City Centre for Social Recreation and Social Integration (Q139059): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project involves the establishment of a Municipal Centre for Social Rehabilitation and Integration. the scope of the project includes: Management of the land adjacent to the lake with the following elements: a beach with a health and welfare state, a bridge with the point of view and the possibility of mooring, the layout of the lake, lighting, outdoor facilities for recreational and sports installations, outdoor sports facilities, sports...) |
(Created claim: summary (P836): The subject of the project is the creation of the Municipal Centre for Recreation and Social Inclusion. The scope of the project includes: Land development adjacent to the lake with the following elements: beach with sanitary and social facilities, a bridge with a lookout point and berth, waterfront management of the lake, lighting, outdoor recreational and sports facilities, outdoor sports facilities, worlds with a resting place, playgrounds (i...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the creation of the Municipal Centre for Recreation and Social Inclusion. The scope of the project includes: Land development adjacent to the lake with the following elements: beach with sanitary and social facilities, a bridge with a lookout point and berth, waterfront management of the lake, lighting, outdoor recreational and sports facilities, outdoor sports facilities, worlds with a resting place, playgrounds (including accessible for disabled and for parents with small children), sports infrastructure, benches, information boards with educational and cultural elements and description of the city’s history and its natural and cultural attractions. The material stages will be 1) design documentation,2) construction works; 3) project management, 4) promotion. The City Centre for Recreation and Social Inclusion will be a public park space. The main part of the park will be located on the section of the geodesic plot no. 243/36 and in the coastal zone on the site of Lake Barlineckiego No. 729/9 rpm It’s 2 Barlinek. The coastal strip covered by the investment is landed and covered by the procedure relating to the separation of the new parcel from parcel No 729/9. The scope of the investment reaching open waters of Lake Barlinecki is connected only with the construction of bridges and local cutting of reeds. The aim of the project is to reduce the risk of social exclusion of the population living in degraded and peripheral areas through the implementation of a project related to the creation of the Municipal Centre for Recreation and Social Inclusion. The project shall comply with the objectives of the ROP set out in priority axis IX. Public infrastructure, action 9.3.Regeneration of the public space, as the project, through the implementation of comprehensive actions, will reduce the risk of social exclusion of the population living in degraded areas and reintegrate them into the (English) | |||||||||||||||
Property / summary: The subject of the project is the creation of the Municipal Centre for Recreation and Social Inclusion. The scope of the project includes: Land development adjacent to the lake with the following elements: beach with sanitary and social facilities, a bridge with a lookout point and berth, waterfront management of the lake, lighting, outdoor recreational and sports facilities, outdoor sports facilities, worlds with a resting place, playgrounds (including accessible for disabled and for parents with small children), sports infrastructure, benches, information boards with educational and cultural elements and description of the city’s history and its natural and cultural attractions. The material stages will be 1) design documentation,2) construction works; 3) project management, 4) promotion. The City Centre for Recreation and Social Inclusion will be a public park space. The main part of the park will be located on the section of the geodesic plot no. 243/36 and in the coastal zone on the site of Lake Barlineckiego No. 729/9 rpm It’s 2 Barlinek. The coastal strip covered by the investment is landed and covered by the procedure relating to the separation of the new parcel from parcel No 729/9. The scope of the investment reaching open waters of Lake Barlinecki is connected only with the construction of bridges and local cutting of reeds. The aim of the project is to reduce the risk of social exclusion of the population living in degraded and peripheral areas through the implementation of a project related to the creation of the Municipal Centre for Recreation and Social Inclusion. The project shall comply with the objectives of the ROP set out in priority axis IX. Public infrastructure, action 9.3.Regeneration of the public space, as the project, through the implementation of comprehensive actions, will reduce the risk of social exclusion of the population living in degraded areas and reintegrate them into the (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the creation of the Municipal Centre for Recreation and Social Inclusion. The scope of the project includes: Land development adjacent to the lake with the following elements: beach with sanitary and social facilities, a bridge with a lookout point and berth, waterfront management of the lake, lighting, outdoor recreational and sports facilities, outdoor sports facilities, worlds with a resting place, playgrounds (including accessible for disabled and for parents with small children), sports infrastructure, benches, information boards with educational and cultural elements and description of the city’s history and its natural and cultural attractions. The material stages will be 1) design documentation,2) construction works; 3) project management, 4) promotion. The City Centre for Recreation and Social Inclusion will be a public park space. The main part of the park will be located on the section of the geodesic plot no. 243/36 and in the coastal zone on the site of Lake Barlineckiego No. 729/9 rpm It’s 2 Barlinek. The coastal strip covered by the investment is landed and covered by the procedure relating to the separation of the new parcel from parcel No 729/9. The scope of the investment reaching open waters of Lake Barlinecki is connected only with the construction of bridges and local cutting of reeds. The aim of the project is to reduce the risk of social exclusion of the population living in degraded and peripheral areas through the implementation of a project related to the creation of the Municipal Centre for Recreation and Social Inclusion. The project shall comply with the objectives of the ROP set out in priority axis IX. Public infrastructure, action 9.3.Regeneration of the public space, as the project, through the implementation of comprehensive actions, will reduce the risk of social exclusion of the population living in degraded areas and reintegrate them into the (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:47, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | City Centre for Social Recreation and Social Integration |
Project in Poland financed by DG Regio |
Statements
890,162.89 zloty
0 references
1,618,478.01 zloty
0 references
55.0 percent
0 references
6 January 2020
0 references
31 December 2020
0 references
GMINA BARLINEK
0 references
Przedmiotem projektu jest stworzenie Miejskiego Centrum Rekreacji i Integracji Społecznej.Zakres projektu obejmuje: Zagospodarowanie terenu przyległego do jeziora z następującymi elementami: plaża z zapleczem sanitarno-socjalnym, pomost z punktem widokowym i możliwością cumowania, zagospodarowanie nabrzeża jeziora, oświetlenie, plenerowe urządzenia rekreacyjno-sportowe, plenerowe obiekty sportowe, wiata z miejscem do odpoczynku, place zabaw (w tym przystosowane dla niepełnosprawnych oraz dla rodziców z małymi dziećmi), infrastruktura sportowa, ławki, tablice informacyjne z elementami edukacyjno-kulturowymi oraz opisem historii miasta i jego atrakcji przyrodniczo-kulturowych, ciąg pieszo-jezdny zapewniający dostęp do centrum i parking z niezbędnym uzbrojeniem. Etapami rzeczowymi będzie 1)dokumentacja projektowa,2) roboty budowlane;3) zarządzenie projektem, 4) promocja. Miejskie Centrum Rekreacji i Integracji Społecznej będzie stanowiło ogólnodostępną przestrzeń parkową . Zasadnicza część parku zostanie zlokalizowana na fragmencie działki geodezyjnej nr ewid. 243/36 oraz w pasie przybrzeżnym na działce jeziora Barlineckiego nr ewid. 729/9 obr. 2 Barlinek. Objęty zainwestowaniem pas przybrzeżny jest zalądowiony i objęty procedurą związaną z wydzieleniem nowej działki z działki nr 729/9. Zakres inwestycji wychodzący na wody otwarte Jeziora Barlineckiego związany jest wyłącznie z budową pomostów i miejscową wycinką trzcin. Celem projektu jest zmniejszenie zagrożenia wykluczeniem społecznym ludności zamieszkującej obszary zdegradowane i peryferyjne poprzez realizację projektu związanego ze stworzeniem Miejskiego Centrum Rekreacji i Integracji Społecznej. Projekt jest zgodny z celami RPO określonymi w osi priorytetowej nr IX. Infrastruktura publiczna , działanie 9.3.Rewitalizacja przestrzeni publicznej,bowiem projekt dzięki wdrożeniu kompleksowych działań zmniejszy zagrożenie wykluczeniem społecznym ludności zamieszkującej obszary zdegradowane oraz na nowo włączy ich do (Polish)
0 references
The subject of the project is the creation of the Municipal Centre for Recreation and Social Inclusion. The scope of the project includes: Land development adjacent to the lake with the following elements: beach with sanitary and social facilities, a bridge with a lookout point and berth, waterfront management of the lake, lighting, outdoor recreational and sports facilities, outdoor sports facilities, worlds with a resting place, playgrounds (including accessible for disabled and for parents with small children), sports infrastructure, benches, information boards with educational and cultural elements and description of the city’s history and its natural and cultural attractions. The material stages will be 1) design documentation,2) construction works; 3) project management, 4) promotion. The City Centre for Recreation and Social Inclusion will be a public park space. The main part of the park will be located on the section of the geodesic plot no. 243/36 and in the coastal zone on the site of Lake Barlineckiego No. 729/9 rpm It’s 2 Barlinek. The coastal strip covered by the investment is landed and covered by the procedure relating to the separation of the new parcel from parcel No 729/9. The scope of the investment reaching open waters of Lake Barlinecki is connected only with the construction of bridges and local cutting of reeds. The aim of the project is to reduce the risk of social exclusion of the population living in degraded and peripheral areas through the implementation of a project related to the creation of the Municipal Centre for Recreation and Social Inclusion. The project shall comply with the objectives of the ROP set out in priority axis IX. Public infrastructure, action 9.3.Regeneration of the public space, as the project, through the implementation of comprehensive actions, will reduce the risk of social exclusion of the population living in degraded areas and reintegrate them into the (English)
21 October 2020
0 references
Identifiers
RPZP.09.03.00-32-0026/18
0 references