Increasing the quality of coastal recreational infrastructure in Ostróda (Q132678): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will increase the quality of the coastal recreational infrastructure in Ostroda by: a.Upgrading the bathing water of jez. Sajmino: To upgrade the solar tank (s) to the renovation of the solar sanitary facilities/equipment in the infrastructure elements. (wind with a photovoltaic panel and equipment for mobile and tourist equipment., mobile and tourist charging, modular wooden frames, folding arrangements, collapsible arrangements,...) |
(Created claim: summary (P836): The project involves improving the quality of coastal recreational infrastructure in Ostróda by: a.Modernisation of the city bath on Jez. Saimino consisting of: —construction of the bridge with solar lamps -refurbishment of the building sanitary and social facilities -equipment with infrastr. extra.(world with photovoltaic panel and loading system of mobile devices and tourists., worlds for feeding mothers with rewinding, modular wooden footbrid...) |
||||||||||||||
Property / summary | |||||||||||||||
The project involves improving the quality of coastal recreational infrastructure in Ostróda by: a.Modernisation of the city bath on Jez. Saimino consisting of: —construction of the bridge with solar lamps -refurbishment of the building sanitary and social facilities -equipment with infrastr. extra.(world with photovoltaic panel and loading system of mobile devices and tourists., worlds for feeding mothers with rewinding, modular wooden footbridge, folding stands, external changing rooms, deposit cabinets, city monitoring) – construction of the economic building b. —construction of the bridge – adaptation of sanitary facilities by the use of partitions, -equipment with infrastr. addition. (worlds for nursing mothers with rewinding, modular wooden footbridge, modernisation of lighting for LED lamps, external changing rooms, deposit cabinets, monitoring) – ordinarily curing the area in the form of a walking-bike line connecting street. Tourist with a city swimming pool. c.Construction of the infrastr. by the water stand and camping field. on ul. Slovak, consisting of: — construction of a bridge (in the place of a dismantled platform) for 9 vessels, -equipment with infrastr. additional elements. (worlds for nursing mothers with scrolling). d.Equipment of infrastructure accessories.(worlds for nursing mothers with scrolling) on the waterfront of Jez. Drwęcki. The entity responsible for the project will be the Municipality of Ostróda through the relevant substantive departments. The City Council. The most important stages of the project are: —project preparation (technical doc., executable study, application for co-financing with annexes), -conducting tender procedures, -building works -promotion of the project -monitoring and project settlement The project implementation is in line with the assumptions set out in SzOOP RPO WiM Measure 6.2,Measure 6.2.3,Schemmat B, as the area of coastal areas for tourist purposes. (English) | |||||||||||||||
Property / summary: The project involves improving the quality of coastal recreational infrastructure in Ostróda by: a.Modernisation of the city bath on Jez. Saimino consisting of: —construction of the bridge with solar lamps -refurbishment of the building sanitary and social facilities -equipment with infrastr. extra.(world with photovoltaic panel and loading system of mobile devices and tourists., worlds for feeding mothers with rewinding, modular wooden footbridge, folding stands, external changing rooms, deposit cabinets, city monitoring) – construction of the economic building b. —construction of the bridge – adaptation of sanitary facilities by the use of partitions, -equipment with infrastr. addition. (worlds for nursing mothers with rewinding, modular wooden footbridge, modernisation of lighting for LED lamps, external changing rooms, deposit cabinets, monitoring) – ordinarily curing the area in the form of a walking-bike line connecting street. Tourist with a city swimming pool. c.Construction of the infrastr. by the water stand and camping field. on ul. Slovak, consisting of: — construction of a bridge (in the place of a dismantled platform) for 9 vessels, -equipment with infrastr. additional elements. (worlds for nursing mothers with scrolling). d.Equipment of infrastructure accessories.(worlds for nursing mothers with scrolling) on the waterfront of Jez. Drwęcki. The entity responsible for the project will be the Municipality of Ostróda through the relevant substantive departments. The City Council. The most important stages of the project are: —project preparation (technical doc., executable study, application for co-financing with annexes), -conducting tender procedures, -building works -promotion of the project -monitoring and project settlement The project implementation is in line with the assumptions set out in SzOOP RPO WiM Measure 6.2,Measure 6.2.3,Schemmat B, as the area of coastal areas for tourist purposes. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project involves improving the quality of coastal recreational infrastructure in Ostróda by: a.Modernisation of the city bath on Jez. Saimino consisting of: —construction of the bridge with solar lamps -refurbishment of the building sanitary and social facilities -equipment with infrastr. extra.(world with photovoltaic panel and loading system of mobile devices and tourists., worlds for feeding mothers with rewinding, modular wooden footbridge, folding stands, external changing rooms, deposit cabinets, city monitoring) – construction of the economic building b. —construction of the bridge – adaptation of sanitary facilities by the use of partitions, -equipment with infrastr. addition. (worlds for nursing mothers with rewinding, modular wooden footbridge, modernisation of lighting for LED lamps, external changing rooms, deposit cabinets, monitoring) – ordinarily curing the area in the form of a walking-bike line connecting street. Tourist with a city swimming pool. c.Construction of the infrastr. by the water stand and camping field. on ul. Slovak, consisting of: — construction of a bridge (in the place of a dismantled platform) for 9 vessels, -equipment with infrastr. additional elements. (worlds for nursing mothers with scrolling). d.Equipment of infrastructure accessories.(worlds for nursing mothers with scrolling) on the waterfront of Jez. Drwęcki. The entity responsible for the project will be the Municipality of Ostróda through the relevant substantive departments. The City Council. The most important stages of the project are: —project preparation (technical doc., executable study, application for co-financing with annexes), -conducting tender procedures, -building works -promotion of the project -monitoring and project settlement The project implementation is in line with the assumptions set out in SzOOP RPO WiM Measure 6.2,Measure 6.2.3,Schemmat B, as the area of coastal areas for tourist purposes. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:11, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the quality of coastal recreational infrastructure in Ostróda |
Project in Poland financed by DG Regio |
Statements
986,539.06 zloty
0 references
1,220,360.04 zloty
0 references
80.84 percent
0 references
9 December 2016
0 references
30 December 2019
0 references
GMINA MIEJSKA OSTRÓDA
0 references
Projekt zakłada podniesienie jakości przybrzeżnej infrastruktury rekreacyjnej w Ostródzie przez: a.Modernizację kąpieliska miejskiego nad Jez. Sajmino polegającą na: -przebudowie pomostu z lampami solarnymi -remoncie budynku zaplecza sanitarno-socjalnego -wyposażeniu w elementy infrastr. dodatk.(wiata z panelem fotowoltaicznym i syst. ładowania urządzeń mobilnych i turyst., wiata dla matek karmiących z przewijakiem, modułowa kładka drewniana, składane trybuny, przebieralnie zewnętrzne, szafki depozytowe, monitoring) -budowie budynku gospodarczego b.Modernizację kąpieliska miejskiego nad Jez. Drwęckim polegająca na: -przebudowie pomostu -dostosowaniu zaplecza sanitarnego przez zastosowanie przegród, -wyposażeniu w elementy infrastr. dodatk. (wiata dla matek karmiących z przewijakiem, modułowa kładka drewniana, modernizacja oświetlenia na lampy typu LED, przebieralnie zewnętrzne, szafki depozytowe, monitoring) -wyk. utwardzenia terenu w postaci ciągu pieszo-rowerowego łączącego ul. Turystyczną z kąpieliskiem miejskim. c.Budowę infrastr. przy stanicy wodnej i polu camping. przy ul. Słowackiego polegającej na: -budowie pomostu (w miejscu rozebranego pomostu) rekreacyjnego dla 9 jednostek pływających, -wyposażeniu w elementy infrastr. dodatk. (wiata dla matek karmiących z przewijakiem). d.Wyposażenie w elementy infrastruktury dodatk.(wiata dla matek karmiących z przewijakiem) nabrzeża Jez. Drwęckiego. Podmiotem odpowiedzialnym za projekt będzie Gmina Miejska Ostróda przez odpowiednie wydziały merytor. Urzędu Miejskiego. Najważniejsze etapy realizacji projektu: -przygotowanie projektu (dok. techniczne, studium wykonal., wniosek o dofinansowanie z załącznikami), -przeprowadzenie postępowań przetargowych, -roboty budowlane -promocja projektu -monitoring i rozliczenie projektu Realizacja projektu wpisuje się w założenia określone w SzOOP RPO WiM Działanie 6.2,Podziałanie 6.2.3,Schemat B, gdyż dot. zagospod. terenów przybrzeżnych na cele turystyczne. (Polish)
0 references
The project involves improving the quality of coastal recreational infrastructure in Ostróda by: a.Modernisation of the city bath on Jez. Saimino consisting of: —construction of the bridge with solar lamps -refurbishment of the building sanitary and social facilities -equipment with infrastr. extra.(world with photovoltaic panel and loading system of mobile devices and tourists., worlds for feeding mothers with rewinding, modular wooden footbridge, folding stands, external changing rooms, deposit cabinets, city monitoring) – construction of the economic building b. —construction of the bridge – adaptation of sanitary facilities by the use of partitions, -equipment with infrastr. addition. (worlds for nursing mothers with rewinding, modular wooden footbridge, modernisation of lighting for LED lamps, external changing rooms, deposit cabinets, monitoring) – ordinarily curing the area in the form of a walking-bike line connecting street. Tourist with a city swimming pool. c.Construction of the infrastr. by the water stand and camping field. on ul. Slovak, consisting of: — construction of a bridge (in the place of a dismantled platform) for 9 vessels, -equipment with infrastr. additional elements. (worlds for nursing mothers with scrolling). d.Equipment of infrastructure accessories.(worlds for nursing mothers with scrolling) on the waterfront of Jez. Drwęcki. The entity responsible for the project will be the Municipality of Ostróda through the relevant substantive departments. The City Council. The most important stages of the project are: —project preparation (technical doc., executable study, application for co-financing with annexes), -conducting tender procedures, -building works -promotion of the project -monitoring and project settlement The project implementation is in line with the assumptions set out in SzOOP RPO WiM Measure 6.2,Measure 6.2.3,Schemmat B, as the area of coastal areas for tourist purposes. (English)
21 October 2020
0 references
Identifiers
RPWM.06.02.03-28-0041/17
0 references