Development of the public transport system, the city of Kalisz, in conjunction with the modernisation of street lighting — the City of Kalisz (Q134963): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Terms of reference for the execution of 6 types of projects, see point below. 1.12, included in 5 groups of tasks: 1) Purchase of 11 low-level bus. 902, 2) Reconstruction of urban public transport, including bicycle lanes, by: (a) junction of the junction of the junction of the junction of the junction of the junction of the junction of the junction of the junction of the junction of the junction of the (1 units) with the necessary infrastruct...)
(‎Created claim: summary (P836): Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the pr...)
Property / summary
 
Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the proper functionalities of the node, the location in the railway station area. and the bus.; residents of M.Kalisz, AKO and tourists within the node will move through transp. means such as: autob. Urban/suburban/long-distance, train, car car, bicycle.; the knot will consist first of the following: parking spaces. for autob. and parking lot Park&Ride – 1pcs. (183 parking spaces, of which 9 are indicated for the disabled) along with manoeuvring roads and communiques, car parks Bike &Ride – 1pcs. (number of posts: 20pcs.), bus bays., sidewalks with access to bike traffic., walking-bike lines. and bike paths. (total: 0.607 km) – the scope of the item is detailed in point. 3.4 of the proposal and the SW; B) equipment exists. bus stops. with telematics equipment – dynam boards. inform passenger. (10 pieces) and ticket machines (6 pieces). 3) Expansion of the traffic management and organisation system – integration into the ITS of a built light signal at the crossroads ul. Staszica and the Mountain. 4) Modernisation of lighting. street. increasing its energy efficiency within 2 Kalisz settlements: Winiary and Rypinek – as a result 847 light points will be installed. 5) The info-promo campaign (1 pcs.) – a package of soft activities aimed at bringing citizens closer to the subject of low emissions and to present activities that can be used in everyday life to reduce low emissions – including, above all, activities designed to induce inmates to reduce the use of cars and replace them in daily travels by public transport or non-motorism, i.e. moving by bicycle or on foot. (English)
Property / summary: Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the proper functionalities of the node, the location in the railway station area. and the bus.; residents of M.Kalisz, AKO and tourists within the node will move through transp. means such as: autob. Urban/suburban/long-distance, train, car car, bicycle.; the knot will consist first of the following: parking spaces. for autob. and parking lot Park&Ride – 1pcs. (183 parking spaces, of which 9 are indicated for the disabled) along with manoeuvring roads and communiques, car parks Bike &Ride – 1pcs. (number of posts: 20pcs.), bus bays., sidewalks with access to bike traffic., walking-bike lines. and bike paths. (total: 0.607 km) – the scope of the item is detailed in point. 3.4 of the proposal and the SW; B) equipment exists. bus stops. with telematics equipment – dynam boards. inform passenger. (10 pieces) and ticket machines (6 pieces). 3) Expansion of the traffic management and organisation system – integration into the ITS of a built light signal at the crossroads ul. Staszica and the Mountain. 4) Modernisation of lighting. street. increasing its energy efficiency within 2 Kalisz settlements: Winiary and Rypinek – as a result 847 light points will be installed. 5) The info-promo campaign (1 pcs.) – a package of soft activities aimed at bringing citizens closer to the subject of low emissions and to present activities that can be used in everyday life to reduce low emissions – including, above all, activities designed to induce inmates to reduce the use of cars and replace them in daily travels by public transport or non-motorism, i.e. moving by bicycle or on foot. (English) / rank
 
Normal rank
Property / summary: Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the proper functionalities of the node, the location in the railway station area. and the bus.; residents of M.Kalisz, AKO and tourists within the node will move through transp. means such as: autob. Urban/suburban/long-distance, train, car car, bicycle.; the knot will consist first of the following: parking spaces. for autob. and parking lot Park&Ride – 1pcs. (183 parking spaces, of which 9 are indicated for the disabled) along with manoeuvring roads and communiques, car parks Bike &Ride – 1pcs. (number of posts: 20pcs.), bus bays., sidewalks with access to bike traffic., walking-bike lines. and bike paths. (total: 0.607 km) – the scope of the item is detailed in point. 3.4 of the proposal and the SW; B) equipment exists. bus stops. with telematics equipment – dynam boards. inform passenger. (10 pieces) and ticket machines (6 pieces). 3) Expansion of the traffic management and organisation system – integration into the ITS of a built light signal at the crossroads ul. Staszica and the Mountain. 4) Modernisation of lighting. street. increasing its energy efficiency within 2 Kalisz settlements: Winiary and Rypinek – as a result 847 light points will be installed. 5) The info-promo campaign (1 pcs.) – a package of soft activities aimed at bringing citizens closer to the subject of low emissions and to present activities that can be used in everyday life to reduce low emissions – including, above all, activities designed to induce inmates to reduce the use of cars and replace them in daily travels by public transport or non-motorism, i.e. moving by bicycle or on foot. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:17, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the public transport system, the city of Kalisz, in conjunction with the modernisation of street lighting — the City of Kalisz
Project in Poland financed by DG Regio

    Statements

    0 references
    30,935,248.45 zloty
    0 references
    7,424,459.63 Euro
    13 January 2020
    0 references
    36,394,409.96 zloty
    0 references
    8,734,658.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 January 2017
    0 references
    29 November 2019
    0 references
    MIASTO KALISZ
    0 references
    0 references
    Zakres rzecz. proj. dot. realizacji 6 typów przedsięwzięć wskaz. w pkt. 1.12, ujętych w 5 grupach zadań: 1) Zakup 11 niskoemis. autobus. hybrydowych przystos. do potrzeb os. niepełnosp., o łącznej poj. 902 os., 2) Rozbudowa infr. transportu publ. miasta, w tym systemu ścieżek rower., poprzez: a) bud. zintegr. węzła przesiadk. (1 szt.) wraz z przynależną infrastrukturą techn. i drog. umożliwiającą właściwe funkcjon. węzła, zlokaliz. w rejonie dworców kolej. i autobus.; mieszkańcy M.Kalisza, AKO oraz turyści w obrębie węzła będą przemieszczać się pom. środkami transp. takimi jak: autob. miejski/podmiejski/dalekobieżny, pociąg, samochód os., rower.; węzeł składać będzie się przede wsz. z: miejsc postoj. dla autob. i parkingu Park&Ride – 1szt. (183 miejsc postoj., w tym 9 wyznacz. dla os. niepełnospr.) wraz z drogami manewrowymi i ciągami komunukac., parkingów Bike&Ride – 1szt. (liczba stanowisk: 20szt.), zatok autobus., chodników z dopuszcz. ruchu rower., ciągów pieszo-rower. i ścieżek rower. (łączna dł.: 0,607km) – szczegółowo zakres rzecz. zadania przedstawiono w pkt. 3.4 wniosku i SW; b) wyposażenie istniej. przystanków autobus. w urządzenia z zakresu telematyki – tablice dynam. inform. pasażer. (10 szt.) i biletomaty (6szt.). 3) Rozbudowa systemu zarządzania i organizacji ruchu – włączenie do ITS budowanej sygnal. świetlanej na skrzyż. ul. Staszica i Górnośl. 4) Modernizacja oświetl. uliczn. zwiększająca jego energooszcz. w obrębie 2 osiedli Kalisza: Winiary i Rypinek – w efekcie zamontowanych zostanie 847 szt. punktów świetl. 5) Kampania info-promo (1 szt.) – pakiet miękkich działań mających przybliżyć mieszkańcom tematykę niskiej emisji oraz przedstawić możliwe do wykorzystania w codziennym życiu działania ograniczające niską emisję – w tym przede wsz. działania mające nakłonić mieszk. do ogranicz. korzystania z samochodów os. i zastępowania ich w codziennych podróżach komunikacją publ. lub niezmotoryz. tj. przemieszczania się rowerem lub pieszo. (Polish)
    0 references
    Scope of item. project on implementation of 6 types of projects indicated in point. 1.12, included in 5 groups of tasks: 1) Purchase 11 low-emission. bus. hybrid harness to the needs of a part-party, with a total capacity. 902 pers., 2) Expansion of infr. transport publ. of the city, including the system of bike paths., by: a) Built-in. interchange nodes. (1 pieces) together with the associated technical infrastructure and roads. enabling the proper functionalities of the node, the location in the railway station area. and the bus.; residents of M.Kalisz, AKO and tourists within the node will move through transp. means such as: autob. Urban/suburban/long-distance, train, car car, bicycle.; the knot will consist first of the following: parking spaces. for autob. and parking lot Park&Ride – 1pcs. (183 parking spaces, of which 9 are indicated for the disabled) along with manoeuvring roads and communiques, car parks Bike &Ride – 1pcs. (number of posts: 20pcs.), bus bays., sidewalks with access to bike traffic., walking-bike lines. and bike paths. (total: 0.607 km) – the scope of the item is detailed in point. 3.4 of the proposal and the SW; B) equipment exists. bus stops. with telematics equipment – dynam boards. inform passenger. (10 pieces) and ticket machines (6 pieces). 3) Expansion of the traffic management and organisation system – integration into the ITS of a built light signal at the crossroads ul. Staszica and the Mountain. 4) Modernisation of lighting. street. increasing its energy efficiency within 2 Kalisz settlements: Winiary and Rypinek – as a result 847 light points will be installed. 5) The info-promo campaign (1 pcs.) – a package of soft activities aimed at bringing citizens closer to the subject of low emissions and to present activities that can be used in everyday life to reduce low emissions – including, above all, activities designed to induce inmates to reduce the use of cars and replace them in daily travels by public transport or non-motorism, i.e. moving by bicycle or on foot. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.03.04-30-0001/17
    0 references