Comprehensive renovation of multi-family buildings in the future in Myślisborzu with the use of renewable energy installations and a smart system for the management of energy. (Q137650): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns a comprehensive thermal renovation of 5 multi-family residential buildings located in M.Myślibórz (postal code: 74-200) at Os. Slavic 3-10; 11-20; 29 TO 34 35 TO 39 40-43 managed by the ‘Future’ Housing Cooperative in Myślisborz. The project is stationary. The project is the subject of a project recommended in the energy audits of works and technologies which are identical for each of the 5 buildings, guaranteeing the loss...) |
(Created claim: summary (P836): The project concerns comprehensive thermomodernisation of 5 multi-family residential buildings located in M.myslibórz (postal code: 74-200) at Os. Slavic 3-10; 11 TO 20; 29 TO 34; 35 TO 39; 40-43 managed by the Housing Cooperative “Future” in Myśliborz. The project is stationary. The subject of the Project is recommended in Energy Audits works and technologies, identical for each of the 5 buildings, guaranteeing reduction of heat loss by penetra...) |
||||||||||||||
Property / summary | |||||||||||||||
The project concerns comprehensive thermomodernisation of 5 multi-family residential buildings located in M.myslibórz (postal code: 74-200) at Os. Slavic 3-10; 11 TO 20; 29 TO 34; 35 TO 39; 40-43 managed by the Housing Cooperative “Future” in Myśliborz. The project is stationary. The subject of the Project is recommended in Energy Audits works and technologies, identical for each of the 5 buildings, guaranteeing reduction of heat loss by penetrating the outer walls, through the ceiling above the cellar, through the windows in the cellars of the building. The project included construction works (increasing, window replacement) and installation in the scope of modernisation of the hot water preparation system, modernisation of the heating system in the building, installation of photovoltaic installations. In addition, in the scope of the project installation of LED displays on each of the 5 buildings showing the effects of the investment, i.e. reduction of CO2 emissions, reduction of final energy consumption, savings for residents. The displays are intended to be demonstrative. The project will be implemented by the Applicant. The project will be implemented in stages. As part of the tasks, 1 are foreseen. Thermal modernisation works on 5 buildings, 2. RES installation on 5 buildings, 3. Promotion of the project. The entity managing the infrastructure created as a result of the project will be SM Future. It is not envisaged to transfer the infrastructure in the management of the external operator. The applicant is and will be the sole owner of the property covered by the project. The applicant is the only one entitled to carry out the project. (English) | |||||||||||||||
Property / summary: The project concerns comprehensive thermomodernisation of 5 multi-family residential buildings located in M.myslibórz (postal code: 74-200) at Os. Slavic 3-10; 11 TO 20; 29 TO 34; 35 TO 39; 40-43 managed by the Housing Cooperative “Future” in Myśliborz. The project is stationary. The subject of the Project is recommended in Energy Audits works and technologies, identical for each of the 5 buildings, guaranteeing reduction of heat loss by penetrating the outer walls, through the ceiling above the cellar, through the windows in the cellars of the building. The project included construction works (increasing, window replacement) and installation in the scope of modernisation of the hot water preparation system, modernisation of the heating system in the building, installation of photovoltaic installations. In addition, in the scope of the project installation of LED displays on each of the 5 buildings showing the effects of the investment, i.e. reduction of CO2 emissions, reduction of final energy consumption, savings for residents. The displays are intended to be demonstrative. The project will be implemented by the Applicant. The project will be implemented in stages. As part of the tasks, 1 are foreseen. Thermal modernisation works on 5 buildings, 2. RES installation on 5 buildings, 3. Promotion of the project. The entity managing the infrastructure created as a result of the project will be SM Future. It is not envisaged to transfer the infrastructure in the management of the external operator. The applicant is and will be the sole owner of the property covered by the project. The applicant is the only one entitled to carry out the project. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project concerns comprehensive thermomodernisation of 5 multi-family residential buildings located in M.myslibórz (postal code: 74-200) at Os. Slavic 3-10; 11 TO 20; 29 TO 34; 35 TO 39; 40-43 managed by the Housing Cooperative “Future” in Myśliborz. The project is stationary. The subject of the Project is recommended in Energy Audits works and technologies, identical for each of the 5 buildings, guaranteeing reduction of heat loss by penetrating the outer walls, through the ceiling above the cellar, through the windows in the cellars of the building. The project included construction works (increasing, window replacement) and installation in the scope of modernisation of the hot water preparation system, modernisation of the heating system in the building, installation of photovoltaic installations. In addition, in the scope of the project installation of LED displays on each of the 5 buildings showing the effects of the investment, i.e. reduction of CO2 emissions, reduction of final energy consumption, savings for residents. The displays are intended to be demonstrative. The project will be implemented by the Applicant. The project will be implemented in stages. As part of the tasks, 1 are foreseen. Thermal modernisation works on 5 buildings, 2. RES installation on 5 buildings, 3. Promotion of the project. The entity managing the infrastructure created as a result of the project will be SM Future. It is not envisaged to transfer the infrastructure in the management of the external operator. The applicant is and will be the sole owner of the property covered by the project. The applicant is the only one entitled to carry out the project. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:08, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive renovation of multi-family buildings in the future in Myślisborzu with the use of renewable energy installations and a smart system for the management of energy. |
Project in Poland financed by DG Regio |
Statements
821,475.0 zloty
0 references
3,390,076.0 zloty
0 references
24.23 percent
0 references
1 January 2018
0 references
31 December 2020
0 references
SPÓŁDZIELNIA MIESZKANIOWA "PRZYSZŁOŚĆ" W MYŚLIBORZU
0 references
Projekt dotyczy kompleksowej termomodernizacji 5 wielorodzinnych budynków mieszkalnych zlokalizowanych w M.Myślibórz (kod pocztowy: 74-200)pod adresami Os. Słowiańskie 3-10; 11-20; 29–34; 35–39; 40-43 zarządzanych przez Spółdzielnię Mieszkaniową "Przyszłość" w Myśliborzu. Projekt ma charakter stacjonarny. Przedmiotem Projektu są rekomendowane w Audytach Energetycznych prace i technologie, tożsame dla każdego z 5 budynków, gwarantujące zmniejszenie strat ciepła przez przenikanie przez ściany zewnętrzne, przez strop nad piwnicą, przez okna w piwnicach budynku. W ramach projektu zaplanowano prace budowlane(docieplenia, wymiana okien) oraz instalacyjne w zakresie modernizacji systemu przygotowania ciepłej wody użytkowej, modernizacji systemu grzewczego w budynku, montażu instalacji fotowoltaicznej. Ponadto w zakresie przedsięwzięcia montaż wyświetlaczy LED na każdym z 5 budynków obrazujących efekty inwestycji tj. redukcja emisji CO2, redukcja zużycia energii końcowej, oszczędności dla mieszkańców. Wyświetlacze mają mieć charakter demonstracyjny. Projekt będzie realizowany prze Wnioskodawcę. Projekt będzie wdrażany etapami. W ramach zadań przewiduje się 1. Prace termomodernizacyjne na 5 budynkach, 2. Montaż instalacji OZE na 5 budynkach, 3. Promocję projektu. Podmiotem zarządzającym infrastrukturą powstałą w wyniku realizacji projektu będzie SM Przyszłość. Nie przewiduje się przekazania infrastruktury w zarządzanie Operatorowi zewn. Wnioskodawca jest i będzie jedynym właścicielem majątku objętego projektem. Wnioskodawca jest jedynym uprawnionym do przeprowadzenia projektu. (Polish)
0 references
The project concerns comprehensive thermomodernisation of 5 multi-family residential buildings located in M.myslibórz (postal code: 74-200) at Os. Slavic 3-10; 11 TO 20; 29 TO 34; 35 TO 39; 40-43 managed by the Housing Cooperative “Future” in Myśliborz. The project is stationary. The subject of the Project is recommended in Energy Audits works and technologies, identical for each of the 5 buildings, guaranteeing reduction of heat loss by penetrating the outer walls, through the ceiling above the cellar, through the windows in the cellars of the building. The project included construction works (increasing, window replacement) and installation in the scope of modernisation of the hot water preparation system, modernisation of the heating system in the building, installation of photovoltaic installations. In addition, in the scope of the project installation of LED displays on each of the 5 buildings showing the effects of the investment, i.e. reduction of CO2 emissions, reduction of final energy consumption, savings for residents. The displays are intended to be demonstrative. The project will be implemented by the Applicant. The project will be implemented in stages. As part of the tasks, 1 are foreseen. Thermal modernisation works on 5 buildings, 2. RES installation on 5 buildings, 3. Promotion of the project. The entity managing the infrastructure created as a result of the project will be SM Future. It is not envisaged to transfer the infrastructure in the management of the external operator. The applicant is and will be the sole owner of the property covered by the project. The applicant is the only one entitled to carry out the project. (English)
21 October 2020
0 references
Identifiers
RPZP.02.07.00-32-B012/17
0 references