Thermal modernisation of the school group building in the University of Iława (Q132233): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will be carried out on a building located in a building located on a plot of land with registration number 227 of the Filing system 2, the city of Górowo Iława city. The planned investment involves carrying out a thermal refurbishment of the public building — the school group in the Iława Mountain. The following work is being carried out as part of the thermal modernisation: 1. replacement of windows on the staircase together with...)
(‎Created claim: summary (P836): The project will be carried out on a building located on the plot with the registration number 227 of the registration area 2, the registration unit of the city Górowo Iławeckie. The planned investment consists of a thermal modernisation of the public utility building – the School Complex in Górów Iławecki. As part of the thermal modernisation, the following works are planned: 1. Replacement of windows on the staircase with reduction of glazing...)
Property / summary
 
The project will be carried out on a building located on the plot with the registration number 227 of the registration area 2, the registration unit of the city Górowo Iławeckie. The planned investment consists of a thermal modernisation of the public utility building – the School Complex in Górów Iławecki. As part of the thermal modernisation, the following works are planned: 1. Replacement of windows on the staircase with reduction of glazing surface; 2. insulation of external walls; 3. warming of the floor of the gym; 4. replacement of the main entrance doors to the building; 5. warming of ceilings, construction of a new roof structure; 6. warming of the outer wall of the heated cellar. The project will be implemented in one stage by the company selected according to PZP by the Applicant. The project fits into the assumptions of the SzOOP RPO WiM by fulfilling the limits and limitations in the implementation of projects, in particular: — the selection of actions and their scope and eligibility of expenditure was carried out on the basis of an energy audit – the level of energy efficiency of the project measured by the decrease in energy demand on the basis of calculations included in the energy audit fell from 1802 GJ/year to 974 GJ/year. The annual reduction in energy demand will be 56.2 %, with a reduction in CO2 emissions as a result of thermal modernisation of 54.04 % (English)
Property / summary: The project will be carried out on a building located on the plot with the registration number 227 of the registration area 2, the registration unit of the city Górowo Iławeckie. The planned investment consists of a thermal modernisation of the public utility building – the School Complex in Górów Iławecki. As part of the thermal modernisation, the following works are planned: 1. Replacement of windows on the staircase with reduction of glazing surface; 2. insulation of external walls; 3. warming of the floor of the gym; 4. replacement of the main entrance doors to the building; 5. warming of ceilings, construction of a new roof structure; 6. warming of the outer wall of the heated cellar. The project will be implemented in one stage by the company selected according to PZP by the Applicant. The project fits into the assumptions of the SzOOP RPO WiM by fulfilling the limits and limitations in the implementation of projects, in particular: — the selection of actions and their scope and eligibility of expenditure was carried out on the basis of an energy audit – the level of energy efficiency of the project measured by the decrease in energy demand on the basis of calculations included in the energy audit fell from 1802 GJ/year to 974 GJ/year. The annual reduction in energy demand will be 56.2 %, with a reduction in CO2 emissions as a result of thermal modernisation of 54.04 % (English) / rank
 
Normal rank
Property / summary: The project will be carried out on a building located on the plot with the registration number 227 of the registration area 2, the registration unit of the city Górowo Iławeckie. The planned investment consists of a thermal modernisation of the public utility building – the School Complex in Górów Iławecki. As part of the thermal modernisation, the following works are planned: 1. Replacement of windows on the staircase with reduction of glazing surface; 2. insulation of external walls; 3. warming of the floor of the gym; 4. replacement of the main entrance doors to the building; 5. warming of ceilings, construction of a new roof structure; 6. warming of the outer wall of the heated cellar. The project will be implemented in one stage by the company selected according to PZP by the Applicant. The project fits into the assumptions of the SzOOP RPO WiM by fulfilling the limits and limitations in the implementation of projects, in particular: — the selection of actions and their scope and eligibility of expenditure was carried out on the basis of an energy audit – the level of energy efficiency of the project measured by the decrease in energy demand on the basis of calculations included in the energy audit fell from 1802 GJ/year to 974 GJ/year. The annual reduction in energy demand will be 56.2 %, with a reduction in CO2 emissions as a result of thermal modernisation of 54.04 % (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:00, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the school group building in the University of Iława
Project in Poland financed by DG Regio

    Statements

    0 references
    947,999.33 zloty
    0 references
    227,519.84 Euro
    13 January 2020
    0 references
    1,239,214.81 zloty
    0 references
    297,411.55 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    20 October 2016
    0 references
    9 September 2019
    0 references
    POWIAT BARTOSZYCKI
    0 references

    54°17'19.0"N, 20°29'25.8"E
    0 references
    Przedsięwzięcie realizowane będzie na budynku zlokalizowanym na działce o numerze ewidencyjnym 227 obręb ewidencyjny 2, jednostka ewidencyjna miasto Górowo Iławeckie. Planowana inwestycja polega na przeprowadzeniu termomodernizacji budynku użyteczności publicznej - Zespołu Szkół w Górowie Iławeckim. W ramach termomodernizacji planowanej jest wykonanie następujących prac: 1. wymiana okien na klatce schodowej wraz ze zmniejszeniem powierzchni przeszklenia; 2. ocieplenie ścian zewnętrznych; 3. ocieplenie stropu sali gimnastycznej; 4. wymiana drzwi wejściowych głównych do budynku; 5. docieplenie stropodachu, wykonanie nowej konstrukcji dachu; 6. ocieplenie ściany zewnętrznej ogrzewanej piwnicy. projekt realizowany będzie w jednym etapie przez firmę wyłonioną zgodnie z PZP przez Wnioskodawcę. Projekt wpisuje się w założenia SzOOP RPO WiM poprzez spełnienie limitów i ograniczeń w realizacji projektów, w szczególności: - dobór działań i ich zakres oraz kwalifikowalność wydatków przeprowadzono na podstawie audytu energetycznego - poziom efektywności energetycznej projektu mierzony spadkiem zapotrzebowania na energię na podstawie obliczeń ujętych w audycie energetycznym spadł z 1802 GJ/rok do 974 GJ/rok. Roczne zmniejszenie zapotrzebowania na energię wyniesie 56,2%, - redukcja emisji CO2 na skutek termomodernizacji wynosi 54,04% (Polish)
    0 references
    The project will be carried out on a building located on the plot with the registration number 227 of the registration area 2, the registration unit of the city Górowo Iławeckie. The planned investment consists of a thermal modernisation of the public utility building – the School Complex in Górów Iławecki. As part of the thermal modernisation, the following works are planned: 1. Replacement of windows on the staircase with reduction of glazing surface; 2. insulation of external walls; 3. warming of the floor of the gym; 4. replacement of the main entrance doors to the building; 5. warming of ceilings, construction of a new roof structure; 6. warming of the outer wall of the heated cellar. The project will be implemented in one stage by the company selected according to PZP by the Applicant. The project fits into the assumptions of the SzOOP RPO WiM by fulfilling the limits and limitations in the implementation of projects, in particular: — the selection of actions and their scope and eligibility of expenditure was carried out on the basis of an energy audit – the level of energy efficiency of the project measured by the decrease in energy demand on the basis of calculations included in the energy audit fell from 1802 GJ/year to 974 GJ/year. The annual reduction in energy demand will be 56.2 %, with a reduction in CO2 emissions as a result of thermal modernisation of 54.04 % (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.01-28-0003/18
    0 references