“Extension of the road layout. Behind in Gniezno, on the section from al. Reymont to ul. Osiiec’ (Q135185): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is the extension of the road layout. Behind in Gniezno, on the section from al. Reymont to ul. Osiiec leading to the SSE and the industrial area of Gniezno and thus providing the necessary direct connection with the existing investment sites. In the framework of the project, it is planned to upgrade the existing road connecting Al. Reymonta, ul. Solar in the region. 354 m and construction of a new road on the section from ul. Solar...) |
(Created claim: summary (P836): The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction of a new road on the section from ul. Sunny to St. It is on a length of approx. 450 m. In addition, the investment includes elements necessary to achieve the objective of the project, i.e. light and audible signalling, walkways and cycle paths, surface drainage, vertical and horizontal markings, dismantling of ist. pumping room with sandbox and execution of a new pumping room, as well as the dismantling of the objectives of the lighting luminaires with columns and power cable. Preparation of the project2. Roadworks3. Investor supervision4. Information and promotion of the project as a result of the project will be achieved next indicators:product (key): 0.157 kmL. of reconstructed communal roads: 0,354 kmL. of built roads for bicycles: 0,511 kmproduct (specific to the project):L. built or reconstructed road engineering facilities: 1 pieces of built or reconstructed sidewalks: 0,511 kmL. built or reconstructed lighting points: 12 units of L. built or reconstructed intersections: 3 pieces of result (specific to the project):The average journey time between two points of the network: 1,39 min Road load capacity: 115 kN/axis (English) | |||||||||||||||
Property / summary: The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction of a new road on the section from ul. Sunny to St. It is on a length of approx. 450 m. In addition, the investment includes elements necessary to achieve the objective of the project, i.e. light and audible signalling, walkways and cycle paths, surface drainage, vertical and horizontal markings, dismantling of ist. pumping room with sandbox and execution of a new pumping room, as well as the dismantling of the objectives of the lighting luminaires with columns and power cable. Preparation of the project2. Roadworks3. Investor supervision4. Information and promotion of the project as a result of the project will be achieved next indicators:product (key): 0.157 kmL. of reconstructed communal roads: 0,354 kmL. of built roads for bicycles: 0,511 kmproduct (specific to the project):L. built or reconstructed road engineering facilities: 1 pieces of built or reconstructed sidewalks: 0,511 kmL. built or reconstructed lighting points: 12 units of L. built or reconstructed intersections: 3 pieces of result (specific to the project):The average journey time between two points of the network: 1,39 min Road load capacity: 115 kN/axis (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction of a new road on the section from ul. Sunny to St. It is on a length of approx. 450 m. In addition, the investment includes elements necessary to achieve the objective of the project, i.e. light and audible signalling, walkways and cycle paths, surface drainage, vertical and horizontal markings, dismantling of ist. pumping room with sandbox and execution of a new pumping room, as well as the dismantling of the objectives of the lighting luminaires with columns and power cable. Preparation of the project2. Roadworks3. Investor supervision4. Information and promotion of the project as a result of the project will be achieved next indicators:product (key): 0.157 kmL. of reconstructed communal roads: 0,354 kmL. of built roads for bicycles: 0,511 kmproduct (specific to the project):L. built or reconstructed road engineering facilities: 1 pieces of built or reconstructed sidewalks: 0,511 kmL. built or reconstructed lighting points: 12 units of L. built or reconstructed intersections: 3 pieces of result (specific to the project):The average journey time between two points of the network: 1,39 min Road load capacity: 115 kN/axis (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:41, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Extension of the road layout. Behind in Gniezno, on the section from al. Reymont to ul. Osiiec’ |
Project in Poland financed by DG Regio |
Statements
17,888,065.0 zloty
0 references
23,850,753.34 zloty
0 references
75.0 percent
0 references
27 June 2017
0 references
31 October 2019
0 references
MIASTO GNIEZNO
0 references
Przedmiotem projektu jest rozbudowa układu drogowego ul. Pod Trzema Mostami w Gnieźnie, na odcinku od al. Reymonta do ul. Osiniec, doprowadzającego do terenów SSE i obszaru przemysłowego Miasta Gniezna, a zatem zapewniającej konieczne bezpośrednie połączenie z istniejącymi terenami inwestycyjnymi. W ramach proj. planuje się przebudowę istniejącej drogi łączącej Al. Reymonta z ul. Słoneczną na dł. ok. 354 m oraz budowę nowej drogi na odcinku od ul. Słonecznej do ul. Osieniec na długości ok. 450 m. Ponadto inwestycja obejmuje elementy niezbędne do zrealizowania celu projektu, tj. sygnalizacja świetlna i dźwiękowa, chodniki i drogi rowerowe, odwodnienie powierzchniowe, oznakowanie pionowe i poziome, demontaż ist. przepompowni z piaskownikiem i wykonanie nowej przepompowni, a także demontaż ist. opraw oświetleniowych z słupami oraz kablem zasil. oraz zasilania demontowanej ist. przepompowni i oświetlenie oprawami LED oraz poszerzenie światła wiaduktu, jego pogłębienie i wykonanie nowych ścian oporowych w celu dostosowania do parametrów spełniających aktualne przepisyW ramach projektu zrealizowane zostaną nast. zadania:1. Przygotowanie projektu2. Roboty drogowe3. Nadzór inwestorski4. Informacja i promocja projektuW efekcie real. projektu osiągnięte zostaną nast. wskaźniki:produktu (kluczowe):Dł. wybudowanych dróg gminnych: 0,157 kmDł. przebudowanych dróg gminnych: 0,354 kmDł. wybudowanych dróg dla rowerów: 0,511 kmproduktu (specyficzne dla projektu):L. wybudowanych lub przebudowanych drogowych obiektów inżynierskich: 1 szt.Dł. wybudowanych lub przebudowanych chodników: 0,511 kmL. wybudowanych lub przebudowanych punktów oświetleniowych: 12 szt.L. wybudowanych lub przebudowanych skrzyżowań: 3 szt.rezultatu (specyficzne dla projektu):Średni czas przejazdu między dwoma punktami sieci: 1,39 minNośność drogi: 115 kN/oś (Polish)
0 references
The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction of a new road on the section from ul. Sunny to St. It is on a length of approx. 450 m. In addition, the investment includes elements necessary to achieve the objective of the project, i.e. light and audible signalling, walkways and cycle paths, surface drainage, vertical and horizontal markings, dismantling of ist. pumping room with sandbox and execution of a new pumping room, as well as the dismantling of the objectives of the lighting luminaires with columns and power cable. Preparation of the project2. Roadworks3. Investor supervision4. Information and promotion of the project as a result of the project will be achieved next indicators:product (key): 0.157 kmL. of reconstructed communal roads: 0,354 kmL. of built roads for bicycles: 0,511 kmproduct (specific to the project):L. built or reconstructed road engineering facilities: 1 pieces of built or reconstructed sidewalks: 0,511 kmL. built or reconstructed lighting points: 12 units of L. built or reconstructed intersections: 3 pieces of result (specific to the project):The average journey time between two points of the network: 1,39 min Road load capacity: 115 kN/axis (English)
21 October 2020
0 references
Identifiers
RPWP.05.01.02-30-0016/16
0 references