Modernisation of the rainwater system in the area of the city of Świnoujście — step 1 (Q137847): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project entitled: “The modernisation of the rainwater system in the area of the city of Świnoujście — step 1” is a stationary project and consists of 2 elements. 1. Modernisation of rainwater systems in so called Urban district. This district is the street of the Constitution on 3 May and a fragment of the city between ul. Piastowska and Sculpins. The beneficiary has a concept for this task. Rain sewers in this part of the city are based o...)
(‎Created claim: summary (P836): Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Con...)
Property / summary
 
Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Constitution 3 May, Piłsudski, Curious and M. Cassino. It is a highly urbanised area with compact buildings without larger green areas. Due to its representative nature and the reconstruction of the central communication system in recent years, it is planned to leave the dehydration of the district through existing channels and equipment. As part of the concept, it was proposed to build a canal about 0.50 m in the wharf. Wladyslaw IV from the canal in ul. The Constitution of 3 May (ZP1) via the canal in ul. Piłsudskiego (ZP2) and Monte Cassino (ZP3) to the PD1 pumping station and from the canal in ul. Chrobrygo (ZP5) for PD1 pumping station. 2. Modernisation of dehydration ul. J. Markiewicza in Świnoujście, which consists of rebuilding the existing rainwater drainage system together with inspection and drain wells. The existing rainwater drainage system will be dismantled and replaced. For this task, the beneficiary has documentation. The rain drainage network, along with branches to the drain wells and connections to existing facilities, is a gravitational channel, draining rainwater from road surfaces, pavements and existing buildings. Designed drops of wires will enable the gravitational outflow of rainwater. The beneficiary – City of Świnoujście will be responsible for preparing, implementing and maintaining the sustainability of the project. (English)
Property / summary: Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Constitution 3 May, Piłsudski, Curious and M. Cassino. It is a highly urbanised area with compact buildings without larger green areas. Due to its representative nature and the reconstruction of the central communication system in recent years, it is planned to leave the dehydration of the district through existing channels and equipment. As part of the concept, it was proposed to build a canal about 0.50 m in the wharf. Wladyslaw IV from the canal in ul. The Constitution of 3 May (ZP1) via the canal in ul. Piłsudskiego (ZP2) and Monte Cassino (ZP3) to the PD1 pumping station and from the canal in ul. Chrobrygo (ZP5) for PD1 pumping station. 2. Modernisation of dehydration ul. J. Markiewicza in Świnoujście, which consists of rebuilding the existing rainwater drainage system together with inspection and drain wells. The existing rainwater drainage system will be dismantled and replaced. For this task, the beneficiary has documentation. The rain drainage network, along with branches to the drain wells and connections to existing facilities, is a gravitational channel, draining rainwater from road surfaces, pavements and existing buildings. Designed drops of wires will enable the gravitational outflow of rainwater. The beneficiary – City of Świnoujście will be responsible for preparing, implementing and maintaining the sustainability of the project. (English) / rank
 
Normal rank
Property / summary: Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Constitution 3 May, Piłsudski, Curious and M. Cassino. It is a highly urbanised area with compact buildings without larger green areas. Due to its representative nature and the reconstruction of the central communication system in recent years, it is planned to leave the dehydration of the district through existing channels and equipment. As part of the concept, it was proposed to build a canal about 0.50 m in the wharf. Wladyslaw IV from the canal in ul. The Constitution of 3 May (ZP1) via the canal in ul. Piłsudskiego (ZP2) and Monte Cassino (ZP3) to the PD1 pumping station and from the canal in ul. Chrobrygo (ZP5) for PD1 pumping station. 2. Modernisation of dehydration ul. J. Markiewicza in Świnoujście, which consists of rebuilding the existing rainwater drainage system together with inspection and drain wells. The existing rainwater drainage system will be dismantled and replaced. For this task, the beneficiary has documentation. The rain drainage network, along with branches to the drain wells and connections to existing facilities, is a gravitational channel, draining rainwater from road surfaces, pavements and existing buildings. Designed drops of wires will enable the gravitational outflow of rainwater. The beneficiary – City of Świnoujście will be responsible for preparing, implementing and maintaining the sustainability of the project. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:30, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the rainwater system in the area of the city of Świnoujście — step 1
Project in Poland financed by DG Regio

    Statements

    0 references
    3,262,847.86 zloty
    0 references
    783,083.49 Euro
    13 January 2020
    0 references
    3,838,644.55 zloty
    0 references
    921,274.69 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 March 2016
    0 references
    30 September 2019
    0 references
    GMINA MIASTO ŚWINOUJŚCIE
    0 references
    0 references
    Projekt pn. "Modernizacja sieci deszczowych na terenie miasta Świnoujście- etap 1" jest projektem stacjonarnym i składa się z 2 elementów. 1. Modernizacja sieci deszczowych w tzw. Dzielnicy Śródmiejskiej. Dzielnicę tą stanowi ulica Konstytucji 3 Maja i fragm. miasta pomiędzy ul. Piastowską a Świną. Na to zadanie Beneficjent posiada opracowaną koncepcję. Kanalizacja deszczowa w tej części miasta oparta jest na kanałach O 0,60m i O 0,65m w ul. Konstytucji 3 Maja, Piłsudskiego, Krzywoustego i M. Cassino. Jest to obszar silnie zurbanizowany ze zwartą zabudową bez większych powierzchni zielonych. Ze względu na reprezentacyjny charakter oraz zrealizowaną w ostatnich latach przebudowę centralnego układu komunikacyjnego, zaplanowano pozostawienie odwodnienia dzielnicy poprzez istniejące kanały i urządzenia. W ramach koncepcji zaproponowano budowę kanału zbiorczego O 0,50m w nabrzeżu ul. Władysława IV od kanału w ul. Konstytucji 3 Maja (ZP1) poprzez kanał w ul. Piłsudskiego (ZP2) i Monte Cassino (ZP3) do przepompowni PD1 oraz od kanału w ul. Chrobrego (ZP5) do przepompowni PD1. 2. Modernizacja odwodnienia ul. J. Markiewicza w Świnoujściu, polegająca na przebudowie istniejącej kanalizacji deszczowej wraz ze studzienkami rewizyjnymi i wpustowymi. Istniejąca kanalizacja deszczowa zostanie zdemontowana i zastąpiona zaprojektowaną. Na to zadanie Beneficjent posiada dokumentację. Sieć kanalizacji deszczowej wraz z odgałęzieniami do studni wpustowych oraz przyłączami do istniejących obiektów stanowi kanał grawitacyjny, odprowadzający wody deszczowe z nawierzchni drogi, chodników oraz istniejącej zabudowy. Zaprojektowane spadki przewodów umożliwią grawitacyjny odpływ wód deszczowych. Za przygotowanie, realizację oraz utrzymanie trwałości projektu odpowiedzialny będzie Beneficjent – Gmina Miasto Świnoujście. (Polish)
    0 references
    Project Mon. “Modernisation of rain networks in Świnoujście – stage 1” is a fixed project and consists of 2 elements. 1. Modernisation of rain networks in so-called. The Midtown District. The district is the 3rd Constitution Street and the town’s fragm between the street. Piastowska and Pig. For this task, the beneficiary has developed a concept. Rainwater drainage in this part of the city is based on canals of 0.60 m and O 0.65 m in street. Constitution 3 May, Piłsudski, Curious and M. Cassino. It is a highly urbanised area with compact buildings without larger green areas. Due to its representative nature and the reconstruction of the central communication system in recent years, it is planned to leave the dehydration of the district through existing channels and equipment. As part of the concept, it was proposed to build a canal about 0.50 m in the wharf. Wladyslaw IV from the canal in ul. The Constitution of 3 May (ZP1) via the canal in ul. Piłsudskiego (ZP2) and Monte Cassino (ZP3) to the PD1 pumping station and from the canal in ul. Chrobrygo (ZP5) for PD1 pumping station. 2. Modernisation of dehydration ul. J. Markiewicza in Świnoujście, which consists of rebuilding the existing rainwater drainage system together with inspection and drain wells. The existing rainwater drainage system will be dismantled and replaced. For this task, the beneficiary has documentation. The rain drainage network, along with branches to the drain wells and connections to existing facilities, is a gravitational channel, draining rainwater from road surfaces, pavements and existing buildings. Designed drops of wires will enable the gravitational outflow of rainwater. The beneficiary – City of Świnoujście will be responsible for preparing, implementing and maintaining the sustainability of the project. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.03.03.00-32-A014/16
    0 references