Solar installation at the Ład San (Q137755): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns the construction of a system of 76 photovoltaic panels of 20,15kWp, 3 inverters and other relevant components necessary for the proper functioning of the PV system. The floor area of the modules will be 127.4 m². The installation will be connected to the current electricity network of the building. The system produces 19 036 kWh of electricity and will at the same time reduce pollution and dust 15,81 tonne CO2 per year. Th...) |
(Created claim: summary (P836): The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2...) |
||||||||||||||
Property / summary | |||||||||||||||
The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2 per year. The designed electricity grid will allow energy to be introduced into the electricity grid. The appropriately selected power of the installation means that the company will not profit from any surplus energy. The installation will fully cover the entity’s energy demand. The installation with a power of 20,15 kWp will consist of: 76 photovoltaic panels with unit power of 265 Wp, three-phase inverters, mounting system designed for photovoltaic installations located on the roof, wiring, electrical dividers, female and male connectors type MC4, monitoring system. Ład-San as part of the project envisages the following activities: actions: Action No 1 – Preparatory Works – Implementation of the conceptual design of the installation and selection of subcontractors, Measure No. 2 – Selection of the contractor, Measure No. 3 – Realisation of the project – Purchase and assembly of the photovoltaic installations described above and administrative activities (notification, contract and network connection), Measure No.4 – Promotion – purchase and assembly of two information and promotional boards. (English) | |||||||||||||||
Property / summary: The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2 per year. The designed electricity grid will allow energy to be introduced into the electricity grid. The appropriately selected power of the installation means that the company will not profit from any surplus energy. The installation will fully cover the entity’s energy demand. The installation with a power of 20,15 kWp will consist of: 76 photovoltaic panels with unit power of 265 Wp, three-phase inverters, mounting system designed for photovoltaic installations located on the roof, wiring, electrical dividers, female and male connectors type MC4, monitoring system. Ład-San as part of the project envisages the following activities: actions: Action No 1 – Preparatory Works – Implementation of the conceptual design of the installation and selection of subcontractors, Measure No. 2 – Selection of the contractor, Measure No. 3 – Realisation of the project – Purchase and assembly of the photovoltaic installations described above and administrative activities (notification, contract and network connection), Measure No.4 – Promotion – purchase and assembly of two information and promotional boards. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2 per year. The designed electricity grid will allow energy to be introduced into the electricity grid. The appropriately selected power of the installation means that the company will not profit from any surplus energy. The installation will fully cover the entity’s energy demand. The installation with a power of 20,15 kWp will consist of: 76 photovoltaic panels with unit power of 265 Wp, three-phase inverters, mounting system designed for photovoltaic installations located on the roof, wiring, electrical dividers, female and male connectors type MC4, monitoring system. Ład-San as part of the project envisages the following activities: actions: Action No 1 – Preparatory Works – Implementation of the conceptual design of the installation and selection of subcontractors, Measure No. 2 – Selection of the contractor, Measure No. 3 – Realisation of the project – Purchase and assembly of the photovoltaic installations described above and administrative activities (notification, contract and network connection), Measure No.4 – Promotion – purchase and assembly of two information and promotional boards. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:20, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar installation at the Ład San |
Project in Poland financed by DG Regio |
Statements
75,259.85 zloty
0 references
88,541.0 zloty
0 references
85.0 percent
0 references
17 December 2017
0 references
22 January 2019
0 references
ZAKŁAD WYWOZU NIECZYSTOŚCI ŁAD-SAN S.C. TADEUSZ SZWED, KRYSTYNA SZWED
0 references
Projekt dotyczy budowy systemu 76 paneli fotowoltaicznych o mocy 20,15kWp, 3 falowników oraz pozostałych istotnych podzespołów niezbędnych do prawidłowego funkcjonowania systemu PV. Powierzchnia modułów wyniesie 127,4 m2. Instalacja zostanie podłączona od obecnej sieci elektroenergetycznej budynku. System wyprodukuje 19036 kWh energii elektrycznej i jednocześnie przyczyni się do redukcji zanieczyszczeń i pyłów 15,81 tony CO2 rocznie. Zaprojektowana sieć elektryczna umożliwi wprowadzanie energii do sieci elektroenergetycznej. Odpowiednio dobrana moc instalacji sprawia, iż firma nie będzie czerpała zysków z ewentualnych nadwyżek energii. Instalacja pokryje całkowicie popyt na energię podmiotu. Instalacja o mocy 20,15 kWp będzie składała się z: 76 paneli fotowoltaicznych o mocy jednostkowej 265 Wp, Inwerterów trójfazowych, Systemu montażowego przeznaczonego do instalacji fotowoltaicznych usytuowanych na dachu, Okablowania, Rozdzielnic elektrycznych, Konektorów żeńskich i męskich typu MC4, Systemu monitoringu. Firma Ład-San w ramach realizacji projektu przewiduje następujące działania: działania: Działanie nr 1 – Prace przygotowawcze - Wykonanie projektu koncepcyjnego instalacji oraz wyłonienie podwykonawców, Działanie nr 2 - Wybór wykonawcy, Działanie nr 3 - Realizacja rzeczowa projektu - Zakup i montaż opisanych wyżej instalacji fotowoltaicznych oraz czynności administracyjne(zgłoszenie, umowa i podłączenie do sieci), Działanie nr 4 - Promocja - zakup i montaż dwóch tablic informacyjno-promocyjnych. (Polish)
0 references
The project concerns the construction of a system of 76 photovoltaic panels with a power of 20.15kWp, 3 inverters and other important components necessary for the proper functioning of the PV system. The area of the modules will be 127.4 m². The installation will be connected from the current electricity grid of the building. The system will produce 19036 kWh of electricity and at the same time reduce pollutants and dusts of 15.81 tonnes of CO2 per year. The designed electricity grid will allow energy to be introduced into the electricity grid. The appropriately selected power of the installation means that the company will not profit from any surplus energy. The installation will fully cover the entity’s energy demand. The installation with a power of 20,15 kWp will consist of: 76 photovoltaic panels with unit power of 265 Wp, three-phase inverters, mounting system designed for photovoltaic installations located on the roof, wiring, electrical dividers, female and male connectors type MC4, monitoring system. Ład-San as part of the project envisages the following activities: actions: Action No 1 – Preparatory Works – Implementation of the conceptual design of the installation and selection of subcontractors, Measure No. 2 – Selection of the contractor, Measure No. 3 – Realisation of the project – Purchase and assembly of the photovoltaic installations described above and administrative activities (notification, contract and network connection), Measure No.4 – Promotion – purchase and assembly of two information and promotional boards. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B066/17
0 references