Construction of the compressor and gravity sewerage network with the pumping stations in Warnino, Thochowo. (Q137901): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project takes into account one of the investments, i.e. the construction of a gravity sewerage network and a pressure sewage system located in the town of Warnino, a water sewage system located in the village of Warnino, which will be incorporated in the existing sewage treatment plant in the Typhoso.. the gravity and pressure sewage system will be included in the underground wastewater treatment plant. the two sewage pumping stations requ...)
(‎Created claim: summary (P836): The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations ar...)
Property / summary
 
The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations are sealed objects. The intended pumps do not require the use of additional grinding equipment for solid parts in sanitary sewage. Therefore, it is not necessary to designate a protection zone for the above mentioned objects. As part of the implementation of the investment, 2029.96 m² of sanitary sewage system will be built to which 158 inhabitants of Warnino can connect. The connection of residents to the sewage network will take place up to one year from the date of completion of the project, i.e. until 31.08.2018. 1 points. 2 of the Act of 13 September 1996 on maintaining cleanliness and order in municipalities (Dz. U. 2012. item. 391 with later amendments), property owners ensure cleanliness and order by connecting the property to the existing sewerage network. The project will be implemented in the following stages: the selection of the contractor of the investment; construction of a gravity sanitary sewer system; construction of pressure sanitary sewage system; construction of a sewage pumping plant with connections; supervision and management of investment. The project is a fixed investment. (English)
Property / summary: The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations are sealed objects. The intended pumps do not require the use of additional grinding equipment for solid parts in sanitary sewage. Therefore, it is not necessary to designate a protection zone for the above mentioned objects. As part of the implementation of the investment, 2029.96 m² of sanitary sewage system will be built to which 158 inhabitants of Warnino can connect. The connection of residents to the sewage network will take place up to one year from the date of completion of the project, i.e. until 31.08.2018. 1 points. 2 of the Act of 13 September 1996 on maintaining cleanliness and order in municipalities (Dz. U. 2012. item. 391 with later amendments), property owners ensure cleanliness and order by connecting the property to the existing sewerage network. The project will be implemented in the following stages: the selection of the contractor of the investment; construction of a gravity sanitary sewer system; construction of pressure sanitary sewage system; construction of a sewage pumping plant with connections; supervision and management of investment. The project is a fixed investment. (English) / rank
 
Normal rank
Property / summary: The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations are sealed objects. The intended pumps do not require the use of additional grinding equipment for solid parts in sanitary sewage. Therefore, it is not necessary to designate a protection zone for the above mentioned objects. As part of the implementation of the investment, 2029.96 m² of sanitary sewage system will be built to which 158 inhabitants of Warnino can connect. The connection of residents to the sewage network will take place up to one year from the date of completion of the project, i.e. until 31.08.2018. 1 points. 2 of the Act of 13 September 1996 on maintaining cleanliness and order in municipalities (Dz. U. 2012. item. 391 with later amendments), property owners ensure cleanliness and order by connecting the property to the existing sewerage network. The project will be implemented in the following stages: the selection of the contractor of the investment; construction of a gravity sanitary sewer system; construction of pressure sanitary sewage system; construction of a sewage pumping plant with connections; supervision and management of investment. The project is a fixed investment. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:37, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the compressor and gravity sewerage network with the pumping stations in Warnino, Thochowo.
Project in Poland financed by DG Regio

    Statements

    0 references
    594,254.54 zloty
    0 references
    142,621.09 Euro
    13 January 2020
    0 references
    699,123.0 zloty
    0 references
    167,789.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    30 November 2017
    0 references
    REGIONALNE WODOCIĄGI I KANALIZACJA SPÓŁKA Z O.O. W BIAŁOGARDZIE
    0 references
    0 references
    Projekt uwzględnia jedno działanie inwestycyjne,tj. budowę sieci kanalizacji sanitarnej grawitacyjnej oraz rurociągów tłocznych sieci kanalizacji ciśnieniowej wraz z przepompowniami ścieków zlokalizowanej w miejscowości Warnino, gm. Tychowo.Projektowana kanalizacja sanitarna ścieków bytowo–gospodarczych,włączona zostanie zgodnie z wydanymi warunkami technicznymi przyłączenia do istniejącej kanalizacji sanitarnej ciśnieniowej.Ścieki oczyszczone będą w istniejącej oczyszczalni ścieków w Tychowie.Sieci kanalizacji sanitarnej grawitacyjnej i ciśnieniowej zalicza się do obiektów liniowych podziemnego uzbrojenia bezpośredniej obsługi terenów.Przewidziane w projekcie dwie przepompownie ścieków wymagają przyłączenia do źródła energii.Na terenie działki każdej przepompowni przewiduje się lokalizację linii kablowych nN 0,4kV,szaf zasilająco-sterowniczych oraz słupów oświetleniowych. Projektowane przepompownie są obiektami szczelnymi. Przewidziane pompy nie wymagają stosowania dodatkowych urządzeń rozdrabniających części stałe znajdujące się w ściekach sanitarnych. W związku z tym nie jest potrzebne wyznaczanie dla w/w obiektów strefy ochronnej. W ramach realizacji inwestycji powstanie 2 029,96 mb sieci kanalizacji sanitarnej do której będzie mogło się podłączyć 158 mieszkańców miejscowości Warnino. Podłączenie mieszkańców do sieci kanalizacyjnej nastąpi do roku od daty zakończenia projektu, tj. do 31.08.2018.Zgodnie z art. 5 ust. 1 pkt. 2 ustawy z dnia 13 września 1996r. o utrzymaniu czystości i porządku w gminach (Dz. U. 2012. poz. 391 z pózn. zm.),właściciele nieruchomości zapewniają utrzymanie czystości i porządku przez przyłączenie nieruchomości do istniejącej sieci kanalizacyjnej. Projekt będzie realizowany w następujących etapach: wyłonienie wykonawcy inwestycji; budowa kanalizacji sanitarnej grawitacyjnej; budowa kanalizacji sanitarnej ciśnieniowej; budowa przepompowni ścieków wraz z przyłączeniami; nadzór i zarządzanie inwestycją. Projekt jest inwestycją stacjonarną. (Polish)
    0 references
    The project takes into account one investment action, i.e. construction of sanitary sewerage networks and pressure drainage pipes together with drainage pumping plants located in the village of Warnino, gm. Tychowo.Designed sanitary sewage drainage system of domestic and economic sewage, will be incorporated in accordance with the issued technical conditions of connection to the existing sanitary sewerage system. The designed pumping stations are sealed objects. The intended pumps do not require the use of additional grinding equipment for solid parts in sanitary sewage. Therefore, it is not necessary to designate a protection zone for the above mentioned objects. As part of the implementation of the investment, 2029.96 m² of sanitary sewage system will be built to which 158 inhabitants of Warnino can connect. The connection of residents to the sewage network will take place up to one year from the date of completion of the project, i.e. until 31.08.2018. 1 points. 2 of the Act of 13 September 1996 on maintaining cleanliness and order in municipalities (Dz. U. 2012. item. 391 with later amendments), property owners ensure cleanliness and order by connecting the property to the existing sewerage network. The project will be implemented in the following stages: the selection of the contractor of the investment; construction of a gravity sanitary sewer system; construction of pressure sanitary sewage system; construction of a sewage pumping plant with connections; supervision and management of investment. The project is a fixed investment. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.03.06.00-32-A007/16
    0 references