Thermo-modernisation of public utilities: Primary School in Okunica, Primary School of the Lefonida Telgi Primary School in Pyzyce, Pyzycka School of Music and Grade (Q137629): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The applicant of the project is Gmina Pyrzyce. In the context of the implementation of the thermomodernisation project, it will be subject to public utility facilities that fall within the scope of: — Building of the Primary School in Okunica, Okkunica 23 — wheel rims, parcel 162, KW: SZ2T/00026829/5 — Building of the Primary School with Integrated Departments in Pyrzyce, ul. Poznańska 2 — wheel strip, parcel: 10/5, KW: SZ2T/00026532/6, 10/1,...) |
(Created claim: summary (P836): The project’s applicant is the Municipality of Pyrzyce. Within the framework of the thermo-modernisation project, public utilities will be subjected to: — Building of the Primary School in Okunica, Okunica 23 – Okunica, plot no. 162, KW: SZ2T/00026829/5, – Building of the Primary School with Integration Branches in Pyrzyce Street. Poznańska 2 – perimeter 10 Pyrzyce, plots: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/0002...) |
||||||||||||||
Property / summary | |||||||||||||||
The project’s applicant is the Municipality of Pyrzyce. Within the framework of the thermo-modernisation project, public utilities will be subjected to: — Building of the Primary School in Okunica, Okunica 23 – Okunica, plot no. 162, KW: SZ2T/00026829/5, – Building of the Primary School with Integration Branches in Pyrzyce Street. Poznańska 2 – perimeter 10 Pyrzyce, plots: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/00028321/8, – Building of the Pyrzyce School of Music in Pyrzyce Street. John Paul II no. 5 – perimeter 9 Pyrzyce, plot 336/4, KW: SZ2T/00005829/2. The project will be implemented between 01.07.2017 and 31.12.2018. The project will be implemented using the “design and build” mode. Therefore, the project documentation constitutes an eligible cost. As part of the implementation of the construction works, works related to thermal modernisation will be carried out (the list of works has been specified in the energy audit and feasibility study), the construction of a photovoltaic installation together with a demonstration system. In addition, expenditure is planned: supervising engineer and project promotion. Key indicators will be achieved as part of the implementation of the investment: — Estimated annual decrease in greenhouse gas emissions [tonnes of CO2/year equivalent] – 199,06 – Reduction of annual primary energy consumption in public buildings [kWh/year] – 885 114,00 – Reduction of final energy consumption as a result of projects [GJ/year] – 3 173.51. (English) | |||||||||||||||
Property / summary: The project’s applicant is the Municipality of Pyrzyce. Within the framework of the thermo-modernisation project, public utilities will be subjected to: — Building of the Primary School in Okunica, Okunica 23 – Okunica, plot no. 162, KW: SZ2T/00026829/5, – Building of the Primary School with Integration Branches in Pyrzyce Street. Poznańska 2 – perimeter 10 Pyrzyce, plots: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/00028321/8, – Building of the Pyrzyce School of Music in Pyrzyce Street. John Paul II no. 5 – perimeter 9 Pyrzyce, plot 336/4, KW: SZ2T/00005829/2. The project will be implemented between 01.07.2017 and 31.12.2018. The project will be implemented using the “design and build” mode. Therefore, the project documentation constitutes an eligible cost. As part of the implementation of the construction works, works related to thermal modernisation will be carried out (the list of works has been specified in the energy audit and feasibility study), the construction of a photovoltaic installation together with a demonstration system. In addition, expenditure is planned: supervising engineer and project promotion. Key indicators will be achieved as part of the implementation of the investment: — Estimated annual decrease in greenhouse gas emissions [tonnes of CO2/year equivalent] – 199,06 – Reduction of annual primary energy consumption in public buildings [kWh/year] – 885 114,00 – Reduction of final energy consumption as a result of projects [GJ/year] – 3 173.51. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project’s applicant is the Municipality of Pyrzyce. Within the framework of the thermo-modernisation project, public utilities will be subjected to: — Building of the Primary School in Okunica, Okunica 23 – Okunica, plot no. 162, KW: SZ2T/00026829/5, – Building of the Primary School with Integration Branches in Pyrzyce Street. Poznańska 2 – perimeter 10 Pyrzyce, plots: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/00028321/8, – Building of the Pyrzyce School of Music in Pyrzyce Street. John Paul II no. 5 – perimeter 9 Pyrzyce, plot 336/4, KW: SZ2T/00005829/2. The project will be implemented between 01.07.2017 and 31.12.2018. The project will be implemented using the “design and build” mode. Therefore, the project documentation constitutes an eligible cost. As part of the implementation of the construction works, works related to thermal modernisation will be carried out (the list of works has been specified in the energy audit and feasibility study), the construction of a photovoltaic installation together with a demonstration system. In addition, expenditure is planned: supervising engineer and project promotion. Key indicators will be achieved as part of the implementation of the investment: — Estimated annual decrease in greenhouse gas emissions [tonnes of CO2/year equivalent] – 199,06 – Reduction of annual primary energy consumption in public buildings [kWh/year] – 885 114,00 – Reduction of final energy consumption as a result of projects [GJ/year] – 3 173.51. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:07, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermo-modernisation of public utilities: Primary School in Okunica, Primary School of the Lefonida Telgi Primary School in Pyzyce, Pyzycka School of Music and Grade |
Project in Poland financed by DG Regio |
Statements
3,463,929.79 zloty
0 references
4,075,211.55 zloty
0 references
85.0 percent
0 references
1 July 2019
0 references
30 September 2020
0 references
GMINA PYRZYCE
0 references
Wnioskodawcą projektu jest Gmina Pyrzyce. W ramach realizacji projektu termomodernizacji zostaną poddane obiekty użyteczności publicznej mieszczące się w: - Budynku Szkoły Podstawowej w Okunicy, Okunica 23 – obręb Okunica, nr działki 162, KW: SZ2T/00026829/5, - Budynku Szkoły Podstawowej z Oddziałami Integracyjnymi w Pyrzycach ul. Poznańska 2 - obręb 10 Pyrzyce, działki: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/00028321/8, - Budynku Pyrzyckiej Szkoły Muzycznej w Pyrzycach ul. Jana Pawła II nr 5 – obręb 9 Pyrzyce, działka 336/4, KW: SZ2T/00005829/2. Przedmiotowy projekt zostanie zrealizowany w okresie 01.07.2017 r. – 31.12.2018 r. Projekt będzie realizowany trybem „zaprojektuj i wybuduj”. W związku z powyższym dokumentacja projektowa stanowi koszt kwalifikowalny. W ramach realizacji robót budowlanych zostaną wykonane prace związane z termomodernizacją (wykaz prac został określony w audycie energetycznym oraz studium wykonalności), budową instalacji fotowoltaicznej wraz z systemem demonstracyjnym. Ponadto zaplanowane zostały wydatki: inżyniera nadzoru oraz promocji projektu. W ramach realizacji inwestycji zostaną osiągnięte kluczowe wskaźniki: - Szacowany roczny spadek emisji gazów cieplarnianych [tony równoważnika CO2/rok] – 199,06 - Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych [kWh/ rok] – 885 114,00 - Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów [GJ/rok] – 3 173,51. (Polish)
0 references
The project’s applicant is the Municipality of Pyrzyce. Within the framework of the thermo-modernisation project, public utilities will be subjected to: — Building of the Primary School in Okunica, Okunica 23 – Okunica, plot no. 162, KW: SZ2T/00026829/5, – Building of the Primary School with Integration Branches in Pyrzyce Street. Poznańska 2 – perimeter 10 Pyrzyce, plots: 10/5, KW: SZ2T/00026532/6, 10/1,n KW: SZ2T/00028321/8, 13/2 KW: SZ2T/00028321/8, – Building of the Pyrzyce School of Music in Pyrzyce Street. John Paul II no. 5 – perimeter 9 Pyrzyce, plot 336/4, KW: SZ2T/00005829/2. The project will be implemented between 01.07.2017 and 31.12.2018. The project will be implemented using the “design and build” mode. Therefore, the project documentation constitutes an eligible cost. As part of the implementation of the construction works, works related to thermal modernisation will be carried out (the list of works has been specified in the energy audit and feasibility study), the construction of a photovoltaic installation together with a demonstration system. In addition, expenditure is planned: supervising engineer and project promotion. Key indicators will be achieved as part of the implementation of the investment: — Estimated annual decrease in greenhouse gas emissions [tonnes of CO2/year equivalent] – 199,06 – Reduction of annual primary energy consumption in public buildings [kWh/year] – 885 114,00 – Reduction of final energy consumption as a result of projects [GJ/year] – 3 173.51. (English)
21 October 2020
0 references
Identifiers
RPZP.02.05.00-32-A064/16
0 references