Improvement of living conditions of the inhabitants of the degraded area — thermal renovation of the residential building at ul. 1 May 64 in Orneo (Q132434): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is to carry out the work of thermal moderation of a residential building located at ul. 1 May 64 (dz. 106/22, rev 2) in Orneo. The project involves carrying out the work of thermal moderation in accordance with the structure of the structure. (Annex 5 to the proposal). The scope of the project includes insulation: longitudinal sides of a building, costume over the last floor, basement floors, basement floors, window...)
(‎Created claim: summary (P836): The subject of the project is to perform thermomodern works of a residential building located at ul. May 1, 64 (D. 106/22, rp 2) in Ornet. The project assumes the execution of thermomodern works. according to the construction design. (Appendix 5 to the request). The scope of the project includes warming: the exterior walls of the longitudinal building, the ceiling above the last floor, the ceilings of the cellars, the replacement of the basement...)
Property / summary
 
The subject of the project is to perform thermomodern works of a residential building located at ul. May 1, 64 (D. 106/22, rp 2) in Ornet. The project assumes the execution of thermomodern works. according to the construction design. (Appendix 5 to the request). The scope of the project includes warming: the exterior walls of the longitudinal building, the ceiling above the last floor, the ceilings of the cellars, the replacement of the basement windows, the windows in the laundry and drying room, the demolition of the walls of the glass blocks on the staircases, replacing the door to the carpenter energise., comprehensive repair of the balconies (cost of the repair of the wall panels.), modernise. installation of central and central interior, removes. — 54 points. The project will contribute to solving all identified key stakeholders’ problems in the project area. The robots will begin in the I quarter. 2018 and will end in the first quarter. 2019. The project will be implemented by an experienced team comprising employees of the cooperative: project manager, chief accountant, responsible for the technical supervision of the implementation of the investment" will be the President of the Cooperative with a technical degree in the field of land construction. In the first quarter. In 2017, construction works were submitted for the works covered by the project. In the first quarter. The construction contractor will be selected in 2018. The project fits into the assumption of the SzOOP RPO WiM 2014-2020, directly to the purpose of sub-measure 4.3.2: Increased energy efficiency of residential buildings. The project will increase the energy efficiency of the building by saving heat and electricity, reducing greenhouse gas emissions and reducing PM10 emissions. (English)
Property / summary: The subject of the project is to perform thermomodern works of a residential building located at ul. May 1, 64 (D. 106/22, rp 2) in Ornet. The project assumes the execution of thermomodern works. according to the construction design. (Appendix 5 to the request). The scope of the project includes warming: the exterior walls of the longitudinal building, the ceiling above the last floor, the ceilings of the cellars, the replacement of the basement windows, the windows in the laundry and drying room, the demolition of the walls of the glass blocks on the staircases, replacing the door to the carpenter energise., comprehensive repair of the balconies (cost of the repair of the wall panels.), modernise. installation of central and central interior, removes. — 54 points. The project will contribute to solving all identified key stakeholders’ problems in the project area. The robots will begin in the I quarter. 2018 and will end in the first quarter. 2019. The project will be implemented by an experienced team comprising employees of the cooperative: project manager, chief accountant, responsible for the technical supervision of the implementation of the investment" will be the President of the Cooperative with a technical degree in the field of land construction. In the first quarter. In 2017, construction works were submitted for the works covered by the project. In the first quarter. The construction contractor will be selected in 2018. The project fits into the assumption of the SzOOP RPO WiM 2014-2020, directly to the purpose of sub-measure 4.3.2: Increased energy efficiency of residential buildings. The project will increase the energy efficiency of the building by saving heat and electricity, reducing greenhouse gas emissions and reducing PM10 emissions. (English) / rank
 
Normal rank
Property / summary: The subject of the project is to perform thermomodern works of a residential building located at ul. May 1, 64 (D. 106/22, rp 2) in Ornet. The project assumes the execution of thermomodern works. according to the construction design. (Appendix 5 to the request). The scope of the project includes warming: the exterior walls of the longitudinal building, the ceiling above the last floor, the ceilings of the cellars, the replacement of the basement windows, the windows in the laundry and drying room, the demolition of the walls of the glass blocks on the staircases, replacing the door to the carpenter energise., comprehensive repair of the balconies (cost of the repair of the wall panels.), modernise. installation of central and central interior, removes. — 54 points. The project will contribute to solving all identified key stakeholders’ problems in the project area. The robots will begin in the I quarter. 2018 and will end in the first quarter. 2019. The project will be implemented by an experienced team comprising employees of the cooperative: project manager, chief accountant, responsible for the technical supervision of the implementation of the investment" will be the President of the Cooperative with a technical degree in the field of land construction. In the first quarter. In 2017, construction works were submitted for the works covered by the project. In the first quarter. The construction contractor will be selected in 2018. The project fits into the assumption of the SzOOP RPO WiM 2014-2020, directly to the purpose of sub-measure 4.3.2: Increased energy efficiency of residential buildings. The project will increase the energy efficiency of the building by saving heat and electricity, reducing greenhouse gas emissions and reducing PM10 emissions. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:34, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of living conditions of the inhabitants of the degraded area — thermal renovation of the residential building at ul. 1 May 64 in Orneo
Project in Poland financed by DG Regio

    Statements

    0 references
    305,717.09 zloty
    0 references
    73,372.10 Euro
    13 January 2020
    0 references
    419,416.79 zloty
    0 references
    100,660.03 Euro
    13 January 2020
    0 references
    72.89 percent
    0 references
    27 February 2017
    0 references
    31 March 2019
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA LOKATORSKO-WŁASNOŚCIOWA "DRWĘCA"
    0 references
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Przedmiotem projektu jest wykonanie prac termomodern. budynku mieszkalnego położonego przy ul. 1 Maja 64 (dz. 106/22, obr 2) w Ornecie. ?Projekt zakłada wykonanie prac termomodern. zgodnie z projektem budowl. (zał. nr 5 do wniosku). Zakres projektu obejmuje docieplenie: ścian zewnętrznych podłużnych budynku, stropu nad ostatnią kondygnacją, stropów piwnic, wymianę okienek piwnicznych, okien w pralni i suszarni, rozbiór ścianki z pustaków szklanych na klatkach schodowych, wymianę drzwi na stolarkę energooszcz., kompleksowy remont balkonów (koszt niekwalifik.),moderniza. instalacji c.o. i c.w.u., usunięc. docieplenia ścian osłonowych (ze wzg. na zły stan tech.), następnie remont ścian zew. i cokołu budynku, wykonanie parapetów zew. z blachy powlekanej, wymianę jednego wyłazu dachowego na kompletny systemowy, jeden wyłaz do likwidacji, malowanie ścian farbami silikonowymi, wykończenie ościeża, montaż opraw z czujnikami ruchu - 36 szt., wykonaniu instalacji elektry. wraz z przewod. - 54 punkty. Projekt przyczyni się do rozwiązania wszystkich zdiagnozowanych problemów kluczowych interesariuszy w obszarze objętym projektem. Roboty rozpoczną?? się? w I kw. 2018 r. a zakończą? w I kw. 2019 r. Projekt będzie wdrażany przez doświadczony zespół obejmujący pracowników spółdzielni w składzie: kierownik projektu, główna księgowa, za nadzór nad techniczną realizacją inwestycji odpowiadać´´ będzie Prezes Spółdzielni posiadająca wykształcenie wyższe techniczne w zakresie budownictwa lądowego. W I kw. 2017 r. dokonano zgłoszenia robót budowlanych na prace objęte projektem. W I kw. 2018 r. zostanie wyłoniony wykonawca robót budowlanych. Projekt wpisuje się?? w założenia SzOOP RPO WiM 2014-2020, bezpośrednio w cel poddziałania 4.3.2: Zwiększona efektywność energetyczna budynków mieszkalnych. W wyniku realizacji projektu zwiększy się?? efektywność energetyczna budynku poprzez oszczędność energii cieplnej i elektrycznej, spadek emisji gazów cieplarnianych i spadek emisji pyłów PM10. (Polish)
    0 references
    The subject of the project is to perform thermomodern works of a residential building located at ul. May 1, 64 (D. 106/22, rp 2) in Ornet. The project assumes the execution of thermomodern works. according to the construction design. (Appendix 5 to the request). The scope of the project includes warming: the exterior walls of the longitudinal building, the ceiling above the last floor, the ceilings of the cellars, the replacement of the basement windows, the windows in the laundry and drying room, the demolition of the walls of the glass blocks on the staircases, replacing the door to the carpenter energise., comprehensive repair of the balconies (cost of the repair of the wall panels.), modernise. installation of central and central interior, removes. — 54 points. The project will contribute to solving all identified key stakeholders’ problems in the project area. The robots will begin in the I quarter. 2018 and will end in the first quarter. 2019. The project will be implemented by an experienced team comprising employees of the cooperative: project manager, chief accountant, responsible for the technical supervision of the implementation of the investment" will be the President of the Cooperative with a technical degree in the field of land construction. In the first quarter. In 2017, construction works were submitted for the works covered by the project. In the first quarter. The construction contractor will be selected in 2018. The project fits into the assumption of the SzOOP RPO WiM 2014-2020, directly to the purpose of sub-measure 4.3.2: Increased energy efficiency of residential buildings. The project will increase the energy efficiency of the building by saving heat and electricity, reducing greenhouse gas emissions and reducing PM10 emissions. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.02-28-0086/17