaptation, promotion, supervision inspector (to be carried out). It’s okay. 500os/m-c will take part in events organised in the Ramp, wed.3 events/m-c, 1 area will be revitalised and adapted to the needs of the disabled. Target – residents of the city, including revitalisation area, tourists. Implementation period 30.12.18-31.12.19. The project will be implemented by Gm. Goleniów. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of residents of the revitalisation area. It is not adapted to the needs of people with disabilities and older people. The investment will eliminate this problem (entry, toilets, 2 m.parking) and will introduce new services. Revitalisation will create a cultural object dedicated to theatre, cafe, meetings of organisations. groups, will enable the organisation of cultural events. Modernised rooms will improve accessibility and increase the security. Pr. will have a beneficial impact on the environment-connection to the city’s central heating and water-channel network, energy-saving lighting, thermal insulation, acoustic insulation, p-humid, land management, small archit. Investment for rewital. object-survey. 1014,16 m², including the creation in a two-part building: spectacle and training room for performances, locker room, office space, guest house and techn.; cafes, magazines. Works-masonry, renovation and insulating work, replacement of carpentry, modernisation of roof and installation (sanitary, heat, electrical), delivery and adaptation of wagons. The project does not provide for the use of the area for the activities of gospods. Stages of the project: lawsuit for construction, documentation (realised), tender procedure, construction and delivery procedure, wagon adaptation, promotion, supervision inspector (to be carried out). It’s okay. 500os/m-c will take part in events organised in the Ramp, wed.3 events/m-c, 1 area will be revitalised and adapted to the needs of the disabled. Target – residents of the city, including revitalisation area, tourists. Implementation period 30.12.18-31.12.19. The project will be implemented by Gm. Goleniów. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:47, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Rampa-kultura — creating multifunctional space in the city centre of Goleniów and giving it new socio-cultural functions by revitalising degraded railway infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    3,273,242.31 zloty
    0 references
    785,578.15 Euro
    13 January 2020
    0 references
    6,411,974.91 zloty
    0 references
    1,538,873.98 Euro
    13 January 2020
    0 references
    51.05 percent
    0 references
    15 May 2019
    0 references
    29 June 2020
    0 references
    GMINA GOLENIÓW
    0 references
    Celem projektu jest ożywienie społ. M. Goleniów i wparcie os. zagrożonych wykluczeniem przez rewitalizację zdegradowanego budynku Rampy i otoczenia (24 m. parking.), na obszarze rewitalizacji (LPR, projekt gł.) i nadanie mu nowych funkcji społ.-kultur. Projekt wpłynie na rozwiązanie zidentyfikowanych problemów. Obiekt zaniedbany, nieużytkowany, brak możliwości wykorzystania na c.społ., w tym aktywizację mieszkańców obsz. rewitalizacji. Nie jest dostosowany do potrzeb os. niepełnosprawnych i starszych . Inwestycja zniweluje ten problem (wejście, toalety, 2 m.parkingowe) i wprowadzi nowe usługi. Rewitalizacja stworzy obiekt kultury przeznaczony na teatr, kawiarnię, spotkania zorganiz. grup, umożliwi organizację wydarzeń kultur., aktywizację mieszkańców. Zmodernizowane pomieszczenia poprawią dostępność i zwiększą bezp. Pr. wpłynie korzystnie na środowisko-podłączenie do miejskiej sieci c.o i wod-kan, oświetlenie energooszcz., izolacja termiczna, akustyczna, p-wilgociowa, zagosp. terenu, mała archit. Inwestycja dot.rewital. obiektu-pow. uż. 1014,16m2, w tym utworzenie w dwuczęściowym budynku: sali widowiskowej i treningowej do przedstawień, zaplecza szatniowo-socjalnego, pomieszczeń biurowych, gospod. i techn.; kawiarni, magazynów. Prace–prace murarskie, renowacyjne i izolacyjne, wymiana stolarki, modernizacja dachu i instalacji (sanitarna, cieplna, elektryczna), dostawa i adapt. wagonów. Projekt nie przewiduje przeznaczenia pow. dla działalności gospod. Etapy projektu: pozw. na bud., dokumentacja (zrealizowane), procedura przetargowa, pr. budowlane i dostawa, adaptacja wagonów, promocja, inspektor nadzoru (do realizacji). Ok. 500os/m-c będzie uczestniczyło w wydarzeniach organizowanych na terenie Rampy, śr.3 wydarzenia/m-c, 1 obszar zostanie objęty rewitalizacją i dostosowany do potrzeb niepełnosprawnych. Gr. docelowa - mieszkańcy miasta, w tym obszaru rewitalizacji, turyści. Okres realizacji 30.12.18-31.12.19. Projekt wdrażany będzie przez Gm. Goleniów. (Polish)
    0 references
    The aim of the project is to revitalise the community. M. Goleniów and support people at risk of exclusion by revitalising the degraded Rampa building and surroundings (24 m. parking.), in the area of revitalisation (LPR, deep project) and giving it new functions of the community-culture. The project will help solve the identified problems. The building is neglected, unused, it is not possible to use on the C.S., including the activation of residents of the revitalisation area. It is not adapted to the needs of people with disabilities and older people. The investment will eliminate this problem (entry, toilets, 2 m.parking) and will introduce new services. Revitalisation will create a cultural object dedicated to theatre, cafe, meetings of organisations. groups, will enable the organisation of cultural events. Modernised rooms will improve accessibility and increase the security. Pr. will have a beneficial impact on the environment-connection to the city’s central heating and water-channel network, energy-saving lighting, thermal insulation, acoustic insulation, p-humid, land management, small archit. Investment for rewital. object-survey. 1014,16 m², including the creation in a two-part building: spectacle and training room for performances, locker room, office space, guest house and techn.; cafes, magazines. Works-masonry, renovation and insulating work, replacement of carpentry, modernisation of roof and installation (sanitary, heat, electrical), delivery and adaptation of wagons. The project does not provide for the use of the area for the activities of gospods. Stages of the project: lawsuit for construction, documentation (realised), tender procedure, construction and delivery procedure, wagon adaptation, promotion, supervision inspector (to be carried out). It’s okay. 500os/m-c will take part in events organised in the Ramp, wed.3 events/m-c, 1 area will be revitalised and adapted to the needs of the disabled. Target – residents of the city, including revitalisation area, tourists. Implementation period 30.12.18-31.12.19. The project will be implemented by Gm. Goleniów. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.09.03.00-32-0040/18
    0 references