Comprehensive thermal modernisation of the residential building at ul. Topolowa 14 in Bania Mazurskie (Q132338): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Comprehensive thermal modernisation of the residential building at ul. Topolowa 14 in Bania Mazurskie |
Revision as of 17:12, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive thermal modernisation of the residential building at ul. Topolowa 14 in Bania Mazurskie |
Project in Poland financed by DG Regio |
Statements
357,082.56 zloty
0 references
440,897.1 zloty
0 references
80.99 percent
0 references
7 March 2017
0 references
31 December 2020
0 references
WSPÓLNOTA MIESZKANIOWA „CZTERNASTKA" W BANIACH MAZURSKICH
0 references
Zakres prac obejmuje kompl. termomod. budynku położ. w miejsc.i Banie Mazurskie, w Gminie Banie Mazurskie. Budynek mieszkalny wielorodz. w konstr. trad. murow. posiada 3 kondygn. nadziemne w systemie OWT-67/SB/V. Pow. użytk. mieszkań - 1221,41 m2 W zakresie projektu zgodnie z audytem znajdują się następ. uspr. termomod.: •Inst. zaworów z głowicami termostatycznymi, •Wym. inst. oświetl. na klatkach schodowych, piwnicach i pralniach, w tym wymiana na energooszczędne typu LED, •Dociepl. ścian zewnętrzn. osłonowych i szczytowych nad ziemią, •Izolacja cieplna stropodachu, dociepl. stropu nad piwnicą, •Wym. stolarki okiennej zgodnie z wymog. RMI na 2021 r. •Nakładki na domofon w języku Braila, oznaczenia dla słabowidz. w kolorach kontrast. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozw. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inwestycji wdraż. będzie przez beneficj., który zapewnił zespół doświad. osób odpowiedz. za wdrożenie projektu, którzy posiad. wysokie kwalif. i doświadcz. w realiz. projektów wdroż. w latach 2007-2013, co potwierdza rozdział -sw. Przegrody budowlane budynków nie spełniają obecnie obowiąz. wymogów przenik. cieplnej. W wyniku realiz. projektu zmniejszona zostanie energochł. budynku objętego projektem na terenie Bań Mazurskich. Wykonane działania będą miały istotny wymiar w realizacji dokum. strateg. na poziomie region., krajowym oraz europ. - Gmina nie posiada PGN i LPR. Problem nie został wymyślony przez interes. - jest potrzebą potw. wykon. audytami energet., stwierdz. zasadność realizacji prac objętych projektem w celu zwiększ. efektyw. energet. budynku mieszk. Cel projektu jest zgodny z celami 4 osi prior. RPO WiM oraz SZOOP - Efekt. energ. Cel temat. 4 - wsp. przejścia na gosp. niskoem. we wszystkich sektorach - prioryt. inwest. 4c-wspieranie efekt. energ. ... - dzięki realiz. projektu zmniejszy się zużycie energii pierw. i zapot. na ciepło - r. 1.2 sw. (Polish)
0 references
The scope of works includes compl. thermomode. of the building located in places.i Banie Mazurskie, in the Municipality of Bana Mazurskie. The building has 3 floors above ground in the OWT-67/SB/V system. •Inst. valves with thermostatic heads, •Inst. illumination on stairways, cellars and laundry facilities, including replacement for energy-efficient LED type, •Temperature of exterior walls. shielded and peaked above the ground, •Heat insulation of stropodach, ceiling insulation above the cellar, •Vehicle of window carpentry according to the requirement. RMI for 2021 •Intercom covers in Braila, markings for weak colours contrast. For details on the scope of the item and accepted development can be found in chapter. 2.2 St. and in the techn. document extract annexed to the application. The whole range of investments in the implementation of the project will be through the beneficiary., which provided a team of experience. persons answer. for the implementation of the project, who possess. high qualified. and experience in the implementation of projects implemented in the years 2007-2013, which confirms the chapter -sw. Building partitions of buildings currently do not meet the requirements of heat transfer. As a result of the project, the energy efficiency of the building covered by the project will be reduced in the area of Bań Mazurskie. The actions carried out will have an important dimension in the implementation of the strategy at regional, national and European level. — The municipality does not have PGN and LPR. The problem wasn't invented by business. — is the need to perform energet audits, find the validity of the work covered by the project in order to increase. efficiencyw. energet. building bellow. The objective of the project is in line with the objectives of the 4 axis prior. RPO WiM and SZOOP – Effect. energ. Objective of the subject. 4 – communal transition to low-level operation in all sectors – prioritisation of investment. 4c-support effect. energ. ... — thanks to the project’s implementation, energy consumption first and heat contagion will be reduced – 1.2 sw. (English)
21 October 2020
0 references
Identifiers
RPWM.04.03.02-28-0003/19
0 references