(‎Removed claim: summary (P836): The project is stationary. The land under construction is located in m. A garden on plot No 298 within the geodesic to the land of 1 m. Electricity in the form of direct current through the photocell. It will be passed by inverters on 400V alternating current and then via a transformer network into the applicant’s electricity grid. It is envisaged to construct a photovoltaic unit mounted on a free-standing steel structure. In addition to the P...)
(‎Created claim: summary (P836): The project is stationary. The area is located in Płoty, on the street. Garden on plot no.298 located within the geodesic area of 1 m. Płoty.The real project will be in the area of Strategic Intervention (SSW).The project is to build a photovolt installation with a power of 90.21 kWp-291 photovoltaic cells with a capacity of 310Wp each. Electricity in the form of direct current via photovolt cells. It will be converted by inverters into alternat...)
Property / summary
 
The project is stationary. The area is located in Płoty, on the street. Garden on plot no.298 located within the geodesic area of 1 m. Płoty.The real project will be in the area of Strategic Intervention (SSW).The project is to build a photovolt installation with a power of 90.21 kWp-291 photovoltaic cells with a capacity of 310Wp each. Electricity in the form of direct current via photovolt cells. It will be converted by inverters into alternating current with a voltage of 400V, and then via the transformer network to the applicant’s power grid. The construction of a photovoltaic installation on a free-standing steel structure is envisaged. Apart from photovoltaic inst., no additional technical infr. plot is expected. Stages OF PROJECT REALISATION:1.Project document, including: map for project purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic-construction work, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation;termin-IV2018-IIkw.2019;3.Project surveillance, including installation of photovoltaic inst. IV2018-IIkw.2019;4.Investor supervision and project promotion, including:Investor supervision, information and promotion costs (purchase and installation of information and commemorative plaques) deadlineIV2018-IIkw.2019. For the implementation of the project will be the Municipality of Płota which will simultaneously manage the project. Direct Project Manager, currently acting as Head of the Department of Development of Gosp. and Local Government Investments. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp.ds. zam. publ. The accounting service of the project will be by the Treasurer of the Municipality, who cooperates (English)
Property / summary: The project is stationary. The area is located in Płoty, on the street. Garden on plot no.298 located within the geodesic area of 1 m. Płoty.The real project will be in the area of Strategic Intervention (SSW).The project is to build a photovolt installation with a power of 90.21 kWp-291 photovoltaic cells with a capacity of 310Wp each. Electricity in the form of direct current via photovolt cells. It will be converted by inverters into alternating current with a voltage of 400V, and then via the transformer network to the applicant’s power grid. The construction of a photovoltaic installation on a free-standing steel structure is envisaged. Apart from photovoltaic inst., no additional technical infr. plot is expected. Stages OF PROJECT REALISATION:1.Project document, including: map for project purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic-construction work, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation;termin-IV2018-IIkw.2019;3.Project surveillance, including installation of photovoltaic inst. IV2018-IIkw.2019;4.Investor supervision and project promotion, including:Investor supervision, information and promotion costs (purchase and installation of information and commemorative plaques) deadlineIV2018-IIkw.2019. For the implementation of the project will be the Municipality of Płota which will simultaneously manage the project. Direct Project Manager, currently acting as Head of the Department of Development of Gosp. and Local Government Investments. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp.ds. zam. publ. The accounting service of the project will be by the Treasurer of the Municipality, who cooperates (English) / rank
 
Normal rank
Property / summary: The project is stationary. The area is located in Płoty, on the street. Garden on plot no.298 located within the geodesic area of 1 m. Płoty.The real project will be in the area of Strategic Intervention (SSW).The project is to build a photovolt installation with a power of 90.21 kWp-291 photovoltaic cells with a capacity of 310Wp each. Electricity in the form of direct current via photovolt cells. It will be converted by inverters into alternating current with a voltage of 400V, and then via the transformer network to the applicant’s power grid. The construction of a photovoltaic installation on a free-standing steel structure is envisaged. Apart from photovoltaic inst., no additional technical infr. plot is expected. Stages OF PROJECT REALISATION:1.Project document, including: map for project purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic-construction work, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation;termin-IV2018-IIkw.2019;3.Project surveillance, including installation of photovoltaic inst. IV2018-IIkw.2019;4.Investor supervision and project promotion, including:Investor supervision, information and promotion costs (purchase and installation of information and commemorative plaques) deadlineIV2018-IIkw.2019. For the implementation of the project will be the Municipality of Płota which will simultaneously manage the project. Direct Project Manager, currently acting as Head of the Department of Development of Gosp. and Local Government Investments. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp.ds. zam. publ. The accounting service of the project will be by the Treasurer of the Municipality, who cooperates (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:09, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the water photovoltaic installation on the water in Płock
Project in Poland financed by DG Regio

    Statements

    0 references
    636,671.23 zloty
    0 references
    152,801.10 Euro
    13 January 2020
    0 references
    749,025.05 zloty
    0 references
    179,766.01 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 April 2016
    0 references
    30 June 2019
    0 references
    GMINA PŁOTY
    0 references
    0 references
    Projekt ma charakter stacjonarny. Teren przezn. pod zabudowę zlokalizowany jest w m. Płoty, przy ul. Ogrodowej na działce nr 298 znajdującej się w obrębie geodezyjnym 1 m. Płoty.Projekt real. będzie na obszarze Strategicznej Interwencji (SSW).Przedmiotem projektu jest budowa instalacji fotowolt. o mocy 90,21 kWp–291 ogniwa fotowoltaiczne o mocy 310Wp każde. Energia elektryczna w postaci prądu stałego prod. przez ogniwa fotowolt. Będzie przekszt. przez falowniki na prąd zmienny o napięciu 400V,a następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy. Przewiduje się budowę inst. fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej.Konstrukcja posadowiona będzie palach wbijanych. Oprócz inst. fotowoltaicznej nie przewiduje się wykonania na działce dodatkowej infr. technicznej. ETAPY REALIZACJI PROJEKTU:1.Przyg. dok. projektu w tym: mapa do celów proj., dokumentacja projektowo-przetargowa, opracowanie studium wykonalności (IV-V 2016r); 2.Budowa inst. fotowoltaicznej-prace budowlano-instalacyjne, w tym: Przygotowanie terenu pod budowę, Konstrukcja wsporcza pod panele; Moduły i inwertery; Okablowanie; Rozdzielnice i zabezpieczenia elektryczne; Telemechanika i zabezp.; Instalacja uziemiająca i wyrównawcza;termin-IV2018-IIkw.2019;3.Prace zabezp. teren objęty proj, w tym montaż sys. monit. inst. fotowoltaicznej IV2018-IIkw.2019;4.Nadzór inwestorski i promocja projektu, w tym:nadzór inwestorski,koszty informacji i promocji (zakup i montaż tablic informacyjnej i pamiątkowej) terminIV2018-IIkw.2019. Za realizację proj odp. będzie Gmina Płoty która jednocześnie będzie zarządzała projektem. Do wdrażanie projektu zaangażowany zost. bezpośrednio Kierownik proj. pełniący obecnie funkcję kierownika Referatu Rozwoju Gosp. i Inwestycji Samorządowych. Pozostali członkowie zesp. zarządzającego proj.: Sp.ds. rozliczenia i promocji projektu oraz Sp.ds. zam. publ. Obsługa księgowa projektu prow. będzie przez Skarbnika Gminy,który współpracować (Polish)
    0 references
    The project is stationary. The area is located in Płoty, on the street. Garden on plot no.298 located within the geodesic area of 1 m. Płoty.The real project will be in the area of Strategic Intervention (SSW).The project is to build a photovolt installation with a power of 90.21 kWp-291 photovoltaic cells with a capacity of 310Wp each. Electricity in the form of direct current via photovolt cells. It will be converted by inverters into alternating current with a voltage of 400V, and then via the transformer network to the applicant’s power grid. The construction of a photovoltaic installation on a free-standing steel structure is envisaged. Apart from photovoltaic inst., no additional technical infr. plot is expected. Stages OF PROJECT REALISATION:1.Project document, including: map for project purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic-construction work, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation;termin-IV2018-IIkw.2019;3.Project surveillance, including installation of photovoltaic inst. IV2018-IIkw.2019;4.Investor supervision and project promotion, including:Investor supervision, information and promotion costs (purchase and installation of information and commemorative plaques) deadlineIV2018-IIkw.2019. For the implementation of the project will be the Municipality of Płota which will simultaneously manage the project. Direct Project Manager, currently acting as Head of the Department of Development of Gosp. and Local Government Investments. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp.ds. zam. publ. The accounting service of the project will be by the Treasurer of the Municipality, who cooperates (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A034/16