RES investments in the ‘House of Paris’ (Q131956): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The applicant plans to carry out an investment consisting of installing solar panels in the existing infrastructure of the Applicant’s infrastructure in the location of Wars4, parcel 12/44, Bartoszyce. A photovoltaic system with a nominal power output of 40 kWp is provided for, consisting of 125 units of 320Wp unit, which is connected to the mains electricity distribution grid directly into the low-voltage electrical system. The whole installa...) |
(Created claim: summary (P836): The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be...) |
||||||||||||||
Property / summary | |||||||||||||||
The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English) | |||||||||||||||
Property / summary: The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 16:34, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RES investments in the ‘House of Paris’ |
Project in Poland financed by DG Regio |
Statements
181,330.57 zloty
0 references
213,330.08 zloty
0 references
85.0 percent
0 references
28 September 2016
0 references
30 November 2018
0 references
"POD SKRZYDŁAMI" DOM WESELNY-ZAJAZD-NOCLEGI ALEKSANDER BUKS
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Wardomy 4, działka 12/44 gmina Bartoszyce. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp składający się z 125 modułów o mocy jednostkowej 320Wp, podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektrycznej niskiego napięcia. Całość instalacji będzie posadowiona na budynku i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
0 references
The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0342/16
0 references