Construction of the sanitary sewage system in Granowo. (Q137903): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The object of the project is the construction of a gravitational sewage system with a total length of 4 183 m in Granowo, with the modernisation of the pumping station, sewage connections to the one (up to the boundary of the plot), electric connections, network connections to the existing sewage treatment plant. As a result of the investment, a sewerage network with a length of 4 183 m (gravity channel length 2 982.4 m, length of sewage sewer...)
(‎Created claim: summary (P836): The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity...)
Property / summary
 
The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity canals 2982.4 m, length of discharge sewers 1201 m) in Granowo (Krzęcin commune). The task of the designed sanitary canals will be to collect household and economic sewage from the existing and planned construction in Granów. The existing pumping plant presses waste water into a sewage treatment plant in Krzęcin. The pipeline will run along the access roads. Connections to the property (88 pieces) were designed to the border of the plot. The Municipal Economy and Environmental Protection Team in Krzęcin will provide services to the residents in the field of sewage discharge and water supply. The project shall include: 1. construction of a sewerage network with a length of 4183 m, including: — length of gravitational ducts – 2982 m, -length of pressing channels – 1201 m, 2. construction of 5 sewage pumping plants with electric power supply, 3. making 88 connections to the property border, 4. modernisation of the existing sewage pumping plant, in order to adapt it to the new sewage network – replacement of pumps. The project covers the area of Granowo without sanitary sewage system. (English)
Property / summary: The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity canals 2982.4 m, length of discharge sewers 1201 m) in Granowo (Krzęcin commune). The task of the designed sanitary canals will be to collect household and economic sewage from the existing and planned construction in Granów. The existing pumping plant presses waste water into a sewage treatment plant in Krzęcin. The pipeline will run along the access roads. Connections to the property (88 pieces) were designed to the border of the plot. The Municipal Economy and Environmental Protection Team in Krzęcin will provide services to the residents in the field of sewage discharge and water supply. The project shall include: 1. construction of a sewerage network with a length of 4183 m, including: — length of gravitational ducts – 2982 m, -length of pressing channels – 1201 m, 2. construction of 5 sewage pumping plants with electric power supply, 3. making 88 connections to the property border, 4. modernisation of the existing sewage pumping plant, in order to adapt it to the new sewage network – replacement of pumps. The project covers the area of Granowo without sanitary sewage system. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity canals 2982.4 m, length of discharge sewers 1201 m) in Granowo (Krzęcin commune). The task of the designed sanitary canals will be to collect household and economic sewage from the existing and planned construction in Granów. The existing pumping plant presses waste water into a sewage treatment plant in Krzęcin. The pipeline will run along the access roads. Connections to the property (88 pieces) were designed to the border of the plot. The Municipal Economy and Environmental Protection Team in Krzęcin will provide services to the residents in the field of sewage discharge and water supply. The project shall include: 1. construction of a sewerage network with a length of 4183 m, including: — length of gravitational ducts – 2982 m, -length of pressing channels – 1201 m, 2. construction of 5 sewage pumping plants with electric power supply, 3. making 88 connections to the property border, 4. modernisation of the existing sewage pumping plant, in order to adapt it to the new sewage network – replacement of pumps. The project covers the area of Granowo without sanitary sewage system. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:37, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewage system in Granowo.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,562,505.95 zloty
    0 references
    375,001.43 Euro
    13 January 2020
    0 references
    1,838,242.35 zloty
    0 references
    441,178.16 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 June 2015
    0 references
    28 February 2019
    0 references
    GMINA KRZĘCIN
    0 references
    Przedmiotem projektu jest budowa sieci kanalizacji sanitarnej grawitacyjno – tłocznej o łącznej długości 4 183 m w miejscowości Granowo wraz z modernizacją przepompowni ścieków, przyłączeniami kanalizacyjnymi do posesji (do granicy działki), przyłączeniami elektrycznymi, podłączeniami sieci do istniejącej oczyszczalni ścieków. W wyniku realizacji inwestycji zostanie wybudowana sieć kanalizacji sanitarnej o długości 4183 m(długość kanałów grawitacyjnych 2982,4 m, długość kanałów kanalizacji tłocznej 1201 m) w miejscowości Granowo (gmina Krzęcin). Zadaniem projektowanych kanałów sanitarnych będzie odebranie ścieków bytowo - gospodarczych z istniejącej i planowanej zabudowy w Granowie. Istniejąca przepompownia tłoczy ścieki do oczyszczalni ścieków w Krzęcinie. Rurociąg przebiegał będzie wzdłuż dróg dojazdowych. Przyłącza do posesji (88 szt.) zaprojektowano do granicy działki. Obsługą mieszkańców w zakresie odprowadzania ścieków i dostarczania wody będzie zajmować się Zespół Gospodarki Komunalnej i Ochrony Środowiska w Krzęcinie. Projekt obejmuje: 1. budowę sieci kanalizacji o długości 4183m, w tym: -długość kanałów grawitacyjnych – 2982m, -długość kanałów tłocznych – 1201m, 2. budowę 5 przepompowni ścieków wraz z zasilaniem elektrycznym, 3. wykonanie 88 przyłączy do granicy posesji, 4. modernizację istniejącej przepompowni ścieków, celem dostosowania jej do nowopowstającej sieci kanalizacyjnej – wymiana pomp. Projektowana inwestycja obejmuje obszar miejscowości Granowo nie posiadający systemu kanalizacji sanitarnej. (Polish)
    0 references
    The subject of the project is the construction of a gravitational and pressing sanitary sewage system with a total length of 4183 m in Granowo with modernisation of the sewage pumping plant, sewage connections to the property (to the edge of the plot), electrical connections, network connections to the existing sewage treatment plant. As a result of the investment, a sanitary sewer system with a length of 4183 m will be built (length of gravity canals 2982.4 m, length of discharge sewers 1201 m) in Granowo (Krzęcin commune). The task of the designed sanitary canals will be to collect household and economic sewage from the existing and planned construction in Granów. The existing pumping plant presses waste water into a sewage treatment plant in Krzęcin. The pipeline will run along the access roads. Connections to the property (88 pieces) were designed to the border of the plot. The Municipal Economy and Environmental Protection Team in Krzęcin will provide services to the residents in the field of sewage discharge and water supply. The project shall include: 1. construction of a sewerage network with a length of 4183 m, including: — length of gravitational ducts – 2982 m, -length of pressing channels – 1201 m, 2. construction of 5 sewage pumping plants with electric power supply, 3. making 88 connections to the property border, 4. modernisation of the existing sewage pumping plant, in order to adapt it to the new sewage network – replacement of pumps. The project covers the area of Granowo without sanitary sewage system. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.03.06.00-32-B001/16
    0 references