THERMAL MODERNISATION OF PUBLIC BUILDINGS PBLICNEE_1 (Q132322): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will be implemented. it will be located in the village of Gmina Plantnica. The material scope consists of the thermo-modernisation of buildings used in publ: — TSOs’ remitters: the walls of the inner part of the old part, inquiring into the upper part of the older part, the insulation of the new roof, the insulation of the new roof, the refurbishment of a new roof, a new c.o; — TSOs in the schedule: a wall enquiring about the costu...) |
(Created claim: summary (P836): The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between...) |
||||||||||||||
Property / summary | |||||||||||||||
The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between the heating part and the cellar, repaired. syst. cwu, executing new inst. c.o.; — Health Centre in Speaker: add to the outer walls, dociepl. stropodachów to expand the walls of the basement above the ground, the ceiling over the cellar, the replacement of windows, doors, garage gate, repairs. syst. cwu, excavation of new inst. c.o. – Village candle in Turzy Mała: WW on the ceiling of the attic, electric water heater, boiler for pellets, made. inst. c.o., – OSP firehouse in Wielki Łęck: heat from the outskirts of the old part, warming up the ceiling of the cellar and the walls between the heating part and the cellar, repair. preparation for cooking, replacement of the coal boiler for a low fuel boiler, repairs inst. central heating, by using valves with thermostatic heads. Due to the number of characters, the detailed scope of the work can be found in the Feasibility Study. The above-mentioned activities result from energet audits prepared for the abovementioned buildings. The project also plans to use ICT. The main problem that has become the cause of investment is their low energy efficiency. The implementation of the project will contribute to the achievement of the objectives and assumptions and indicators set out in the WiM RPO for Priority Axis 4. The beneficiaries of the project are mainly users of the above-mentioned public buildings – all residents of Płonica commune. The stages of the project are: preparation of documentation, submission of the application, implementation of construction works and project promotion, monitoring of project implementation, project settlement, supervision of the investment, operation. (English) | |||||||||||||||
Property / summary: The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between the heating part and the cellar, repaired. syst. cwu, executing new inst. c.o.; — Health Centre in Speaker: add to the outer walls, dociepl. stropodachów to expand the walls of the basement above the ground, the ceiling over the cellar, the replacement of windows, doors, garage gate, repairs. syst. cwu, excavation of new inst. c.o. – Village candle in Turzy Mała: WW on the ceiling of the attic, electric water heater, boiler for pellets, made. inst. c.o., – OSP firehouse in Wielki Łęck: heat from the outskirts of the old part, warming up the ceiling of the cellar and the walls between the heating part and the cellar, repair. preparation for cooking, replacement of the coal boiler for a low fuel boiler, repairs inst. central heating, by using valves with thermostatic heads. Due to the number of characters, the detailed scope of the work can be found in the Feasibility Study. The above-mentioned activities result from energet audits prepared for the abovementioned buildings. The project also plans to use ICT. The main problem that has become the cause of investment is their low energy efficiency. The implementation of the project will contribute to the achievement of the objectives and assumptions and indicators set out in the WiM RPO for Priority Axis 4. The beneficiaries of the project are mainly users of the above-mentioned public buildings – all residents of Płonica commune. The stages of the project are: preparation of documentation, submission of the application, implementation of construction works and project promotion, monitoring of project implementation, project settlement, supervision of the investment, operation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between the heating part and the cellar, repaired. syst. cwu, executing new inst. c.o.; — Health Centre in Speaker: add to the outer walls, dociepl. stropodachów to expand the walls of the basement above the ground, the ceiling over the cellar, the replacement of windows, doors, garage gate, repairs. syst. cwu, excavation of new inst. c.o. – Village candle in Turzy Mała: WW on the ceiling of the attic, electric water heater, boiler for pellets, made. inst. c.o., – OSP firehouse in Wielki Łęck: heat from the outskirts of the old part, warming up the ceiling of the cellar and the walls between the heating part and the cellar, repair. preparation for cooking, replacement of the coal boiler for a low fuel boiler, repairs inst. central heating, by using valves with thermostatic heads. Due to the number of characters, the detailed scope of the work can be found in the Feasibility Study. The above-mentioned activities result from energet audits prepared for the abovementioned buildings. The project also plans to use ICT. The main problem that has become the cause of investment is their low energy efficiency. The implementation of the project will contribute to the achievement of the objectives and assumptions and indicators set out in the WiM RPO for Priority Axis 4. The beneficiaries of the project are mainly users of the above-mentioned public buildings – all residents of Płonica commune. The stages of the project are: preparation of documentation, submission of the application, implementation of construction works and project promotion, monitoring of project implementation, project settlement, supervision of the investment, operation. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 17:12, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF PUBLIC BUILDINGS PBLICNEE_1 |
Project in Poland financed by DG Regio |
Statements
1,226,640.84 zloty
0 references
1,533,301.05 zloty
0 references
80.0 percent
0 references
1 December 2016
0 references
30 December 2018
0 references
GMINA PŁOŚNICA
0 references
Przedm. projekt realiz. będzie na terenie gminy wiejskiej - Gmina Płośnica. Zakres rzeczowy proj. obejmuje termomodernizację budynków użyt. publ: - Remizy OSP w Niechłoninie: dociep. ścian zewn. starej cz., dociep. stropodachu nad cz. starszą, docieplenie nowego dachu, uspran. syst. przyg. cwu, wykon. nowej inst. c.o; - Remiza OSP w Płośnicy: dociepl. ścian zewn., dociepl. stropodachów, dociep. stropu piwnicy i ścian miedzy cz. ogrzew. a piwnicą, usprawn. syst. przyg. cwu, wykon. nowej inst. c.o.; - Ośrodka Zdrowia w Płośnicy: dociep. ścian zewn., dociepl. stropodachów dociep. ścian piwnicy nad gruntem, dociep. stropu nad piwnicą, wymiana okien, drzwi, wrót garaż., uspraw. syst. przyg. cwu, wykon. nowej inst. c.o - Świetlica wiejska w Turzy Małej: wym. istn. zawilg. warst. wełny na stropie strychu, wym. elektr. poj. podgrzew. wody, kocioł na pellet, wykon. inst. c.o, , - Remiza OSP w Wielkim Łęcku: dociep. ścan zewn. starej cz., dociep. stropodachu, dociep. stropu piwnicy i ścian między cz. ogrzew. a piwnicą, uspraw. syst. przygot. cwu, wymiana kotła c.o. węglowego na kocioł na paliwo niskoem., usprawn. inst. c.o., poprzez zastosowanie zaworów z głowicami termostatycznymi. Z uwagi na ogran. liczbę znaków, szczegółowy zakres prac znajduje się w Studium Wykonalności. Ww. działania wynikają z audytów energet. sporządzonych dla ww. budynków. W ramach proj. planuje się również wykorzystanie TiK. Głównym problemem, który stał się przyczyną inwestycji jest ich niska efektywność energetyczna. Realizacja projektu wpłynie na osiągnięcie zał. celów oraz założeń i wskaźników określonych w SzOOP RPO WiM dla Osi Priorytetowej 4. Beneficjentem projektu są przede wszystkim użytkownicy ww. budynków użyteczności publicznej - wszyscy mieszkańcy Gminy Płośnica. Etapy realizacji projektu to: przygotowanie dokumentacji, złożenie wniosku, realizacja prac budowlanych i promocja projektu, monitoring realizacji projektu, rozliczenie projektu, nadzór nad inwestycją, eksploatacja. (Polish)
0 references
The project will be in the rural commune – Płonica Municipality. The material scope of the project includes thermomodernisation of buildings using publ: — OSP firehouses in Niechłonin: intensify the outer walls of the old part, warming of the old part, warming of the new roof, spran. syst. syst. ssst. ssst. new inst. c.o.; — OSP fire in Speaker: dociepl. outside walls, dociepl. stropodachów, add to the ceiling of the cellar and the walls between the heating part and the cellar, repaired. syst. cwu, executing new inst. c.o.; — Health Centre in Speaker: add to the outer walls, dociepl. stropodachów to expand the walls of the basement above the ground, the ceiling over the cellar, the replacement of windows, doors, garage gate, repairs. syst. cwu, excavation of new inst. c.o. – Village candle in Turzy Mała: WW on the ceiling of the attic, electric water heater, boiler for pellets, made. inst. c.o., – OSP firehouse in Wielki Łęck: heat from the outskirts of the old part, warming up the ceiling of the cellar and the walls between the heating part and the cellar, repair. preparation for cooking, replacement of the coal boiler for a low fuel boiler, repairs inst. central heating, by using valves with thermostatic heads. Due to the number of characters, the detailed scope of the work can be found in the Feasibility Study. The above-mentioned activities result from energet audits prepared for the abovementioned buildings. The project also plans to use ICT. The main problem that has become the cause of investment is their low energy efficiency. The implementation of the project will contribute to the achievement of the objectives and assumptions and indicators set out in the WiM RPO for Priority Axis 4. The beneficiaries of the project are mainly users of the above-mentioned public buildings – all residents of Płonica commune. The stages of the project are: preparation of documentation, submission of the application, implementation of construction works and project promotion, monitoring of project implementation, project settlement, supervision of the investment, operation. (English)
21 October 2020
0 references
Identifiers
RPWM.04.03.01-28-0079/17
0 references