Construction of the wastewater treatment plant in the Lugansk region. (Q132493): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the construction of a mechanical and biological sewage treatment plant in the Lugansk area based on nitrification — denitrification activated sludge with oxygen stabilisation of the sediment in a continuous flow system with an average size of 1.266 m³/d. the plant of three independently operating biological sewage treatment plants will meet the needs of the Lukta agglomeration (p.e. 9 144), covering the following locali...) |
(Created claim: summary (P836): The object of the project is the construction of a mechanical-biological sewage treatment plant in Łukta, which operates on the basis of nitrifying – denitrifying sludge active with oxygen stabilisation of sediment in a continuous flow system with a medium-day efficiency of 1.266 m³/d. Purification plant, which consists of three independent technological sequences of biological sewage treatment plant, will satisfy the needs of Łukt’s agglomerati...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of a mechanical-biological sewage treatment plant in Łukta, which operates on the basis of nitrifying – denitrifying sludge active with oxygen stabilisation of sediment in a continuous flow system with a medium-day efficiency of 1.266 m³/d. Purification plant, which consists of three independent technological sequences of biological sewage treatment plant, will satisfy the needs of Łukt’s agglomeration area, including its 9th district. Łukta, Plichta, oak, Molza, performances, Worlina, Pelnik, Kotkowo, Florczaki, New ramotas, ramotas, Komorowo, Chudy Manor, Kozia Góra, Mostkowo, Taborz, butts, Spruce, Kojdy, Lusajny, Sobno, Trokajny, Zajączkowo, Gucin. The amount of wastewater cleaned as a result of the project will not change. The investment will be implemented by the Municipal Economy Department in Łukta Spółka z o. o. in the following stages: submission of an application for funding, conclusion of a co-financing agreement and contracts with the contractor, construction works, acceptance of the subject of the contract, final settlement and use during the lifetime. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020: 1. ensure the treatment of municipal waste water in accordance with the required parameters laid down in Union and national legislation, (2) will enable the assumed amount of waste water and cargo to be taken into the sewage treatment plant; 3) minimise the emissions of pollutants entering the ground, groundwater and surface water, along with living, economic and industrial sewage, and thus improving the natural environment, 4) will safeguard the needs related to the uneven flow of industrial sewage, meltwater or heavy rainfall. The project is included in the V update of the National Urban Waste Treatment Programme (VAKPOŚK) together with the ACP 2017 Master Plan for the implementation of Council Directive 91/271/EEC. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of a mechanical-biological sewage treatment plant in Łukta, which operates on the basis of nitrifying – denitrifying sludge active with oxygen stabilisation of sediment in a continuous flow system with a medium-day efficiency of 1.266 m³/d. Purification plant, which consists of three independent technological sequences of biological sewage treatment plant, will satisfy the needs of Łukt’s agglomeration area, including its 9th district. Łukta, Plichta, oak, Molza, performances, Worlina, Pelnik, Kotkowo, Florczaki, New ramotas, ramotas, Komorowo, Chudy Manor, Kozia Góra, Mostkowo, Taborz, butts, Spruce, Kojdy, Lusajny, Sobno, Trokajny, Zajączkowo, Gucin. The amount of wastewater cleaned as a result of the project will not change. The investment will be implemented by the Municipal Economy Department in Łukta Spółka z o. o. in the following stages: submission of an application for funding, conclusion of a co-financing agreement and contracts with the contractor, construction works, acceptance of the subject of the contract, final settlement and use during the lifetime. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020: 1. ensure the treatment of municipal waste water in accordance with the required parameters laid down in Union and national legislation, (2) will enable the assumed amount of waste water and cargo to be taken into the sewage treatment plant; 3) minimise the emissions of pollutants entering the ground, groundwater and surface water, along with living, economic and industrial sewage, and thus improving the natural environment, 4) will safeguard the needs related to the uneven flow of industrial sewage, meltwater or heavy rainfall. The project is included in the V update of the National Urban Waste Treatment Programme (VAKPOŚK) together with the ACP 2017 Master Plan for the implementation of Council Directive 91/271/EEC. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of a mechanical-biological sewage treatment plant in Łukta, which operates on the basis of nitrifying – denitrifying sludge active with oxygen stabilisation of sediment in a continuous flow system with a medium-day efficiency of 1.266 m³/d. Purification plant, which consists of three independent technological sequences of biological sewage treatment plant, will satisfy the needs of Łukt’s agglomeration area, including its 9th district. Łukta, Plichta, oak, Molza, performances, Worlina, Pelnik, Kotkowo, Florczaki, New ramotas, ramotas, Komorowo, Chudy Manor, Kozia Góra, Mostkowo, Taborz, butts, Spruce, Kojdy, Lusajny, Sobno, Trokajny, Zajączkowo, Gucin. The amount of wastewater cleaned as a result of the project will not change. The investment will be implemented by the Municipal Economy Department in Łukta Spółka z o. o. in the following stages: submission of an application for funding, conclusion of a co-financing agreement and contracts with the contractor, construction works, acceptance of the subject of the contract, final settlement and use during the lifetime. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020: 1. ensure the treatment of municipal waste water in accordance with the required parameters laid down in Union and national legislation, (2) will enable the assumed amount of waste water and cargo to be taken into the sewage treatment plant; 3) minimise the emissions of pollutants entering the ground, groundwater and surface water, along with living, economic and industrial sewage, and thus improving the natural environment, 4) will safeguard the needs related to the uneven flow of industrial sewage, meltwater or heavy rainfall. The project is included in the V update of the National Urban Waste Treatment Programme (VAKPOŚK) together with the ACP 2017 Master Plan for the implementation of Council Directive 91/271/EEC. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 17:41, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the wastewater treatment plant in the Lugansk region. |
Project in Poland financed by DG Regio |
Statements
8,766,574.82 zloty
0 references
13,751,489.92 zloty
0 references
63.75 percent
0 references
1 March 2019
0 references
31 December 2020
0 references
ZAKŁAD GOSPODARKI KOMUNALNEJ W ŁUKCIE SPÓŁKA Z O.O.
0 references
Przedmiotem projektu jest budowa mechaniczno-biologicznej oczyszczalni ścieków komunalnych w Łukcie, działającej w oparciu o nitryfikująco - denitryfikujący osad czynny z tlenową stabilizacją osadu w układzie przepływu ciągłego o wydajności średnio-dobowej 1.266 m3/d. Oczyszczalnia, w skład której wejdą trzy niezależnie pracujące ciągi technologiczne biologicznego oczyszczalnia ścieków, będzie zaspokajać potrzeby aglomeracji Łukta (RLM 9 144), obejmującej swym zasięgiem następujące miejscowości z terenu gminy Łukta: Łukta, Plichta, Dąg, Molza, Wynki, Worliny, Pelnik, Kotkowo, Florczaki, Nowe Ramoty, Ramoty, Komorowo, Chudy Dwór, Kozia Góra, Mostkowo, Tabórz, Pupki, Spórka, Kojdy, Ględy, Lusajny, Sobno, Trokajny, Zajączkowo, Gucin. Ilość ścieków oczyszczonych w wyniku realizacji projektu nie ulegnie zmianie. Inwestycja będzie wdrażana przez Zakład Gospodarki Komunalnej w Łukcie Spółka z o. o. w następujących etapach: złożenie wniosku o dofinansowanie, zawarcie umowy dofinansowania i umowy z wykonawcą, roboty budowlane, odbiór przedmiotu zamówienia, końcowe rozliczenie oraz użytkowanie w okresie eksploatacji. Projekt wpisuje się w założenia SzOOP RPO WiM 2014-2020: 1) zapewni oczyszczanie ścieków komunalnych zgodnie z wymaganymi parametrami określonymi w prawodawstwie unijnym i krajowym, 2) umożliwi przyjęcie założonej ilości ścieków oraz ładunku na oczyszczalnię ścieków; 3) zminimalizuje emisję zanieczyszczeń przedostających się do gruntu, wód gruntowych i powierzchniowych wraz ze ściekami bytowo-gospodarczymi i przemysłowymi, a co za tym idzie poprawę stanu środowiska naturalnego, 4) zabezpieczy potrzeby związane z nierównomiernością przepływów występujących w okresach dopływu ścieków przemysłowych, wód roztopowych lub silnych opadów deszczu. Projekt jest wpisany do V aktualizacji Krajowego Programu Oczyszczania Ścieków Komunalnych (VAKPOŚK) wraz z opracowanym na podstawie AKPOŚK 2017 Master Planem dla wdrażania dyrektywy Rady 91/271/EWG. (Polish)
0 references
The object of the project is the construction of a mechanical-biological sewage treatment plant in Łukta, which operates on the basis of nitrifying – denitrifying sludge active with oxygen stabilisation of sediment in a continuous flow system with a medium-day efficiency of 1.266 m³/d. Purification plant, which consists of three independent technological sequences of biological sewage treatment plant, will satisfy the needs of Łukt’s agglomeration area, including its 9th district. Łukta, Plichta, oak, Molza, performances, Worlina, Pelnik, Kotkowo, Florczaki, New ramotas, ramotas, Komorowo, Chudy Manor, Kozia Góra, Mostkowo, Taborz, butts, Spruce, Kojdy, Lusajny, Sobno, Trokajny, Zajączkowo, Gucin. The amount of wastewater cleaned as a result of the project will not change. The investment will be implemented by the Municipal Economy Department in Łukta Spółka z o. o. in the following stages: submission of an application for funding, conclusion of a co-financing agreement and contracts with the contractor, construction works, acceptance of the subject of the contract, final settlement and use during the lifetime. The project fits into the assumptions of the SzOOP RPO WiM 2014-2020: 1. ensure the treatment of municipal waste water in accordance with the required parameters laid down in Union and national legislation, (2) will enable the assumed amount of waste water and cargo to be taken into the sewage treatment plant; 3) minimise the emissions of pollutants entering the ground, groundwater and surface water, along with living, economic and industrial sewage, and thus improving the natural environment, 4) will safeguard the needs related to the uneven flow of industrial sewage, meltwater or heavy rainfall. The project is included in the V update of the National Urban Waste Treatment Programme (VAKPOŚK) together with the ACP 2017 Master Plan for the implementation of Council Directive 91/271/EEC. (English)
21 October 2020
0 references
Identifiers
RPWM.05.02.00-28-0014/18
0 references