Construction of the Botanical Garden in Niehost (Q137954): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The material scope of the project consists of: (a) Construction of facilities: — Economic building, — Main building, -Szklarni, -Building technical, b) Other work: the domestic biological treatment of waste water and the mesh, the departure from the road located on 168, the subway, the legs, the terraces, a space separate for the temporary storage and the separation of solid waste in closed containers (the waste bin) and a small architecture,...)
(‎Created claim: summary (P836): The project’s material scope covers L: construction of facilities: —Economic building, -Main building, -Szklarni, -Technical building, b) Other works: home biological sewage treatment plant and water mesh, exit from the road on Dz. No. 168, driveway, pavements, terraces, separate space for temporary storage and segregation of solid waste in closed containers (dumpster) and small architecture – training throughout the circuit and entirely on the...)
Property / summary
 
The project’s material scope covers L: construction of facilities: —Economic building, -Main building, -Szklarni, -Technical building, b) Other works: home biological sewage treatment plant and water mesh, exit from the road on Dz. No. 168, driveway, pavements, terraces, separate space for temporary storage and segregation of solid waste in closed containers (dumpster) and small architecture – training throughout the circuit and entirely on the premises of plot No. 172, as well as monitors, electrical and sanitary installations, c) External design of furniture and computer equipment. It will be possible. (English)
Property / summary: The project’s material scope covers L: construction of facilities: —Economic building, -Main building, -Szklarni, -Technical building, b) Other works: home biological sewage treatment plant and water mesh, exit from the road on Dz. No. 168, driveway, pavements, terraces, separate space for temporary storage and segregation of solid waste in closed containers (dumpster) and small architecture – training throughout the circuit and entirely on the premises of plot No. 172, as well as monitors, electrical and sanitary installations, c) External design of furniture and computer equipment. It will be possible. (English) / rank
 
Normal rank
Property / summary: The project’s material scope covers L: construction of facilities: —Economic building, -Main building, -Szklarni, -Technical building, b) Other works: home biological sewage treatment plant and water mesh, exit from the road on Dz. No. 168, driveway, pavements, terraces, separate space for temporary storage and segregation of solid waste in closed containers (dumpster) and small architecture – training throughout the circuit and entirely on the premises of plot No. 172, as well as monitors, electrical and sanitary installations, c) External design of furniture and computer equipment. It will be possible. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:41, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Botanical Garden in Niehost
Project in Poland financed by DG Regio

    Statements

    0 references
    2,046,245.97 zloty
    0 references
    491,099.03 Euro
    13 January 2020
    0 references
    2,407,348.26 zloty
    0 references
    577,763.58 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 December 2017
    0 references
    31 October 2018
    0 references
    FUNDACJA REGNUM VEGETABILE
    0 references
    0 references
    Zakres rzeczowy projektu obejmujeL: a) Budowa obiektów : -Budynku gospodarczego, -Głównego budynku, -Szklarni, -Budynku technicznego, b) Inne prace: przydomowa biologiczna oczyszczalnia ścieków i oczko wodne, zjazd z drogi położonej na dz. nr 168 , podjazd, chodniki, tarasy, wydzielone miejsce na czasowe składowanie i segregowanie odpadów stałych w pojemnikach zamkniętych (śmietnik) oraz mała architektura - treliaż po całym obwodzie i w całości na terenie działki nr 172 , a także monitornig, instalacje elektrycznej oraz sanitarne, c) Wyposażenie w meble i zestawy komputerowe z oprogramowaniem (2 szt.) oraz pamięć zewnętrzna, projektor multimedialny, d) Zakup sprzętu mechanicznego do pielęgnacji roślin, e) Działania promocyjne i nadzór. inwestorski f) wykonano dok. techniczną niezbędną do uzyskania pozwolenia na budowę. Możliwe będzie (Polish)
    0 references
    The project’s material scope covers L: construction of facilities: —Economic building, -Main building, -Szklarni, -Technical building, b) Other works: home biological sewage treatment plant and water mesh, exit from the road on Dz. No. 168, driveway, pavements, terraces, separate space for temporary storage and segregation of solid waste in closed containers (dumpster) and small architecture – training throughout the circuit and entirely on the premises of plot No. 172, as well as monitors, electrical and sanitary installations, c) External design of furniture and computer equipment. It will be possible. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.04.03.00-32-0005/17
    0 references