The development of entrepreneurship in the Koszalowsko-Kołobrzazo-Białogzachowo-Białogorozachony area, by arming the white areas of the Białystok region of the White Investment Park in Białogard. (Q137456): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to improve the attractiveness of the investment zone within the KKBOF territory by arming part of the plot No 2/1 in Białogard. The scope of the project includes the following tasks: 1. Construction of a public bypass on a provincial road No 163 2. Construction of an internal road with drainage and technical infrastructure (road lighting installation, water supply and sanitation network, technical network) 3. Reconstr...) |
(Created claim: summary (P836): The aim of the project is to improve the attractiveness of the investment zone located in the KKBOF by arming part of the plot no.2/1 in Białogard. The project’s material scope shall cover the following tasks: 1. Construction of a public exit from Voivodeship Road No. 163 2. Construction of an internal road with dehydration and technical infrastructure (road lighting installation, water supply and sanitary sewerage system, teletechnical network)...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to improve the attractiveness of the investment zone located in the KKBOF by arming part of the plot no.2/1 in Białogard. The project’s material scope shall cover the following tasks: 1. Construction of a public exit from Voivodeship Road No. 163 2. Construction of an internal road with dehydration and technical infrastructure (road lighting installation, water supply and sanitary sewerage system, teletechnical network) 3. Conversion of overhead line 15 kV to terrestrial cable. 4. Delivery and installation of container transformer station Container transformer station will not be equipped with transformers and measuring system with transmissions. Equipment of the station with a transformer and measuring system and connection to the external network will take place when the investor is acquired. (English) | |||||||||||||||
Property / summary: The aim of the project is to improve the attractiveness of the investment zone located in the KKBOF by arming part of the plot no.2/1 in Białogard. The project’s material scope shall cover the following tasks: 1. Construction of a public exit from Voivodeship Road No. 163 2. Construction of an internal road with dehydration and technical infrastructure (road lighting installation, water supply and sanitary sewerage system, teletechnical network) 3. Conversion of overhead line 15 kV to terrestrial cable. 4. Delivery and installation of container transformer station Container transformer station will not be equipped with transformers and measuring system with transmissions. Equipment of the station with a transformer and measuring system and connection to the external network will take place when the investor is acquired. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to improve the attractiveness of the investment zone located in the KKBOF by arming part of the plot no.2/1 in Białogard. The project’s material scope shall cover the following tasks: 1. Construction of a public exit from Voivodeship Road No. 163 2. Construction of an internal road with dehydration and technical infrastructure (road lighting installation, water supply and sanitary sewerage system, teletechnical network) 3. Conversion of overhead line 15 kV to terrestrial cable. 4. Delivery and installation of container transformer station Container transformer station will not be equipped with transformers and measuring system with transmissions. Equipment of the station with a transformer and measuring system and connection to the external network will take place when the investor is acquired. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:37, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The development of entrepreneurship in the Koszalowsko-Kołobrzazo-Białogzachowo-Białogorozachony area, by arming the white areas of the Białystok region of the White Investment Park in Białogard. |
Project in Poland financed by DG Regio |
Statements
637,500.0 zloty
0 references
750,000.0 zloty
0 references
85.0 percent
0 references
20 November 2017
0 references
29 June 2018
0 references
BIAŁOGARDZKI PARK INWESTYCYJNY "INVEST-PARK" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Celem projektu jest poprawa atrakcyjności strefy inwestycyjnej leżącej na terenie KKBOF poprzez uzbrojenie części terenu działki nr 2/1 w Białogardzie. Zakres rzeczowy projektu obejmuje następujące zadania: 1. Budowa zjazdu publicznego z drogi wojewódzkiej nr 163 2. Budowa drogi wewnętrznej z odwodnieniem i infrastrukturą techniczną ( instalacja oświetlenia drogi, sieć wodociągowa i kanalizacji sanitarnej, sieć teletechniczna) 3. Przebudowa linii napowietrznej 15 kV na kablową naziemną. 4. Dostawa i montaż kontenerowej stacji transformatorowej Kontenerowa stacja transformatorowa nie będzie wyposażona w transformatory i układ pomiarowy wraz z przekładnikami. Wyposażenie stacji w transformator i układ pomiarowy oraz podłączenie do sieci zewnętrznej nastąpi w momencie pozyskania inwestora. (Polish)
0 references
The aim of the project is to improve the attractiveness of the investment zone located in the KKBOF by arming part of the plot no.2/1 in Białogard. The project’s material scope shall cover the following tasks: 1. Construction of a public exit from Voivodeship Road No. 163 2. Construction of an internal road with dehydration and technical infrastructure (road lighting installation, water supply and sanitary sewerage system, teletechnical network) 3. Conversion of overhead line 15 kV to terrestrial cable. 4. Delivery and installation of container transformer station Container transformer station will not be equipped with transformers and measuring system with transmissions. Equipment of the station with a transformer and measuring system and connection to the external network will take place when the investor is acquired. (English)
21 October 2020
0 references
Identifiers
RPZP.01.12.00-32-0001/17
0 references