Construction of sanitary sewerage to improve infrastructure for the village of carmine, Sosnica, Fabians, Lutynia (Q135043): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a water sanitation network for the discharge of domestic waste water in the municipality of Dobrzyca (Dobrzyca agglomeration — PLWL072). the project has been divided into 1,2,3,4,5,6. Zad 1 Includes localities: Carmine, Sosnica, Fabian. For works, provision is made for the construction of a canton of sanit. gravity. O160-200 mm located in the lanes of the county and municipal roads (Fabians ul. New, Kwi...)
(‎Created claim: summary (P836): The project includes the construction of sanitary sewerage network for the drainage of household and economic sewage 'in Dobrzyca commune (agglomeration Dobrzyca – PLWL072). the project has been divided into ass 1,2,3,4,5,6. Zad 1 Includes the villages: Carmine, Sośnica, Fabian. In the scope of works, the construction of can. sanit. gravity pipelines is foreseen. O160-200 mm located in strips of district and communal roads (Fabianów ul. Nowy, Kw...)
Property / summary
 
The project includes the construction of sanitary sewerage network for the drainage of household and economic sewage 'in Dobrzyca commune (agglomeration Dobrzyca – PLWL072). the project has been divided into ass 1,2,3,4,5,6. Zad 1 Includes the villages: Carmine, Sośnica, Fabian. In the scope of works, the construction of can. sanit. gravity pipelines is foreseen. O160-200 mm located in strips of district and communal roads (Fabianów ul. Nowy, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) powiat roads:4309P, 4174P, 4321P,4326P,4323P dr. 628591P, 628551P, 628592P, 628650P,628551P,628566P) and segmentally on private land with branches O160 mm brought to the property border with PVCO315 mm wells. The gravitational collectors. PVCf200 mm 8159.6 mb Canal branching. PVCf160 mm 190/1070,2 pcs/mm PEf160 mm 3452.2 mb Pressing pipe PEf110 mm 1865.6 mb Pressing pipe PEf90 mm 1403.1 mb Power effluent PS 3 pcs Aerating-air valves ZNO 7 pcs Cable energ. YAKY (ext. power lines) 22 m Zad 2 covers the town of Lutynia. In the scope of works, the construction of pipelines of can. sanit. gravitational.O200 mm located in the strips of communal roads (municipal dres:628650P, 628525P, 628524P) and segmentally on private land, together with branches O160 mm led to the boundaries of the property ended with wells. The gravitational collectors. PVCf200 mm 1302.1 mb, canal branches. PVCf160 mm 32/213.0 (pcs/mb), PEf90 mm discharge pipe 967.7 mb Power drainage systems PS 1 pcs Zad3 Promotion. Zad4 Investment Oversight. Zad5 Dok. – preparation of the project for m. Karmin, Sośnica, Fabianów. Zad6 Dok. -Project preparation for m. February. In total, 18433.50mb gravitational collectors, canal branches and press pipelines will be built as part of the project. The value of the project is PLN 6747131.96, including eligible costs. 5317930.02PLN, ineligible costs.1429201.94PLN, planned amount of dofin. IT’S $3390180.38. (English)
Property / summary: The project includes the construction of sanitary sewerage network for the drainage of household and economic sewage 'in Dobrzyca commune (agglomeration Dobrzyca – PLWL072). the project has been divided into ass 1,2,3,4,5,6. Zad 1 Includes the villages: Carmine, Sośnica, Fabian. In the scope of works, the construction of can. sanit. gravity pipelines is foreseen. O160-200 mm located in strips of district and communal roads (Fabianów ul. Nowy, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) powiat roads:4309P, 4174P, 4321P,4326P,4323P dr. 628591P, 628551P, 628592P, 628650P,628551P,628566P) and segmentally on private land with branches O160 mm brought to the property border with PVCO315 mm wells. The gravitational collectors. PVCf200 mm 8159.6 mb Canal branching. PVCf160 mm 190/1070,2 pcs/mm PEf160 mm 3452.2 mb Pressing pipe PEf110 mm 1865.6 mb Pressing pipe PEf90 mm 1403.1 mb Power effluent PS 3 pcs Aerating-air valves ZNO 7 pcs Cable energ. YAKY (ext. power lines) 22 m Zad 2 covers the town of Lutynia. In the scope of works, the construction of pipelines of can. sanit. gravitational.O200 mm located in the strips of communal roads (municipal dres:628650P, 628525P, 628524P) and segmentally on private land, together with branches O160 mm led to the boundaries of the property ended with wells. The gravitational collectors. PVCf200 mm 1302.1 mb, canal branches. PVCf160 mm 32/213.0 (pcs/mb), PEf90 mm discharge pipe 967.7 mb Power drainage systems PS 1 pcs Zad3 Promotion. Zad4 Investment Oversight. Zad5 Dok. – preparation of the project for m. Karmin, Sośnica, Fabianów. Zad6 Dok. -Project preparation for m. February. In total, 18433.50mb gravitational collectors, canal branches and press pipelines will be built as part of the project. The value of the project is PLN 6747131.96, including eligible costs. 5317930.02PLN, ineligible costs.1429201.94PLN, planned amount of dofin. IT’S $3390180.38. (English) / rank
 
Normal rank
Property / summary: The project includes the construction of sanitary sewerage network for the drainage of household and economic sewage 'in Dobrzyca commune (agglomeration Dobrzyca – PLWL072). the project has been divided into ass 1,2,3,4,5,6. Zad 1 Includes the villages: Carmine, Sośnica, Fabian. In the scope of works, the construction of can. sanit. gravity pipelines is foreseen. O160-200 mm located in strips of district and communal roads (Fabianów ul. Nowy, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) powiat roads:4309P, 4174P, 4321P,4326P,4323P dr. 628591P, 628551P, 628592P, 628650P,628551P,628566P) and segmentally on private land with branches O160 mm brought to the property border with PVCO315 mm wells. The gravitational collectors. PVCf200 mm 8159.6 mb Canal branching. PVCf160 mm 190/1070,2 pcs/mm PEf160 mm 3452.2 mb Pressing pipe PEf110 mm 1865.6 mb Pressing pipe PEf90 mm 1403.1 mb Power effluent PS 3 pcs Aerating-air valves ZNO 7 pcs Cable energ. YAKY (ext. power lines) 22 m Zad 2 covers the town of Lutynia. In the scope of works, the construction of pipelines of can. sanit. gravitational.O200 mm located in the strips of communal roads (municipal dres:628650P, 628525P, 628524P) and segmentally on private land, together with branches O160 mm led to the boundaries of the property ended with wells. The gravitational collectors. PVCf200 mm 1302.1 mb, canal branches. PVCf160 mm 32/213.0 (pcs/mb), PEf90 mm discharge pipe 967.7 mb Power drainage systems PS 1 pcs Zad3 Promotion. Zad4 Investment Oversight. Zad5 Dok. – preparation of the project for m. Karmin, Sośnica, Fabianów. Zad6 Dok. -Project preparation for m. February. In total, 18433.50mb gravitational collectors, canal branches and press pipelines will be built as part of the project. The value of the project is PLN 6747131.96, including eligible costs. 5317930.02PLN, ineligible costs.1429201.94PLN, planned amount of dofin. IT’S $3390180.38. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of sanitary sewerage to improve infrastructure for the village of carmine, Sosnica, Fabians, Lutynia
Project in Poland financed by DG Regio

    Statements

    0 references
    3,390,180.38 zloty
    0 references
    813,643.29 Euro
    13 January 2020
    0 references
    5,317,930.02 zloty
    0 references
    1,276,303.2 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    26 November 2015
    0 references
    30 June 2018
    0 references
    GMINA DOBRZYCA
    0 references
    Projekt obejmuje budowę sieci kanalizacji sanit. dla odprowadzenia ścieków bytowo-gospodarczych `w Gminie Dobrzyca (aglomeracja Dobrzyca - PLWL072). projekt został podzielony na zad 1,2,3,4,5,6. Zad 1 Obejmuje miejscowości: Karmin, Sośnica, Fabianów. W zakresie robót przewidziano wykonanie rurociągów kan. sanit. grawit. O160-200mm zlokalizowanych w pasach dróg powiatowych i gminnych (Fabianów ul. Nowa, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) drogi powiatowe:4309P, 4174P, 4321P,4326P,4323P dr gminne: 628591P, 628551P, 628592P, 628650P,628551P,628566P) oraz odcinkowo na gruntach prywatnych wraz z odgałęzieniami O160mm doprowadzonymi do granicy posesji zakończonych studzienkami PVCO315mm Zakres zadania: Kolektory grawit. PVCf200mm 8159,6 mb Odgałęzienia kan. PVCf160mm 190/1070,2 szt/mb Rurociąg tłoczny PEf160mm 3452,2 mb Rurociąg tłoczny PEf110mm 1865,6 mb Rurociąg tłoczny PEf90mm 1403,1 mb Przepomp. ścieków sieciowe PS 3 szt Zawory napowietrzająco-odpowietrzające ZNO 7 szt Kable energ. YAKY (wew. linie zasilające) 22m Zad 2 Obejmuje miejscowość Lutynia. W zakresie robót przewidziano wykonanie rurociągów kan. sanit. grawit.O200mm zlokalizowanych w pasach dróg gminnych (dr gminne:628650P, 628525P, 628524P) oraz odcinkowo na gruntach prywatnych wraz z odgałęzieniami O160mm doprowadzonymi do granicy posesji zakończonych studzienkami Zakres zadania: Kolektory grawit. PVCf200mm 1302,1 mb, odgałęzienia kan. PVCf160mm 32/213,0 (szt/mb), Rurociąg tłoczny PEf90mm 967,7 mb Przepompownie ścieków sieciowe PS 1 szt Zad3 Promocja. Zad4 Nadzór inwest. Zad5 Dok. - przygotowanie projektu dla m. Karmin, Sośnica, Fabianów. Zad6 Dok. -przygotowanie projektu dla m. Lutynia. Łącznie w ramach projektu zostanie wybudowanych 18433,50mb kolektorów grawitacyjnych, odgałęzień kan. i rurociągów tłocznych. Wartość projektu to 6747131,96PLN w tym koszty kwalifik. 5317930,02PLN, koszty niekwalifik.1429201,94PLN, planowana kwota dofin. to: 3390180,38PLN. (Polish)
    0 references
    The project includes the construction of sanitary sewerage network for the drainage of household and economic sewage 'in Dobrzyca commune (agglomeration Dobrzyca – PLWL072). the project has been divided into ass 1,2,3,4,5,6. Zad 1 Includes the villages: Carmine, Sośnica, Fabian. In the scope of works, the construction of can. sanit. gravity pipelines is foreseen. O160-200 mm located in strips of district and communal roads (Fabianów ul. Nowy, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) powiat roads:4309P, 4174P, 4321P,4326P,4323P dr. 628591P, 628551P, 628592P, 628650P,628551P,628566P) and segmentally on private land with branches O160 mm brought to the property border with PVCO315 mm wells. The gravitational collectors. PVCf200 mm 8159.6 mb Canal branching. PVCf160 mm 190/1070,2 pcs/mm PEf160 mm 3452.2 mb Pressing pipe PEf110 mm 1865.6 mb Pressing pipe PEf90 mm 1403.1 mb Power effluent PS 3 pcs Aerating-air valves ZNO 7 pcs Cable energ. YAKY (ext. power lines) 22 m Zad 2 covers the town of Lutynia. In the scope of works, the construction of pipelines of can. sanit. gravitational.O200 mm located in the strips of communal roads (municipal dres:628650P, 628525P, 628524P) and segmentally on private land, together with branches O160 mm led to the boundaries of the property ended with wells. The gravitational collectors. PVCf200 mm 1302.1 mb, canal branches. PVCf160 mm 32/213.0 (pcs/mb), PEf90 mm discharge pipe 967.7 mb Power drainage systems PS 1 pcs Zad3 Promotion. Zad4 Investment Oversight. Zad5 Dok. – preparation of the project for m. Karmin, Sośnica, Fabianów. Zad6 Dok. -Project preparation for m. February. In total, 18433.50mb gravitational collectors, canal branches and press pipelines will be built as part of the project. The value of the project is PLN 6747131.96, including eligible costs. 5317930.02PLN, ineligible costs.1429201.94PLN, planned amount of dofin. IT’S $3390180.38. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.04.03.01-30-0027/16
    0 references