RES investments in the company COWIK in Bartoszyce (Q132014): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of a photovoltaic installation located in the municipality of Bartoszyce (12/3 on Bartoszyce). Outdoor installation constructed on the basis of polymorphic panels, solar photovoltaic design installation with the total installed capacity of 99,90kWp in photovoltaic panels, on the ground. The installation will consist of 333 PV panels of 300 W and 4 units. Inverter 25 kW. Method of implementation: the pro...)
(‎Created claim: summary (P836): The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25...)
Property / summary
 
The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25 kW inverter. Method of implementation: the project will be implemented independently by the Applicant. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the pp. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the assumed harm. —completing the project and signing the final protocol -final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
Property / summary: The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25 kW inverter. Method of implementation: the project will be implemented independently by the Applicant. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the pp. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the assumed harm. —completing the project and signing the final protocol -final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25 kW inverter. Method of implementation: the project will be implemented independently by the Applicant. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the pp. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the assumed harm. —completing the project and signing the final protocol -final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:36, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RES investments in the company COWIK in Bartoszyce
Project in Poland financed by DG Regio

    Statements

    0 references
    516,910.57 zloty
    0 references
    124,058.54 Euro
    13 January 2020
    0 references
    608,130.08 zloty
    0 references
    145,951.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    31 March 2019
    0 references
    WODOCIAGOWO-CIEPŁOWNICZA SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA "COWIK" W BARTOSZYCACH
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznych zlokalizowanej Gminie Miasto Bartoszyce (działa 12/3 w obrębie ewidencyjnym Bartoszyce). Instalacja gruntowe wybudowane w oparciu o panele polimorficzne, fotowoltaiczne Projektowana instalacja fotowoltaiczna o łącznej mocy zainstalowanej 99,90kWp w panelach fotowoltaicznych, posadowiona na gruncie. W skład danej instalacji będzie wchodzić 333 szt. paneli fotowoltaicznych 300W oraz 4 szt. Inwertera 25 kW. Sposób wdrażania: projekt wdrażany będzie samodzielnie przez Wnioskodawcę. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z zasadą pzp. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harm. -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25 kW inverter. Method of implementation: the project will be implemented independently by the Applicant. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the pp. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the assumed harm. —completing the project and signing the final protocol -final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0425/16
    0 references