Construction of the water mains in the village of Narty (Q132484): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The construction of a water network with a length of 8.59 km for the village of skis shall be designed: Parcels No eed.: 23/2, Branch Warchała, Dziki ewid.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73,...) |
(Created claim: summary (P836): It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇...) |
||||||||||||||
Property / summary | |||||||||||||||
It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ski area, plots no.: 104/18, 105, Burdig. The planned water supply system will be powered by water supply located in Warchały. The “sections” are designed in the waterworks of Warchały in the area of plot no. 23/2 Warchała, gm. Jedwabno. The village of Narty is located in the agglomeration, which is scanned. At present, Nart residents have built a sewage network, and they draw water from deep-water wells. The construction of deep wells by residents, summermen, guesthouses and hotels in the village of Narty causes the lake Swiejno to dry up. The implementation of the project will reduce the use of deep-water wells and contribute to improving water relations in Lake Świjno. 80 people will be connected to the newly built water supply network. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 – a specific objective – more sewage treatment and better quality of water through the construction of a new water supply network for residents, tourists, resorts and hotels in Narty. Applicant – Municipality of Jedwabno. In order to implement the project, a project implementation unit was established (Regulation No. 22/19 of 15.03.2019. (English) | |||||||||||||||
Property / summary: It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ski area, plots no.: 104/18, 105, Burdig. The planned water supply system will be powered by water supply located in Warchały. The “sections” are designed in the waterworks of Warchały in the area of plot no. 23/2 Warchała, gm. Jedwabno. The village of Narty is located in the agglomeration, which is scanned. At present, Nart residents have built a sewage network, and they draw water from deep-water wells. The construction of deep wells by residents, summermen, guesthouses and hotels in the village of Narty causes the lake Swiejno to dry up. The implementation of the project will reduce the use of deep-water wells and contribute to improving water relations in Lake Świjno. 80 people will be connected to the newly built water supply network. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 – a specific objective – more sewage treatment and better quality of water through the construction of a new water supply network for residents, tourists, resorts and hotels in Narty. Applicant – Municipality of Jedwabno. In order to implement the project, a project implementation unit was established (Regulation No. 22/19 of 15.03.2019. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ski area, plots no.: 104/18, 105, Burdig. The planned water supply system will be powered by water supply located in Warchały. The “sections” are designed in the waterworks of Warchały in the area of plot no. 23/2 Warchała, gm. Jedwabno. The village of Narty is located in the agglomeration, which is scanned. At present, Nart residents have built a sewage network, and they draw water from deep-water wells. The construction of deep wells by residents, summermen, guesthouses and hotels in the village of Narty causes the lake Swiejno to dry up. The implementation of the project will reduce the use of deep-water wells and contribute to improving water relations in Lake Świjno. 80 people will be connected to the newly built water supply network. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 – a specific objective – more sewage treatment and better quality of water through the construction of a new water supply network for residents, tourists, resorts and hotels in Narty. Applicant – Municipality of Jedwabno. In order to implement the project, a project implementation unit was established (Regulation No. 22/19 of 15.03.2019. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 17:35, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the water mains in the village of Narty |
Project in Poland financed by DG Regio |
Statements
1,421,791.61 zloty
0 references
1,672,696.01 zloty
0 references
85.0 percent
0 references
30 September 2019
0 references
31 August 2020
0 references
GMINA JEDWABNO
0 references
Projektuje się budowę sieci wodociągowej o długości 8,59 km dla miejscowości Narty: Działki nr ewid.: 23/2, obręb Warchały, Działki nr ewid.: 15, 18/38, 18/42, 18/52, 18/54, 20/10, 20/17, 20/22, 20/23, 20/26, 25/1, 26/5, 26/6, 26/8, 26/9, 27, 28, 29, 30, 31, 32/1, 34, 35, 36/1, 36/4, 37, 38, 39, 40/3, 41/7, 41/9, 41/13, 41/16, 41/45, 41/70, 41/71, 41/72, 43/18, 46/8, 46/21, 46/37, 46/38, 46/59, 46/60, 46/66, 46/67, 46/72, 46/73, 49/1, 50/1, 61/8, 61/16, 61/36, 61/46, 61/47, 61/78, 61/102, 61/123, 62, 76/1, 77/1, 77/3, 79/1, 79/5, 81/20, 81/25, 82/5, 82/9, 82/10, 82/11, 82/12, 82/14, 85/3, 85/8, 105/23, 105/42, 105/78, 105/102, 105/115, 110/1, 111, 114, 116/1, 118/1, 120/1, 121/8, 141/3; 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, obręb Narty, działki nr ewid.: 104/18, 105 obręb Burdąg. Projektowana sieć wodociągowa będzie zasilana z wodociągu zlokalizowanego w miejscowości Warchały. Projektuje się "wcinki" w wodociąg miejscowości Warchały na terenie działki nr 23/2 obręb Warchały, gm. Jedwabno. Miejscowość Narty położona jest na terenie aglomeracji, który jest skanalizowana. W chwili obecnej mieszkańcy Nart mają wybudowaną sieć kanalizacyjną, a wodę pobierają ze studni głębinowych. Budowa studni głębinowych przez mieszkańców, letników, pensjonaty i hotele w miejscowości Narty powoduje osuszanie się jeziora Świętajno. Realizacja projektu ograniczy korzystanie ze studni głębinowych i przyczyni się do poprawy stosunków wodnych jeziora Świętajno. Do nowo wybudowanej sieci wodociągowej zostanie podłączonych 80 os. Projekt wpisuje się w założenia określone w SzOOP RPO WiM 2014-2020 - cel szczegółowy - więcej oczyszczonych ścieków i lepsza jakość wody poprzez budowę nowej sieci wodociągowej dla mieszkańców, turystów, ośrodków wypoczynkowych i hoteli w miejscowości Narty. Wnioskodawca - Gmina Jedwabno. W celu realizacji projektu została powołana jednostka realizująca projekt (Zarządzenie Nr 22/19 z dnia 15.03.2019 r. Wójta Gminy Jedwabno). (Polish)
0 references
It is designed to build a 8.59 km long water supply network for the town of Narty: Plots no.: 23/2, Warchała region, plots no.: ⁇/⁇/⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇/⁇/⁇/⁇/⁇, ⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇/⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇/⁇, ⁇, ⁇/⁇, ⁇/⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, ⁇, 141/4, 141/9; 142/1, 154, 155, 156/2, 3071/5, 3071/11, ski area, plots no.: 104/18, 105, Burdig. The planned water supply system will be powered by water supply located in Warchały. The “sections” are designed in the waterworks of Warchały in the area of plot no. 23/2 Warchała, gm. Jedwabno. The village of Narty is located in the agglomeration, which is scanned. At present, Nart residents have built a sewage network, and they draw water from deep-water wells. The construction of deep wells by residents, summermen, guesthouses and hotels in the village of Narty causes the lake Swiejno to dry up. The implementation of the project will reduce the use of deep-water wells and contribute to improving water relations in Lake Świjno. 80 people will be connected to the newly built water supply network. The project fits into the assumptions set out in the SzOOP RPO WiM 2014-2020 – a specific objective – more sewage treatment and better quality of water through the construction of a new water supply network for residents, tourists, resorts and hotels in Narty. Applicant – Municipality of Jedwabno. In order to implement the project, a project implementation unit was established (Regulation No. 22/19 of 15.03.2019. (English)
21 October 2020
0 references
Identifiers
RPWM.05.02.00-28-0006/19
0 references