(Removed claim: summary (P836): The object of the project is to carry out maintenance and restoration works, including: • Repair and maintenance of the roof (wing of Pd. and wech.)• maintenance of the main wall of the monastery in Belzovik. Material scope: renovation and revalorisation of the 2 existing wings of the former Cistercian Monastery (wings and pid wings): Reconstruction of the 2 existing peak walls (a high peak on the pd.edge of the wing., a peak wall at the frenc...) |
(Created claim: summary (P836): The subject of the project is to carry out conservation and restoration works including: •Repair and maintenance of the roof (Wing of St. and East) • Maintenance of the peak walls of the post-cistercian monastery in Bierzwnik. Material scope: renovation and revalorisation of 2 existing wings of the former Cistercian monastery (east wings and south wings): — reconstruction of 2 existing peak walls (peak wall on the east wing, a peak wall at the e...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is to carry out conservation and restoration works including: •Repair and maintenance of the roof (Wing of St. and East) • Maintenance of the peak walls of the post-cistercian monastery in Bierzwnik. Material scope: renovation and revalorisation of 2 existing wings of the former Cistercian monastery (east wings and south wings): — reconstruction of 2 existing peak walls (peak wall on the east wing, a peak wall at the edge of the south wing) covering the demolition of existing brick peaks and the construction of new masonry peaks, leaving the masonry walls unchanged; — reinforcement to the necessary extent of the existing, existing roof link in the wooden structure; — replacement of the existing roofing from ceram tiles. carp to new from the ceram tile. tab imitating a monk-mniszka tile. The contractor will be obliged to provide access to the facility from the ground level (adapting to the needs of people with mobility disabilities). (English) | |||||||||||||||
Property / summary: The subject of the project is to carry out conservation and restoration works including: •Repair and maintenance of the roof (Wing of St. and East) • Maintenance of the peak walls of the post-cistercian monastery in Bierzwnik. Material scope: renovation and revalorisation of 2 existing wings of the former Cistercian monastery (east wings and south wings): — reconstruction of 2 existing peak walls (peak wall on the east wing, a peak wall at the edge of the south wing) covering the demolition of existing brick peaks and the construction of new masonry peaks, leaving the masonry walls unchanged; — reinforcement to the necessary extent of the existing, existing roof link in the wooden structure; — replacement of the existing roofing from ceram tiles. carp to new from the ceram tile. tab imitating a monk-mniszka tile. The contractor will be obliged to provide access to the facility from the ground level (adapting to the needs of people with mobility disabilities). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is to carry out conservation and restoration works including: •Repair and maintenance of the roof (Wing of St. and East) • Maintenance of the peak walls of the post-cistercian monastery in Bierzwnik. Material scope: renovation and revalorisation of 2 existing wings of the former Cistercian monastery (east wings and south wings): — reconstruction of 2 existing peak walls (peak wall on the east wing, a peak wall at the edge of the south wing) covering the demolition of existing brick peaks and the construction of new masonry peaks, leaving the masonry walls unchanged; — reinforcement to the necessary extent of the existing, existing roof link in the wooden structure; — replacement of the existing roofing from ceram tiles. carp to new from the ceram tile. tab imitating a monk-mniszka tile. The contractor will be obliged to provide access to the facility from the ground level (adapting to the needs of people with mobility disabilities). (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:41, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Restoring the old heartbeat of the Cistercian monastery in Belrzku |
Project in Poland financed by DG Regio |
Statements
823,396.65 zloty
0 references
968,701.95 zloty
0 references
85.0 percent
0 references
28 February 2018
0 references
26 October 2018
0 references
PARAFIA RZYMSKOKATOLICKA PW. MATKI BOSKIEJ SZKAPLERZNEJ W BIERZWNIKU
0 references
Przedmiotem projektu jest przeprowadzenie prac konserwatorskich i restauratorskich obejmujących: •Naprawę i konserwację dachu (skrzydło pd. i wsch.) •Konserwację ścian szczytowych klasztoru pocysterskiego w Bierzwniku. Zakres rzeczowy: remont i rewaloryzacja 2 istniejących skrzydeł dawnego klasztoru cystersów (skrzydła wsch. i skrzydła pd.): - przebudowa 2 istniejących ścian szczytowych (Ściana szczytowa na pd.skraju skrzydła wsch., ściana szczytowa na zach. skraju skrzydła pd.) obejmująca rozbiórkę istniejących, murowanych szczytów oraz budowę nowych, murowanych szczytów z pozostawieniem bez zmian murowanych ścian przyziemia; - wzmocnienie w niezbędnym zakresie, istniejącej, więźby dachowej w konstrukcji drewnianej; - wymiana istniejącego pokrycia dachowego z dachówki ceram. karpiówki na nowe z dachówki ceram. zakładkowej imitującej dachówkę mnich-mniszka. Wykonawca zobowiązany będzie zapewnić dostęp do obiektu z poziomu gruntu (przystosowanie do potrzeb osób niepełnosprawnych ruchowo). (Polish)
0 references
The subject of the project is to carry out conservation and restoration works including: •Repair and maintenance of the roof (Wing of St. and East) • Maintenance of the peak walls of the post-cistercian monastery in Bierzwnik. Material scope: renovation and revalorisation of 2 existing wings of the former Cistercian monastery (east wings and south wings): — reconstruction of 2 existing peak walls (peak wall on the east wing, a peak wall at the edge of the south wing) covering the demolition of existing brick peaks and the construction of new masonry peaks, leaving the masonry walls unchanged; — reinforcement to the necessary extent of the existing, existing roof link in the wooden structure; — replacement of the existing roofing from ceram tiles. carp to new from the ceram tile. tab imitating a monk-mniszka tile. The contractor will be obliged to provide access to the facility from the ground level (adapting to the needs of people with mobility disabilities). (English)
21 October 2020
0 references
Identifiers
RPZP.04.01.00-32-2014/17
0 references