The “PV” system of the PSS in Sławno (Q137815): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of a comprehensive preparation and implementation of the investment in renewable energy sources in the ‘Spot’ of the PSS in Sławno, in the form of a PV system with accompanying actions. The project consists of the purchase, supply, installation and launch of four (separate) solar photovoltaic (separate) solar PV installations with a total installed capacity of 86,92 kWp. Investment carried out in four locations in Sławat:...)
(‎Created claim: summary (P836): The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sław...)
Property / summary
 
The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sławna: Wyszyńskiego Square 1, Prusa 12, Gdańska 11, Sempołowska 1c. Energy will be used for own needs of the Applicants (WD) – installations will supply electricity to food stores run by him. The project plans to implement the following activities: 1) Preparatory work: IT’S 1.1. The choice of the Contractor; IT’S 1.2. Execution of the conceptual design of the PV installation; 2. Scope in kind: Purchase, supply and assembly of photovoltaic installations and administrative activities (notification and connection of the installation, contract with the distribution network operator); 3) Promotion of the Project. The investment does not include any work requiring a construction permit or a declaration for construction works. Assembly works will be carried out by the selected contractor. The installations will then be connected to the existing PPE and notified to the network operator. The project is stationary. Period of implementation: 01.04.2017 to 31.03.2018 (English)
Property / summary: The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sławna: Wyszyńskiego Square 1, Prusa 12, Gdańska 11, Sempołowska 1c. Energy will be used for own needs of the Applicants (WD) – installations will supply electricity to food stores run by him. The project plans to implement the following activities: 1) Preparatory work: IT’S 1.1. The choice of the Contractor; IT’S 1.2. Execution of the conceptual design of the PV installation; 2. Scope in kind: Purchase, supply and assembly of photovoltaic installations and administrative activities (notification and connection of the installation, contract with the distribution network operator); 3) Promotion of the Project. The investment does not include any work requiring a construction permit or a declaration for construction works. Assembly works will be carried out by the selected contractor. The installations will then be connected to the existing PPE and notified to the network operator. The project is stationary. Period of implementation: 01.04.2017 to 31.03.2018 (English) / rank
 
Normal rank
Property / summary: The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sławna: Wyszyńskiego Square 1, Prusa 12, Gdańska 11, Sempołowska 1c. Energy will be used for own needs of the Applicants (WD) – installations will supply electricity to food stores run by him. The project plans to implement the following activities: 1) Preparatory work: IT’S 1.1. The choice of the Contractor; IT’S 1.2. Execution of the conceptual design of the PV installation; 2. Scope in kind: Purchase, supply and assembly of photovoltaic installations and administrative activities (notification and connection of the installation, contract with the distribution network operator); 3) Promotion of the Project. The investment does not include any work requiring a construction permit or a declaration for construction works. Assembly works will be carried out by the selected contractor. The installations will then be connected to the existing PPE and notified to the network operator. The project is stationary. Period of implementation: 01.04.2017 to 31.03.2018 (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:30, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The “PV” system of the PSS in Sławno
Project in Poland financed by DG Regio

    Statements

    0 references
    407,575.0 zloty
    0 references
    97,818.0 Euro
    13 January 2020
    0 references
    479,500.0 zloty
    0 references
    115,080.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 December 2018
    0 references
    30 June 2019
    0 references
    "SPOŁEM" POWSZECHNA SPÓŁDZIELNIA SPOŻYWCÓW W SŁAWNIE
    0 references
    0 references
    Przedmiotem projektu jest kompleksowe przygotowanie i realizacja inwestycji w odnawialne źródła energii w „Społem” PSS w Sławnie w postaci systemu PV wraz z działaniami towarzyszącymi. Projekt obejmuje zakup, dostawę, montaż oraz uruchomienie czterech (osobnych) nadachowych instalacji fotowoltaicznych o łącznej mocy zainstalowanej 86,92 kWp. Inwestycja realizowana w czterech lokalizacjach na terenie Sławna: Plac Wyszyńskiego 1, Prusa 12, Gdańska 11, Sempołowskiej 1c. Energia wykorzystywana będzie na potrzeby własne Wnioskodawcy (WD) - instalacje będą zaopatrywać w energie elektryczną prowadzone przez niego sklepy spożywcze. W ramach projektu zaplanowano realizację następujących działań: 1) Prace przygotowawcze: 1.1. Wybór Wykonawcy; 1.2. Wykonanie projektu koncepcyjnego instalacji PV); 2) Zakres rzeczowy: Zakup, dostawa i montaż instalacji fotowoltaicznych oraz Czynności administracyjne (zgłoszenie i przyłączenia instalacji, umowa z Operatorem sieci dystrybucyjnej); 3) Promocja Projektu. W ramach inwestycji nie przewidziano żadnych prac wymagających pozwolenia na budowę ani zgłoszenia z tytułu robót budowlanych. Przez wyłonionego Wykonawce zostaną przeprowadzone prace montażowe. Następnie instalacje zostaną przyłączone do istniejących PPE oraz zgłoszone do operatora sieci. Projekt ma charakter stacjonarny. Okres realizacji: od 01.04.2017 do 31.03.2018 roku (Polish)
    0 references
    The subject of the project is the comprehensive preparation and implementation of investments in renewable energy sources in the “Spol” of PSS in Sławow in the form of a PV system together with accompanying activities. The project includes the purchase, delivery, assembly and commissioning of four (separate) supervised photovoltaic installations with a total installed capacity of 86.92 kWp. The investment is carried out in four locations in Sławna: Wyszyńskiego Square 1, Prusa 12, Gdańska 11, Sempołowska 1c. Energy will be used for own needs of the Applicants (WD) – installations will supply electricity to food stores run by him. The project plans to implement the following activities: 1) Preparatory work: IT’S 1.1. The choice of the Contractor; IT’S 1.2. Execution of the conceptual design of the PV installation; 2. Scope in kind: Purchase, supply and assembly of photovoltaic installations and administrative activities (notification and connection of the installation, contract with the distribution network operator); 3) Promotion of the Project. The investment does not include any work requiring a construction permit or a declaration for construction works. Assembly works will be carried out by the selected contractor. The installations will then be connected to the existing PPE and notified to the network operator. The project is stationary. Period of implementation: 01.04.2017 to 31.03.2018 (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B223/17
    0 references